PROCEDURE FOR REQUEST FOR SERVICES. 3.1 The RL shall submit the request for the Point-to-Point Connection (“Request”) via email. 3.2 NLT shall conduct a desktop study to evaluate the feasibility of supplying the Point-to-Point Connection, and shall issue a desktop study report on the details of the proposed deployment of the Point-to-Point Connection, which may include (but is not limited to) the following information: 3.2.1 Distance of the proposed fibre route; and 3.2.2 The theoretical signal loss applicable for the proposed fibre route. 3.3 NLT shall conduct a site survey to assess the cable routing for the Point-to-Point Connection, and shall provide the site survey report to the RL within five (5) Business Days of the site survey. 3.4 The RL shall obtain all necessary approvals, permits and consents (including approvals from the relevant building manager) at its own cost to facilitate NLT’s access to all necessary areas within the relevant Designated Building, and all works relating to the Point-to-Point Connection (including but not limited to any subsequent repair, replacement or upgrade to any equipment or facility forming part of the Point-to-Point Connection).
Appears in 2 contracts
Sources: Customised Agreement, Provisioning Agreement
PROCEDURE FOR REQUEST FOR SERVICES. 3.1 The RL shall submit the request for the Point-to-Point Connection Connections (“Request”) via email.
3.2 NLT shall conduct a desktop study to evaluate the feasibility of supplying the Point-to-Point ConnectionConnections, and shall issue a desktop study report on the details of the proposed deployment of the Point-to-Point ConnectionConnections, which may include (but is not limited to) the following information:
3.2.1 Distance of the proposed fibre route; and
3.2.2 The theoretical signal loss applicable for the proposed fibre route.
3.3 NLT shall conduct a site survey to assess the cable routing for the each Point-to-Point Connection, and shall provide the site survey report to the RL within five (5) Business Days business days of the site survey.
3.4 The RL shall obtain all necessary approvals, permits and consents (including approvals from the relevant building manager) at its own cost to facilitate NLT’s access to all necessary areas within the relevant Designated Building, and all works relating to the Point-to-Point Connection (including but not limited to any subsequent repair, replacement or upgrade to any equipment or facility forming part of the Point-to-Point Connection).
Appears in 1 contract
Sources: Customised Agreement