Project Demand Clause Samples

Project Demand. Peak sewer flow from the Project’s On-Site Sewer Lift Station is derived from the Beaumont Pointe Development Sewer Lift Station and Force Main Preliminary Design Report dated October 2023 (“On-Site PDR”). The On-Sight PDR identifies a peak dry weather sewer flow of 170 GPM from the Project and a peak sewer flow of 233 GPM from the On-Site Sewer Lift Station to the Beaumont Crossroads Lift Station (“Reserved Off-Site Flow”). The Crossroads Design Memorandum for the downstream Crossroads Lift Station (as defined in 2.8.3) sizes the Crossroads Lift Station Upgrades based on this peak sewer flow of 233GPM. The On-Site PDR derives the peak sewer information based upon the land uses, building square footage and acreage for the Project as provided in the Crossroads Design Memorandum and Table 1 in Exhibit “E” to this Agreement. The Crossroads Design Memorandum (Table 2 to Exhibit “E”) also identifies the peak sewer generation flows for each Planning Area within the Project based upon the uses, square footage and acreage in Table 1 of Exhibit “E” to this Agreement. The On-Site PDR has not been approved by City and is subject to further study and analysis by the City’s consultants. Therefore, the On-Site PDR and Exhibit “E” are subject to such modification and change as determined by the City’s consultant and such study with changes and modifications shall be deemed and defined as the On-Site PDR. Except as set forth in this Section 2.12, peak sewer flow from the Project to the Crossroads Lift Station shall be limited to the Reserved Off-Site Flow. In light of the construction by Owner of the Crossroads Lift Station Upgrades creating the Reserved Off-Site Flow, the Reserved Off-Site Flow for the Project is reserved as a vested right. If the Reserved Off-Site Flow to the Crossroads Lift Station is modified in any revised On-Site PDR, the Parties shall record a Minor Amendment to this Agreement establishing the new Reserved Off-Site Flow and the sizing of the Crossroads Lift Station Upgrades shall be adjusted accordingly. The On-Site PDR and the Crossroads Design Memorandum shall not impose a requirement on Owner to design or construct peak sewer flow capacity over and above that required for the Project except with regards to the Additional Wet Well Capacity (as defined in 2.8.3).
Project Demand. Peak sewer flow from the Project’s On-Site Sewer Lift Station is derived from the Beaumont Pointe Development Sewer Lift Station and Force Main Preliminary Design Report dated October 2023 (“On-Site PDR”). The On-Sight PDR identifies a peak dry weather sewer flow of 170 GPM from the Project and a peak sewer flow of 233 GPM from the On-Site Sewer Lift Station to the Beaumont Crossroads Lift Station (“Reserved Off-Site Flow”). The Crossroads Design Memorandum for the downstream Crossroads Lift Station (as defined in 2.8.3) sizes the Crossroads Lift Station Upgrades based on this peak sewer flow of 233GPM. The On-Site PDR derives the peak sewer information based upon the land uses, building square footage and acreage for the Project as provided in the Crossroads Design Memorandum and Table 1 in Exhibit “E” to this Agreement. The Crossroads Design Memorandum (Table 2 to Exhibit “E”) also identifies the peak sewer generation flows for each Planning Area within the

Related to Project Demand

  • Project Delivery Contractor shall construct the Project in accordance with the Contract Documents, and Contractor shall deliver the Project completed in accordance with the Contract Documents, substantially free from defects, and within the Contract Time.

  • Project Deliverables The Contractor shall provide each of the following deliverables in writing to the City for review and approval to achieve the project objectives. C.1. <Title> Deliverable 1

  • Project Design Applicants must design a project that provides access to health services to enable eligible women and men experiencing health needs to secure and maintain safe and accessible quality screening and diagnostic services, comprehensive family planning, and/ or other women’s health services. A. Applicants are encouraged to emphasize the following components in the design of their projects. Projects must: 1. Use a collaborative approach to maximize existing community resources and avoid duplication of effort; 2. Enhance systems and local processes to make it easier for people to transition to, from, and between services; 3. Address barriers to ensure services are accessible to people regardless of setting or location; and 4. Promote improvement and positively impact health and well-being through coordinated service delivery. B. To be effective, services and activities provided or made available as part of the Proposed Project should have policies and procedures in place and include with the application as an attachment that: 1. Delineate the timely provision of services; 2. Deem Client eligibility and service provision as soon as possible and no later than 30 calendar days from initial request; 3. Require staff to assess and prioritize Client needs; 4. Implement with model fidelity to an evidence-based program or based upon best available research; 5. Plan in partnership with the person and are inclusive; 6. Provide in an environment that is most appropriate and based on a person’s preference including reasonable clinic/reception wait times that are not a barrier to care; 7. Provide referral sources for Clients that cannot be served or receive a specific service; 8. Are culturally and linguistically sensitive; 9. Tailor services to a person’s unique strengths and needs; 10. Manage funds to ensure established Clients continuity of care throughout budget year; 11. Continue to provide services to established Clients after allocated funds are expended; 12. Have processes to identify and eliminate possible barriers to care; 13. Do not deny services due to inability to pay; 14. Have appropriate key personnel and required staff to meet the medical and health needs of Clients; 15. Bill services appropriately and timely through TMHP; 16. Effectively communicate and document information related to health care needs with next steps available to Client; 17. Establish outreach and education plan for the community; and 18. Outline successful delivery of direct clinical services to Clients By submitting an Application under this RFA, the Applicant certifies that Applicant has or will have at time of grant award services, policies, or procedures that conform with the requirements in this section as applicable. HHSC, in its sole discretion, may request to review relevant documentation during the project period as necessary to ensure program fidelity.

  • Notice to Proceed Work shall not commence on this Project until the Director has issued a written Notice to Proceed to the Recipient. Such Notice will not be issued until the Director is assured that the Recipient has complied with the Recipient's responsibilities concerning OEPA plan approval, when applicable. A Notice to Proceed shall be required for all project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.