Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 Bidding Process 06/01/2012 07/01/2012 Construction 08/02/2012 11/30/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 2 contracts
Sources: Project Agreement, Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 06/01/2014 10/01/2014 Bidding Process 06/01/2012 07/01/2012 11/01/2014 11/20/2014 Construction 08/02/2012 11/30/2012 04/01/2015 08/30/2015 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 2 contracts
Sources: Project Grant/Loan Agreement, Project Grant/Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/01/2012 06/15/2012 Bidding Process 06/01/2012 07/01/2012 06/16/2012 07/15/2012 Construction 08/02/2012 11/30/2012 07/16/2012 10/31/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 2 contracts
Sources: Project Agreement, Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 03/01/2012 Bidding Process 06/01/2012 07/01/2012 03/01/2012 07/15/2012 Construction 08/02/2012 11/30/2012 07/15/2012 10/01/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 2 contracts
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 06/01/2012 10/01/2012 Bidding Process 06/01/2012 07/01/2012 11/01/2012 11/20/2012 Construction 08/02/2012 11/30/2012 04/01/2013 08/31/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 2 contracts
Sources: Project Agreement, Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 07/01/2015 12/31/2015 Bidding Process 06/01/2012 07/01/2012 01/01/2016 02/28/2016 Construction 08/02/2012 11/30/2012 03/31/2016 12/31/2016 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 2 contracts
Sources: Project Grant/Loan Agreement, Project Grant/Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/02/2011 07/20/2011 Bidding Process 06/01/2012 06/14/2012 Construction 07/01/2012 Construction 08/02/2012 11/30/2012 10/01/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 05/01/2012 07/01/2012 Bidding Process 06/01/2012 07/01/2012 08/01/2012 Construction 08/02/2012 11/30/2012 08/01/2012 10/01/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/01/2012 06/15/2012 Bidding Process 06/01/2012 07/01/2012 06/15/2012 07/15/2012 Construction 08/02/2012 11/30/2012 07/15/2012 10/31/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 09/29/2012 Bidding Process 06/01/2012 07/01/2012 09/29/2012 10/27/2012 Construction 08/02/2012 11/30/2012 11/16/2012 11/15/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 02/01/2012 05/01/2012 Bidding Process 06/01/2012 07/01/2012 07/15/2012 Construction 08/02/2012 11/30/2012 07/15/2012 11/15/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 06/01/2011 05/01/2012 Bidding Process 06/01/2012 07/01/2012 08/01/2012 09/01/2012 Construction 08/02/2012 11/30/2012 10/01/2012 07/01/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 08/10/2009 01/03/2011 Bidding Process 06/01/2012 07/01/2012 02/08/2011 06/13/2011 Construction 08/02/2012 11/30/2012 07/06/2011 02/09/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 06/01/2011 04/01/2012 Bidding Process 06/01/2012 07/01/2012 05/01/2012 08/01/2012 Construction 08/02/2012 11/30/2012 09/01/2012 09/01/2014 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 10/15/2012 02/15/2013 Bidding Process 06/01/2012 07/01/2012 04/15/2013 07/15/2013 Construction 08/02/2012 11/30/2012 07/30/2013 05/15/2014 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant/Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 07/01/2013 01/31/2014 Bidding Process 06/01/2012 07/01/2012 03/01/2014 07/07/2014 Construction 08/02/2012 11/30/2012 08/04/2014 11/28/2014 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 05/01/2012 05/31/2012 Bidding Process 06/01/2012 07/01/2012 06/15/2012 07/15/2012 Construction 08/02/2012 11/30/2012 07/15/2012 10/01/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/01/2012 10/01/2012 Bidding Process 06/01/2012 07/01/2012 01/15/2013 02/15/2013 Construction 08/02/2012 11/30/2012 04/15/2013 08/15/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/01/2014 04/01/2014 Bidding