Project Specific Assumptions. The estimated duration and associated fees presented in this SOW are based on the following assumptions. Should any element(s) of these be lacking during execution of the Services, additional time, associated fees, and expenses may be required. 1. This Statement of Work constrains activities to an approximate 10-week duration. 2. Azure scaffolding and governance is sufficiently mature to support the objectives and design approach as enumerated herein. 3. This engagement does not include development tool licenses (i.e., Visual Studio), database, third-party product and application server licenses. 4. If applicable, any onsite skills transfer that takes place during this project will not replace the manufacturer’s formal system implementation and administration classes. 5. Insight has no obligation to mount, affix, or otherwise fasten any cable, hardware, or other product to any building or structure (inside or outside), and Insight has no obligation to run cable above, under, behind, or through any ceiling, floor, or wall of any building or structure. If such services are requested by Client, such services may be performed by Insight only to the extent permitted by applicable law and will be subject to a Change Request for additional services. 6. Each party agrees that personnel will not be asked to perform, nor volunteer to perform, engineering and/or consulting tasks that lie outside the skill sets and experience of personnel. Personnel have the right to decline a service request if the request falls outside their scope of experience and expertise. a. Electrical or cabling services b. Formal user training
Appears in 1 contract
Sources: Professional Services
Project Specific Assumptions. The estimated duration and associated fees presented in this SOW are based on the following assumptions. Should any element(s) of these be lacking during execution of the Services, additional time, associated fees, and expenses may be required.
1. This Time-Box Approach; this Statement of Work constrains the Phase 2 through Phase 5 activities to an approximate 10a 5-week durationduration and to the duration of efforts specified in this SOW.
2. Azure scaffolding and governance is sufficiently mature to support the objectives and design approach as enumerated herein.
3. This engagement does not include development tool licenses (i.e., Visual Studio), database, third-third party product and application server licenses.
43. If applicable, any onsite skills transfer that takes place during this project will not replace the manufacturer’s formal system implementation and administration classes.
54. Insight has no obligation to mount, affix, or otherwise fasten any cable, hardware, or other product to any building or structure (inside or outside), and Insight has no obligation to run cable above, under, behind, or through any ceiling, floor, or wall of any building or structure. If such services are requested by Client, such services may be performed by Insight only to the extent permitted by applicable law and will be subject to a Change Request for additional services.
65. Each party agrees that personnel will not be asked to perform, nor volunteer to perform, engineering and/or consulting tasks that lie outside the skill sets and experience of personnel. Personnel have the right to decline a service request if the request falls outside their scope of experience and expertise.
6. The following are considered out-of-scope and are not part of the Services:
a. Electrical or cabling services
b. Formal user training