Provisional Integration Scope Sample Clauses

Provisional Integration Scope. In order to enable Licensee to get access to the SDK quicker, we may make available the SDK to Licensee based on the Provisional Integration Scope only. Unless Genetec expressly confirms to Licensee in writing that the scope of the project defined by Licensee in the Application Form is accepted by Genetec as being the Definitive Integration Scope, such description of the scope of the project defined by Licensee in the Application Form will remain as Provisional Integration Scope. Licensee’s privileges with respect to the SDK under the Provisional Integration Scope are limited to the evaluation of the SDK and its content, and to commencing the integration development and testing work only. Licensee acknowledges and understands that Genetec will not be bound by and has no obligation whatsoever to approve the Provisional Integration Scope as the Definitive Integration Scope, and Genetec may, at its absolute discretion and without justification, decline Licensee’s request for integration of the Base Licensee Product with a Genetec Product. As such, if Licensee chooses to commence any evaluation, development or testing work based on the Provisional Integration Scope, Genetec will not be liable to Licensee for any costs or other liabilities incurred by Licensee.

Related to Provisional Integration Scope

  • Provisional Interconnection Service Prior to the completion of the Large Facility Interconnection Procedures and prior to completion of requisite Attachment Facilities, Distribution Upgrades, System Upgrade Facilities, System Distribution Upgrades, or System Protection Facilities, the Developer may request an evaluation for Provisional Interconnection Service. NYISO, in conjunction with the Connecting Transmission Owner, shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if the Developer interconnects without modifications to the Large Generating Facility or the New York State Transmission System (or Distribution System as applicable). NYISO, in conjunction with the Connecting Transmission Owner, shall determine whether any Attachment Facilities, Distribution Upgrades, System Upgrade Facilities, System Deliverability Upgrades, or System Protection Facilities, which are necessary to meet Applicable Laws and Regulations, Applicable Reliability Standards, and Good Utility Practice, are in place prior to the commencement of interconnection service from the Large Facility. Where available studies indicate that the Attachment Facilities, Distribution Upgrades, System Upgrade Facilities, System Deliverability Upgrades, or System Protection Facilities are required for the interconnection of a new, modified and/or expanded Large Facility but such facilities are not currently in place, NYISO, in conjunction with the Connecting Transmission Owner, will perform a study, at the Developer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Large Facility in the Provisional Large Facility Interconnection Agreement shall be studied, at the Developer’s expense, and updated annually. The NYISO shall issue the study’s findings in writing to the Developer and Connecting Transmission Owner(s). Following a determination by NYISO, in conjunction with the Connecting Transmission Owner, that the Developer may reliably provide Provisional Interconnection Service, NYISO shall tender to the Developer and Connecting Transmission Owner, a Provisional Large Facility Interconnection Agreement. NYISO, Developer, and Connecting Transmission Owner may execute the Provisional Large Facility Interconnection Agreement, or the Developer may request the filing of an unexecuted Provisional Large Facility Interconnection Agreement with the Commission. The Developer shall assume all risk and liabilities with respect to changes between the Provisional Large Facility Interconnection Agreement and the Large Generator Interconnection Agreement, including changes in output limits and the cost responsibilities for the Attachment Facilities, System Upgrade Facilities, System Deliverability Upgrades, and/or System Protection Facilities.

  • Interface A defined set of transmission facilities that separate Load Zones and that separate the NYCA from adjacent Control Areas. Investor-Owned Transmission Owners. A Transmission Owner that is owned by private investors. At the present time these include: Central ▇▇▇▇▇▇ Gas & Electric Corporation, Consolidated Edison Company of New York, Inc., New York State Electric & Gas Corporation, Niagara Mohawk Power Corporation, Orange and Rockland Utilities, Inc., and Rochester Gas and Electric Corporation.

  • Technical Interfaces 3.2.6.1 The Interconnection facilities provided by each Party shall be formatted using either Alternate Mark Inversion (AMI) line code with Superframe format framing or Bipolar 8-Zero Substitution with Extended Superframe (B8ZS ESF) format framing or any mutually agreeable line coding and framing.

  • Interfaces GTE provides the CLECs with choices for access to OSS pre-ordering, ordering, maintenance and repair systems. Availability of the interfaces is fundamental to the CLEC being able to effectively do business with GTE. Additionally, in many instances, CLEC personnel must work with the service personnel of GTE. Measurements in this category assess the availability to the CLECs of systems and personnel at GTE work centers.