Process 06/01/2012 07/01/2012 07/01/2014 08/01/2014 Construction 08/02/2012 11/30/2012 09/01/2014 11/30/2014 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/01/2012 06/14/2012 Bidding Process 06/01/2012 07/01/2012 06/15/2012 07/29/2012 Construction 08/02/2012 11/30/2012 07/30/2012 09/30/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 02/01/2014 07/01/2014 Bidding Process 06/01/2012 07/01/2012 07/15/2014 08/15/2014 Construction 08/02/2012 11/30/2012 08/30/2014 05/31/2015 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/01/2010 12/31/2010 Bidding Process 06/01/2012 05/01/2012 06/30/2012 Construction 07/01/2012 Construction 08/02/2012 11/30/2012 08/31/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 11/01/2011 03/01/2012 Bidding Process 06/01/2012 07/01/2012 05/01/2012 07/15/2012 Construction 08/02/2012 11/30/2012 07/18/2012 10/01/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 07/01/2011 04/01/2012 Bidding Process 06/01/2012 07/01/2012 07/06/2012 08/01/2012 Construction 08/02/2012 11/30/2012 03/01/2013 08/30/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 11/01/2011 07/30/2012 Bidding Process 06/01/2012 07/01/2012 11/15/2012 12/15/2012 Construction 08/02/2012 11/30/2012 03/01/2013 12/31/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 08/01/2012 03/01/2013 Bidding Process 06/01/2012 07/01/2012 03/01/2013 07/15/2013 Construction 08/02/2012 11/30/2012 07/15/2013 10/01/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 10/01/2011 02/01/2012 Bidding Process 06/01/2012 07/01/2012 04/01/2012 08/01/2012 Construction 08/02/2012 11/30/2012 10/01/2012 10/01/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/01/2012 12/01/2012 Bidding Process 06/01/2012 07/01/2012 01/01/2013 03/01/2013 Construction 08/02/2012 11/30/2012 05/01/2013 01/01/2014 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 09/01/2011 10/01/2011 Bidding Process 06/01/2012 07/01/2012 07/15/2012 Construction 08/02/2012 11/30/2012 09/01/2012 10/01/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 09/01/2011 05/31/2012 Bidding Process 06/01/2012 07/01/2012 Construction 08/02/2012 11/30/2012 07/01/2012 06/30/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/03/2012 06/29/2012 Bidding Process 06/01/2012 07/01/2012 07/16/2012 08/09/2012 Construction 08/02/2012 11/30/2012 09/01/2012 05/31/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Loan Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 04/01/2011 04/01/2012 Bidding Process 06/01/2012 07/01/2012 05/30/2012 07/14/2012 Construction 08/02/2012 11/30/2012 08/01/2012 01/01/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 01/10/2011 05/30/2012 Bidding Process 06/01/2012 07/01/2012 07/29/2012 Construction 08/02/2012 11/30/2012 08/01/2012 05/30/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/02/2007 09/01/2009 Bidding Process 06/01/2012 07/01/2012 11/30/2012 12/31/2012 Construction 08/02/2012 11/30/2012 03/15/2013 12/31/2014 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 03/01/2012 06/01/2012 Bidding Process 06/01/2012 07/01/2012 Construction 08/02/2012 11/30/2012 08/01/2012 10/01/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 05/01/2012 06/30/2012 Bidding Process 06/01/2012 07/01/2012 07/30/2012 08/30/2012 Construction 08/02/2012 11/30/2012 09/15/2012 10/30/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 06/28/2007 05/25/2011 Bidding Process 06/01/2012 07/01/2012 06/13/2011 08/22/2011 Construction 08/02/2012 11/30/2012 10/17/2011 02/28/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 11/01/2011 03/01/2012 Bidding Process 06/01/2012 07/01/2012 03/15/2012 07/15/2012 Construction 08/02/2012 11/30/2012 08/01/2012 06/30/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 10/01/2012 06/01/2013 Bidding Process 06/01/2012 07/01/2012 06/16/2013 07/01/2013 Construction 08/02/2012 11/30/2012 08/01/2013 11/30/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 06/01/2009 10/01/2012 Bidding Process 06/01/2012 07/01/2012 11/05/2012 06/01/2013 Construction 08/02/2012 11/30/2012 07/01/2013 11/15/2014 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 11/01/2009 05/15/2011 Bidding Process 06/01/2012 07/01/2012 10/15/2012 11/30/2012 Construction 08/02/2012 11/30/2012 01/05/2013 10/30/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 02/01/2012 06/01/2012 Bidding Process 06/01/2012 07/01/2012 Construction 08/02/2012 11/30/2012 07/15/2012 03/15/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 08/01/2012 05/30/2014 Bidding Process 06/01/2012 07/01/2012 06/01/2014 07/01/2014 Construction 08/02/2012 11/30/2012 07/02/2014 11/30/2014 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant/Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 02/01/2012 03/30/2012 Bidding Process 06/01/2012 07/01/2012 06/05/2012 07/15/2012 Construction 08/02/2012 11/30/2012 07/30/2012 06/15/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 03/01/2012 06/30/2012 Bidding Process 06/01/2012 07/01/2012 08/01/2012 Construction 08/02/2012 08/15/2012 11/30/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 02/25/2013 04/26/2013 Bidding Process 06/01/2012 07/01/2012 07/01/2013 07/23/2013 Construction 08/02/2012 11/30/2012 08/26/2013 10/31/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant/Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 01/03/2011 05/30/2012 Bidding Process 06/01/2012 07/01/2012 07/06/2012 Construction 08/02/2012 07/07/2012 11/30/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 08/15/2011 11/01/2011 Bidding Process 06/01/2012 05/01/2012 07/01/2012 Construction 08/02/2012 11/30/2012 08/01/2012 10/01/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/01/2012 04/20/2012 Bidding Process 06/01/2012 07/01/2012 07/17/2012 Construction 08/02/2012 11/30/2012 07/20/2012 10/01/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 05/01/2014 06/01/2014 Bidding Process 06/01/2012 07/01/2012 07/01/2014 08/01/2014 Construction 08/02/2012 11/30/2012 09/01/2014 12/01/2014 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant/Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 03/01/2012 05/15/2012 Bidding Process 06/01/2012 07/01/2012 Construction 08/02/2012 11/30/2012 07/15/2012 10/31/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 05/01/2011 07/01/2012 Bidding Process 06/01/2012 07/01/2012 07/15/2012 08/15/2012 Construction 08/02/2012 11/30/2012 09/15/2012 11/15/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 04/01/2012 06/01/2012 Bidding Process 06/01/2012 07/01/2012 Construction 08/02/2012 11/30/2012 07/01/2012 12/31/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 02/01/2012 Bidding Process 03/01/2012 06/01/2012 07/01/2012 Construction 08/02/2012 11/30/2012 07/15/2012 03/30/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 10/15/2010 04/30/2012 Bidding Process 06/01/2012 07/01/2012 Construction 08/02/2012 11/30/2012 07/15/2012 12/15/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 10/01/2011 01/31/2012 Bidding Process 06/01/2012 07/01/2012 05/01/2012 07/15/2012 Construction 08/02/2012 11/30/2012 07/15/2012 11/30/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 03/01/2012 04/01/2012 Bidding Process 06/01/2012 07/01/2012 05/01/2012 07/15/2012 Construction 08/02/2012 11/30/2012 08/01/2012 06/30/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 11/01/2011 03/01/2012 Bidding Process 04/01/2012 06/01/2012 07/01/2012 Construction 08/02/2012 11/30/2012 07/15/2012 11/01/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 02/05/2012 05/25/2012 Bidding Process 06/01/2012 07/01/2012 07/12/2012 08/07/2012 Construction 08/02/2012 11/30/2012 09/04/2012 05/24/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 06/01/2011 06/25/2011 Bidding Process 06/01/2012 07/01/2012 03/15/2012 06/15/2012 Construction 08/02/2012 11/30/2012 07/08/2012 08/28/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 08/01/2010 05/30/2013 Bidding Process 06/01/2012 07/01/2012 06/01/2013 07/01/2013 Construction 08/02/2012 11/30/2012 07/02/2013 11/30/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 07/13/2011 08/04/2011 Bidding Process 06/01/2012 07/01/2012 07/31/2012 Construction 08/02/2012 11/30/2012 08/01/2012 10/31/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/01/2012 03/01/2012 Bidding Process 06/01/2012 07/01/2012 07/15/2012 Construction 08/02/2012 11/30/2012 08/01/2012 10/31/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/01/2012 01/31/2013 Bidding Process 06/01/2012 07/01/2012 02/01/2013 03/30/2013 Construction 08/02/2012 11/30/2012 03/31/2013 03/31/2014 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/01/2012 06/01/2012 Bidding Process 06/01/2012 07/01/2012 07/31/2012 Construction 08/02/2012 11/30/2012 08/01/2012 04/30/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/01/2012 01/01/2013 Bidding Process 06/01/2012 07/01/2012 01/08/2013 03/22/2013 Construction 08/02/2012 11/30/2012 04/01/2013 12/01/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 06/01/2011 08/09/2011 Bidding Process 06/01/2012 07/01/2012 07/15/2012 Construction 08/02/2012 11/30/2012 08/01/2012 12/31/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 07/22/2008 10/31/2012 Bidding Process 06/01/2012 07/01/2012 05/01/2013 07/15/2013 Construction 08/02/2012 11/30/2012 07/15/2013 05/30/2014 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant/Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 07/01/2012 10/01/2012 Bidding Process 06/01/2012 07/01/2012 11/01/2012 01/01/2013 Construction 08/02/2012 11/30/2012 02/01/2013 10/15/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 09/15/2011 12/15/2011 Bidding Process 06/01/2012 05/01/2012 07/01/2012 Construction 08/02/2012 11/30/2012 08/01/2012 06/01/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 11/01/2013 02/01/2014 Bidding Process 06/01/2012 07/01/2012 11/01/2014 12/30/2014 Construction 08/02/2012 11/30/2012 01/01/2015 08/01/2015 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/02/2007 11/08/2009 Bidding Process 06/01/2012 07/01/2012 04/27/2010 01/31/2010 Construction 08/02/2012 11/30/2012 06/21/2010 10/21/2011 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 08/01/2007 04/01/2008 Bidding Process 06/01/2012 07/01/2012 05/01/2008 07/01/2008 Construction 08/02/2012 11/30/2012 07/01/2008 01/01/2009 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant/Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 10/01/2011 03/30/2012 Bidding Process 06/01/2012 07/01/2012 07/15/2012 08/15/2012 Construction 08/02/2012 11/30/2012 09/15/2012 08/31/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 04/15/2012 10/10/2013 Bidding Process 06/01/2012 07/01/2012 08/01/2015 10/10/2015 Construction 08/02/2012 11/30/2012 11/01/2015 09/30/2017 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/02/2012 03/15/2013 Bidding Process 06/01/2012 07/01/2012 03/18/2013 05/18/2013 Construction 08/02/2012 11/30/2012 06/01/2013 12/01/2014 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 07/01/2012 07/01/2013 Bidding Process 06/01/2012 07/01/2012 09/01/2013 09/30/2013 Construction 08/02/2012 11/30/2012 03/01/2014 12/01/2014 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 07/01/2012 11/01/2012 Bidding Process 06/01/2012 07/01/2012 08/01/2012 09/01/2012 Construction 08/02/2012 11/30/2012 09/01/2012 11/01/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 09/01/2011 04/01/2012 Bidding Process 06/01/2012 07/01/2012 08/01/2012 10/01/2012 Construction 08/02/2012 11/30/2012 11/01/2012 10/30/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 11/01/2011 05/01/2012 Bidding Process 06/01/2012 07/01/2012 08/01/2012 Construction 08/02/2012 11/30/2012 09/01/2012 06/01/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 03/01/2010 06/28/2012 Bidding Process 06/01/2012 07/01/2012 08/09/2012 09/20/2012 Construction 08/02/2012 11/30/2012 09/21/2012 10/31/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 03/01/2015 06/01/2015 Bidding Process 06/01/2012 07/01/2012 06/01/2015 07/03/2015 Construction 08/02/2012 11/30/2012 08/01/2015 10/30/2015 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 12/01/2011 Bidding Process 06/01/2012 07/01/2012 08/01/2012 Construction 08/02/2012 11/30/2012 09/01/2012 11/01/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 11/01/2011 03/01/2012 Bidding Process 06/01/2012 07/01/2012 07/31/2012 Construction 08/02/2012 11/30/2012 08/01/2012 12/31/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 10/01/2011 06/01/2012 Bidding Process 06/01/2012 06/16/2012 07/01/2012 Construction 08/02/2012 11/30/2012 08/01/2012 12/30/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/01/2012 05/01/2012 Bidding Process 06/01/2012 07/01/2012 08/01/2012 Construction 08/02/2012 11/30/2012 09/01/2012 06/01/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 04/01/2012 08/01/2012 Bidding Process 06/01/2012 07/01/2012 08/01/2012 09/01/2012 Construction 08/02/2012 11/30/2012 10/01/2012 07/01/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 06/01/2014 08/01/2014 Bidding Process 06/01/2012 07/01/2012 08/02/2014 11/01/2014 Construction 08/02/2012 11/30/2012 11/01/2014 11/01/2015 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Loan Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/01/2012 05/01/2012 Bidding Process 06/01/2012 07/01/2012 08/15/2012 Construction 08/02/2012 09/01/2012 11/30/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 09/30/2012 Bidding Process 06/01/2012 07/01/2012 01/01/2013 03/01/2013 Construction 08/02/2012 11/30/2012 04/30/2013 11/08/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 12/01/2010 09/01/2012 Bidding Process 06/01/2012 07/01/2012 10/01/2012 12/01/2012 Construction 08/02/2012 11/30/2012 02/01/2013 02/01/2015 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 03/01/2012 06/01/2012 Bidding Process 06/01/2012 07/01/2012 07/15/2012 Construction 08/02/2012 11/30/2012 08/01/2012 10/31/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 06/01/2012 08/01/2012 Bidding Process 06/01/2012 07/01/2012 08/15/2012 10/02/2012 Construction 08/02/2012 11/30/2012 10/03/2012 03/13/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/15/2012 04/30/2012 Bidding Process 06/01/2012 05/01/2012 07/01/2012 Construction 08/02/2012 11/30/2012 07/01/2012 12/30/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 08/01/2010 05/30/2012 Bidding Process 06/01/2012 07/01/2012 Construction 08/02/2012 07/02/2012 11/30/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 09/01/2009 06/01/2011 Bidding Process 06/01/2012 05/01/2012 06/30/2012 Construction 07/01/2012 Construction 08/02/2012 11/30/2012 03/30/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 03/04/2011 04/01/2013 Bidding Process 06/01/2012 07/01/2012 04/01/2014 06/02/2014 Construction 08/02/2012 11/30/2012 06/03/2014 09/07/2015 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 03/16/2011 05/18/2012 Bidding Process 06/01/2012 07/01/2012 06/18/2012 07/20/2012 Construction 08/02/2012 11/30/2012 08/06/2012 11/16/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 10/01/2012 11/30/2012 Bidding Process 06/01/2012 07/01/2012 03/01/2013 03/15/2013 Construction 08/02/2012 11/30/2012 07/15/2013 10/16/2013 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Grant Agreement
Project Schedule. The Project, for which the provision of financial assistance is the subject of this Agreement, shall be pursued and completed in accordance with the following schedule: ACTIVITY START DATE COMPLETION DATE Final Design 08/01/2011 05/30/2012 01/01/2012 06/01/2012 Bidding Process 06/01/2012 07/01/2012 06/15/2012 07/15/2012 Construction 08/02/2012 11/30/2012 08/01/2012 12/01/2012 The information detailed in this Appendix A shall serve as the basis for Project monitoring purposes and for determining Project acceptance upon its completion. In the event that circumstances require a change in physical scope, such changes must be approved through the execution of a formal Amendment to this Project Agreement.
Appears in 1 contract
Sources: Project Agreement