Common use of Project Description Clause in Contracts

Project Description. The Interconnection Customer has proposed to construct a 20MW solar powered electricity generation facility (the “Small Generating Facility”) located in the town of Machias in Cattaraugus County, New York. The Small Generating Facility will consist of a collector system comprised of: • photovoltaic arrays; • ten (10) SMA Sunny Central SC2500-EV 2.0532MW/2.5MVA solar inverters; and • ten (10) 2.5MVA 34.5kV/550V pad mount transformers with integral disconnect and fuses. The transformers will be loop fed on a single 34.5kV circuit back to a collector substation (“▇▇▇▇▇▇ Road Collector Substation”) using underground feeder lines. The Point of Interconnection (“POI”) for the Small Generating Facility is Connecting Transmission Owner’s existing 115kV Arcade - Five Mile Line 167 between structures 375 and 376, approximately 7.8 circuit miles from Connecting Transmission Owner’s Arcade Substation and 17.8 circuit miles from Connecting Transmission Owner’s Five Mile Road Substation. The Point of Change of Ownership (“PCO”) is at the line side connection of the Interconnection Customer’s disconnect switch located on the terminal structure inside the Interconnection Customer’s ▇▇▇▇▇▇ Road Collector Substation.

Appears in 7 contracts

Sources: Standard Small Generator Interconnection Agreement, Interconnection Agreement, Interconnection Agreement

Project Description. The Interconnection Customer has proposed to construct a 20MW solar powered electricity generation facility (the “Small Generating Facility”) located in the town of Machias Selkirk in Cattaraugus Albany County, New York. The Small Generating Facility will consist of a collector system comprised of: • eight (8) photovoltaic arrays; • ten eight (10) SMA Sunny Central SC25008) TMECI PVH-EV 2.0532MW/2.5MVA L2700GR 2.5MW/2.7MVA solar inverters; and • ten eight (10) 2.5MVA 34.5kV/550V 8) 2.7 MVA 34.5kV/600v delta - grounded wye pad mount transformers with integral disconnect and fuses. The transformers will be loop fed on a single 34.5kV circuit back to a collector substation (“▇▇▇▇▇▇ Road Albany 1 Collector Substation”) using a mix of overhead and underground feeder lineslines (“Collection Feeder Lines”). The Point of Interconnection (“POI”) for the Small Generating Facility is at the Connecting Transmission Owner’s existing 115kV Arcade Long Lane - Five Mile LaFarge Line 167 between structures 375 and 3766 in the vicinity of structure 62, approximately 7.8 circuit 1 mile from the LaFarge Substation and 6.69 miles from Connecting Transmission Owner’s Arcade Substation and 17.8 circuit miles from Connecting Transmission Owner’s Five Mile Road the Long Lane Substation. The Point of Change of Ownership (“PCO”) is at the line side connection of the Interconnection Customer’s disconnect switch located on the terminal structure inside the Interconnection Customer’s ▇▇▇▇▇▇ Road Collector Substation▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇.

Appears in 3 contracts

Sources: Service Agreement, Service Agreement, Service Agreement

Project Description. The Interconnection Customer has proposed to construct a 20MW solar powered electricity generation facility (the “Small Generating Facility”) located in the town of Machias in Cattaraugus County, New York. The Small Generating Facility will consist of a collector system comprised of: • photovoltaic arrays; • ten (10) SMA Sunny Central SC2500-EV 2.0532MW/2.5MVA solar inverters; and • ten (10) 2.5MVA 34.5kV/550V pad mount transformers with integral disconnect and fuses. The transformers will be loop fed on a single 34.5kV circuit back to a collector substation (“▇▇▇▇▇▇ Road Collector Substation”) using underground feeder lines. The Point of Interconnection (“POI”) for the Small Generating Facility is Connecting Transmission Owner’s existing 115kV Arcade - Five Mile Line 167 between structures 375 and 376, approximately 7.8 circuit miles from Connecting Transmission Owner’s Arcade Substation and 17.8 circuit miles from Connecting Transmission Owner’s Five Mile Road Substation. The Point of Change of Ownership (“PCO”) is at the line side connection of the Interconnection Customer’s disconnect switch located on the terminal structure inside the Interconnection Customer’s ▇▇▇▇▇▇ Road Collector Substation.

Appears in 3 contracts

Sources: Standard Small Generator Interconnection Agreement, Standard Small Generator Interconnection Agreement, Service Agreement

Project Description. The Interconnection Customer has proposed to construct a 20MW solar powered electricity generation facility (the “Small Generating Facility”) located in the town of Machias Selkirk in Cattaraugus Albany County, New York. The Small Generating Facility will consist of a collector system comprised of: • eight (8) photovoltaic arrays; • ten eight (10) SMA Sunny Central SC25008) TMECI PVH-EV 2.0532MW/2.5MVA L2700GR 2.5MW/2.7MVA solar inverters; and • ten eight (10) 2.5MVA 34.5kV/550V 8) 2.7MVA 34.5kV/600v delta - grounded wye pad mount transformers with integral disconnect and fuses. The transformers will be loop fed on a single 34.5kV circuit back to a collector substation (“▇▇▇▇▇▇ Road Albany 2 Collector Substation”) using a mix of overhead and underground feeder lineslines (“Collection Feeder Lines”). The Point of Interconnection (“POI”) for the Small Generating Facility is at the Connecting Transmission Owner’s existing 115kV Arcade Long Lane - Five Mile LaFarge Line 167 between structures 375 and 3766 in the vicinity of structure 60, approximately 7.8 circuit 1.25 miles from Connecting Transmission Owner’s Arcade the LaFarge Substation and 17.8 circuit 6.44 miles from Connecting Transmission Owner’s Five Mile Road the Long Lane Substation. The Point of Change of Ownership (“PCO”) is at the line side connection of the Interconnection Customer’s disconnect switch located on the terminal structure inside the Interconnection Customer’s ▇▇▇▇▇▇ Road Collector Substation▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇.

Appears in 2 contracts

Sources: Service Agreement, Service Agreement

Project Description. The Interconnection Customer has proposed to construct a 20MW solar powered electricity generation facility (the “Small Generating Facility”) located in the town of Machias Selkirk in Cattaraugus Albany County, New York. The Small Generating Facility will consist of a collector system comprised of: • eight (8) photovoltaic arrays; • ten eight (10) SMA Sunny Central SC25008) TMECI PVH-EV 2.0532MW/2.5MVA L2700GR 2.5MW/2.7MVA solar inverters; and • ten eight (10) 2.5MVA 34.5kV/550V 8) 2.7 MVA 34.5kV/600v delta - grounded wye pad mount transformers with integral disconnect and fuses. The transformers will be loop fed on a single 34.5kV circuit back to a collector substation (“▇▇▇▇▇▇ Road Albany 1 Collector Substation”) using a mix of overhead and underground feeder lineslines (“Collection Feeder Lines”). The Point of Interconnection (“POI”) for the Small Generating Facility is at the Connecting Transmission Owner’s existing 115kV Arcade Long Lane - Five Mile LaFarge Line 167 between structures 375 and 3766 in the vicinity of structure 62, approximately 7.8 circuit 1 mile from the LaFarge Substation and 6.69 miles from Connecting Transmission Owner’s Arcade Substation and 17.8 circuit miles from Connecting Transmission Owner’s Five Mile Road the Long Lane Substation. The Point of Change of Ownership (“PCO”) is at the line side connection of the Interconnection Customer’s disconnect switch located on the terminal structure inside the Interconnection Customer’s ▇▇▇▇▇▇ Road Albany 1 Collector Substation.

Appears in 1 contract

Sources: Interconnection Agreement

Project Description. The Interconnection Customer has proposed to construct a 20MW solar powered electricity generation facility (the “Small Generating Facility”) located in the town of Machias in Cattaraugus County, New York. The Small Generating Facility will consist of a collector system comprised of: • photovoltaic arrays; • ten (10) SMA Sunny Central SC2500-EV 2.0532MW/2.5MVA solar inverters; and • ten (10) 2.5MVA 34.5kV/550V pad mount transformers with integral disconnect and fuses. The transformers will be loop fed on a single 34.5kV circuit back to a collector substation (“▇▇▇▇▇▇ Road Collector Substation”) using underground feeder lines. The Point of Interconnection (“POI”) for the Small Generating Facility is Connecting Transmission Owner’s existing 115kV Arcade - Five Mile Line 167 between structures 375 and 376, approximately 7.8 circuit miles from Connecting Transmission Owner’s Arcade Substation and 17.8 circuit miles from Connecting Transmission Owner’s Five Mile Road Substation. The Point of Change of Ownership (“PCO”) is at the line side connection of the Interconnection Customer’s disconnect switch located on the terminal structure inside the Interconnection Customer’s ▇▇▇▇▇▇ Road Collector Substation.

Appears in 1 contract

Sources: Standard Small Generator Interconnection Agreement

Project Description. The Interconnection Customer has proposed to construct a 20MW solar powered electricity generation facility (the “Small Generating Facility”) located in the town of Machias Selkirk in Cattaraugus Albany County, New York. The Small Generating Facility will consist of a collector system comprised of: • eight (8) photovoltaic arrays; • ten eight (10) SMA Sunny Central SC25008) TMECI PVH-EV 2.0532MW/2.5MVA L2700GR 2.5MW/2.7MVA solar inverters; and • ten eight (10) 2.5MVA 34.5kV/550V 8) 2.7 MVA 34.5kV/600v delta – grounded wye pad mount transformers with integral disconnect and fuses. The transformers will be loop fed on a single 34.5kV circuit back to a collector substation (“▇▇▇▇▇▇ Road Albany 1 Collector Substation”) using a mix of overhead and underground feeder lineslines (“Collection Feeder Lines”). The Point of Interconnection (“POI”) for the Small Generating Facility is at the Connecting Transmission Owner’s existing 115kV Arcade - Five Mile Long Lane – LaFarge Line 167 between structures 375 and 3766 in the vicinity of structure 62, approximately 7.8 circuit 1 mile from the LaFarge Substation and 6.69 miles from Connecting Transmission Owner’s Arcade Substation and 17.8 circuit miles from Connecting Transmission Owner’s Five Mile Road the Long Lane Substation. The Point of Change of Ownership (“PCO”) is at the line side connection of the Interconnection Customer’s disconnect switch located on the terminal structure inside the Interconnection Customer’s ▇▇▇▇▇▇ Road Albany 1 Collector Substation.

Appears in 1 contract

Sources: Standard Small Generator Interconnection Agreement

Project Description. The Interconnection Customer has proposed to construct a 20MW solar powered electricity generation facility (the “Small Generating Facility”) located in the town of Machias Selkirk in Cattaraugus Albany County, New York. The Small Generating Facility will consist of a collector system comprised of: • eight (8) photovoltaic arrays; • ten eight (10) SMA Sunny Central SC25008) TMECI PVH-EV 2.0532MW/2.5MVA L2700GR 2.5MW/2.7MVA solar inverters; and • ten eight (10) 2.5MVA 34.5kV/550V 8) 2.7 MVA 34.5kV/600v delta - grounded wye pad mount transformers with integral disconnect and fuses. The transformers will be loop fed on a single 34.5kV circuit back to a collector substation (“▇▇▇▇▇▇ Road Albany 1 Collector Substation”) using a mix of overhead and underground feeder lineslines (“Collection Feeder Lines”). The Point of Interconnection (“POI”) for the Small Generating Facility is at the Connecting Transmission Owner’s existing 115kV Arcade ▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇ - Five Mile LaFarge Line 167 between structures 375 and 3766 in the vicinity of structure 62, approximately 7.8 circuit 1 mile from the LaFarge Substation and 6.69 miles from Connecting Transmission Owner’s Arcade Substation and 17.8 circuit miles from Connecting Transmission Owner’s Five Mile Road the Long Lane Substation. The Point of Change of Ownership (“PCO”) is at the line side connection of the Interconnection Customer’s disconnect switch located on the terminal structure inside the Interconnection Customer’s ▇▇▇▇▇▇ Road Albany 1 Collector Substation.

Appears in 1 contract

Sources: Standard Small Generator Interconnection Agreement

Project Description. The Interconnection Customer has proposed to construct a 20MW solar powered electricity generation facility (the “Small Generating Facility”) located in the town of Machias Selkirk in Cattaraugus Albany County, New York. The Small Generating Facility will consist of a collector system comprised of: • eight (8) photovoltaic arrays; • ten eight (10) SMA Sunny Central SC25008) TMECI PVH-EV 2.0532MW/2.5MVA L2700GR 2.5MW/2.7MVA solar inverters; and • ten eight (10) 2.5MVA 34.5kV/550V 8) 2.7MVA 34.5kV/600v delta – grounded wye pad mount transformers with integral disconnect and fuses. The transformers will be loop fed on a single 34.5kV circuit back to a collector substation (“▇▇▇▇▇▇ Road Albany 2 Collector Substation”) using a mix of overhead and underground feeder lineslines (“Collection Feeder Lines”). The Point of Interconnection (“POI”) for the Small Generating Facility is at the Connecting Transmission Owner’s existing 115kV Arcade - Five Mile Long Lane – LaFarge Line 167 between structures 375 and 3766 in the vicinity of structure 60, approximately 7.8 circuit 1.25 miles from Connecting Transmission Owner’s Arcade the LaFarge Substation and 17.8 circuit 6.44 miles from Connecting Transmission Owner’s Five Mile Road the Long Lane Substation. The Point of Change of Ownership (“PCO”) is at the line side connection of the Interconnection Customer’s disconnect switch located on the terminal structure inside the Interconnection Customer’s ▇▇▇▇▇▇ Road Albany 2 Collector Substation.

Appears in 1 contract

Sources: Standard Small Generator Interconnection Agreement