Project Baseline Schedule Update Requirements Sample Clauses

Project Baseline Schedule Update Requirements. Developer shall provide schedule updates that comply with all PBS requirements. Data dates for schedule updates shall be the day after the progress period closes. No changes in activity durations, calendar assignments, logic ties, or constraints will be allowed without TxDOT’s written Approval. Developer shall show actual progress for each activity in the schedule updates such as: a) Actual start and finish dates for completed activities; b) Actual start dates, physical percent complete and remaining duration for activities in progress; c) Projected sequences of activities for future Work; d) Revised relationships and durations for unfinished activities, if warranted; and e) A well-defined Critical Path. For each schedule update, Developer shall ensure that: a) Planned budget values match total Project cost or revised total Project cost inclusive of all authorized Change Orders; and b) All planning changes, adjustments, or revisions in sequencing and timing of the remaining Work are accurately represented. If Work is performed out of sequence, Developer is required to implement logic changes consistent with the retained logic method of scheduling to allow the out-of-sequence Work to proceed. Through schedule updates, Developer may demonstrate proposed modifications to planned Work that require adding or deleting activities, changing activity descriptions, or revising activity durations or logic that are consistent with the following requirements: a) No changes are to disrupt the integrity or comparative relationship between current and previously approved PBSs or schedule updates; b) An activity ID can only be used once (i.e., do not delete an activity then create a new activity at a later date utilizing the same activity ID); c) Activity descriptions may be revised for clarification, but are not to be altered to represent a different scope than originally intended. For example, an earthwork activity may be further defined by adding station limits but the description cannot be changed to concrete paving with related logic ties; and d) If changes impacting the Critical Path result in an extension of the Substantial Completion Deadline, beyond contractual limits, Developer shall be required to submit a time impact analysis.
Project Baseline Schedule Update Requirements. Developer shall provide schedule updates that comply with all PBS requirements. Data dates for schedule updates shall be the day after the progress period closes. No changes in activity durations, calendar assignments, logic ties, or constraints will be allowed without TxDOT’s written Approval. Developer shall show actual progress for each activity in the schedule updates such as: a) Actual start and finish dates for completed activities; b) Actual start dates, physical percent complete and remaining duration for activities in progress; c) Projected sequences of activities for future Work; d) Revised relationships and durations for unfinished activities, if warranted; and e) A well-defined Critical Path. For each schedule update, Developer shall ensure that:

Related to Project Baseline Schedule Update Requirements

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Specific Requirements compensation insurance with statutory limits required by South Dakota law. Coverage B-Employer’s Liability coverage of not less than $500,000 each accident, $500,000 disease-policy limit, and $500,000 disease-each employee.

  • Software Requirements 7 Developer shall prepare the Project Schedule using Oracle’s Primavera P6.

  • Project Requirements 1. Project must conform to regulations under 24 CFR Part 92, commonly known as the HOME Regulations.

  • Developer Operating Requirements The Developer must comply with the Transmission Owner’s operating instructions and requirements including but not limited to Transmission Owner’s Operation Coordination Agreement, as it may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Whether or not the Large Generating Facility is eligible for the Transition Period LVRT Standard set forth in Appendix G will be determined by the Commission. The Large Generating Facility will comply with the Transition Period LVRT Standard pending issuance of an order by the Commission determining the appropriate LVRT standard. For purposes of compliance with Appendix G, the Transmission Owner has determined that the Developer shall maintain the Large Generating Facility in service during a three-phase fault for 7 cycles. Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. All personnel working in Transmission Owner’s facilities will require security background checks prior to entering and working in such facilities. New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Senior Vice President of Transmission New York Power Authority ▇▇▇ ▇▇▇▇ ▇▇. ▇▇▇▇▇ ▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇-▇▇▇▇ Re: Large Generating Facility Dear : On [Date] [Developer] has completed Trial Operation of Unit No. . This letter confirms that [Developer] commenced Commercial Operation of Unit No. at the Large Generating Facility, effective as of [Date plus one day]. Thank you. NYISO: