Common use of Reactive Supply and Voltage Control from Generation Sources Service Clause in Contracts

Reactive Supply and Voltage Control from Generation Sources Service. The charge shall be the product of the currently effective Reactive Supply and Voltage Control from Generation sources Service Charge as provided for in Schedule 2 of PacifiCorp’s OATT and the amount calculated as the sum of the APD and Deseret Area Load. Deseret shall supply reactive energy as required for the Deseret Transmission System and agrees to operate the Bonanza generation facility as directed by PacifiCorp, acting as the Transmission Operator and Balancing Authority for the Deseret Transmission System, consistent with WECC and NERC standards for reactive supply and voltage control. Credits to offset in part or in total charges under Schedule 2 shall be applied for the Hunter II Resource, the Bonanza Resource, and any other generation of Deseret connected to PacifiCorp or the Deseret Transmission System pursuant to the terms of this Agreement and otherwise qualified to receive credit for reactive supply and voltage control pursuant to the criteria 1-3 and treatment of jointly-owned units as set forth below. Supply from the Hunter II Resource will be measured based on scheduled generation, and all other generator output will be measured based on actual generation. 1) The generator has an exciter. 2) The generator is capable of responding automatically to voltage and/or reactive control settings and to manual directives from a PacifiCorp Control Area operator, as described in the Tariff, when called upon to supply reactive support (generate and absorb reactive energy) to PacifiCorp’s Transmission System. Automatic response must be immediate and manual response must occur within 5 minutes of notice. Generators which fail to respond as directed will be disqualified until such time as the Control Area operator can be assured the unit can be relied upon. 3) The generator is interconnected to PacifiCorp’s Transmission System or connected to a PacifiCorp transmission customer-owned transmission system within PacifiCorp’s Balancing Authority Area. Any generators jointly owned by PacifiCorp and Deseret that are subject to Schedule 2 charges and for which PacifiCorp’s costs are included in the calculation of Reactive Service rates, shall be deemed qualified. The total Reactive Supply and Voltage Control from Generation or Other Sources Service obligation for Deseret with its eligible generation that supplies such service for its transactions shall be equal to the total amount of load served within the Balancing Authority Area and/or generation exported from the Balancing Authority Area under this Agreement. The billing determinants for Reactive Supply and Voltage Control Service from Generation or Other Sources Service shall be determined by: (1) For the hour of the transmission system peak each month, subtracting from Deseret’s full requirement (APD plus Deseret Area Load) the total amount supplied by qualifying generator(s) during that hour; (2) charging Deseret the Schedule 2 rate multiplied by the difference, in MWs, calculated in item (1) to the extent Deseret supplied less than its full requirement during the coincident peak hour.

Appears in 2 contracts

Sources: Transmission Service and Operating Agreement, Transmission Service and Operating Agreement

Reactive Supply and Voltage Control from Generation Sources Service. The charge shall be Only to the product of the currently effective Reactive Supply and Voltage Control from Generation sources Service Charge as provided for in extent required pursuant to Schedule 2 of PacifiCorp’s OATT and the amount calculated as the sum of the APD and Deseret Area Load. Deseret shall supply reactive energy as required for the Deseret Transmission System and agrees to operate the Bonanza generation facility as directed by PacifiCorp, acting as the Transmission Operator and Balancing Authority for the Deseret Transmission System, consistent with WECC and NERC standards for reactive supply and voltage controlTariff. Credits to offset in part or in total charges under for Schedule 2 shall be applied applicable for the Hunter II Resource, the Bonanza Resource, and any other generation of Deseret connected Palisades Resource to PacifiCorp or the Deseret Transmission System pursuant to the terms of load served under this Agreement and otherwise qualified to receive credit for reactive supply and voltage control pursuant to the criteria 1-3 and treatment of jointly-owned units as set forth belowAgreement. Supply from the Hunter II Resource will be measured based on scheduled generation, and all other generator Generator output will be measured based on actual generation.. Additional generators may be eligible for Schedule 2 credits to the extent each such generator meets the following eligibility criteria in the Transmission Provider’s Business Practice #63 - Transmission Customer Provision of Reactive Supply and Voltage Control from Generation or Other Sources Service, once effective: 1) The generator has an exciter. 2) The generator is capable of responding automatically to voltage and/or reactive control settings and to manual directives from a PacifiCorp the Transmission Provider’s Control Area operator, as described in the Tariff, when called upon to supply reactive support (generate and absorb reactive energy) to PacifiCorpthe 3) Transmission Provider’s Transmission System. Automatic response must be immediate and manual response must occur within 5 minutes of notice. Generators which fail to respond as directed will be disqualified until such time as the Control Area operator can be assured the unit can be relied upon. 34) The generator is interconnected to PacifiCorpthe Transmission Provider’s Transmission System or connected to a PacifiCorp transmission the Transmission Provider’s customer-owned transmission system within PacifiCorp’s Balancing Authority Area. Any generators jointly owned by PacifiCorp the Transmission Provider and Deseret the Transmission Customer that are subject to Schedule 2 charges and for which PacifiCorpthe Transmission Provider’s costs are included in the calculation of Reactive Service rates, shall be deemed qualified. The total Reactive Supply and Voltage Control from Generation or Other Sources Service obligation for Deseret the Transmission Customer with its eligible generation that supplies such service for its transactions shall be equal to the total amount of load served within the Balancing Authority Area and/or generation exported from the Balancing Authority Area under this Service Agreement. The billing determinants for Reactive Supply and Voltage Control Service from Generation or Other Sources Service shall be determined by: (1) For the hour of the transmission system peak each month, subtracting from Deseretthe Transmission Customer’s full requirement (APD plus Deseret Area Load) the total amount supplied by qualifying generator(s) during that hour;hour each month; and (2) charging Deseret Charging the Transmission Customer the Schedule 2 rate multiplied by the difference, in MWs, calculated in item (1) to the extent Deseret the Transmission Customer supplied less than its full requirement during the coincident peak hour.

Appears in 1 contract

Sources: Service Agreement for Network Integration Transmission Service

Reactive Supply and Voltage Control from Generation Sources Service. The charge shall be the product of the currently effective Reactive Supply and Voltage Control from Generation sources Service Charge as provided for in Schedule 2 of PacifiCorp’s OATT and the amount calculated as the sum of the APD and Deseret Area Load. .. Deseret shall supply reactive energy as required for the Deseret Transmission System and agrees to operate the Bonanza generation facility as directed by PacifiCorp, acting as the Transmission Operator and Balancing Authority for the Deseret Transmission System, consistent with WECC and NERC standards for reactive supply and voltage control. Credits to offset in part or in total charges under Schedule 2 shall be applied for the Hunter II Resource, the Bonanza Resource, and any other generation of Deseret connected to PacifiCorp or the Deseret Transmission System pursuant to the terms of this Agreement and otherwise qualified to receive credit for reactive supply and voltage control pursuant to the criteria 1-3 and treatment of jointly-owned units as set forth below. Supply from the Hunter II Resource will be measured based on scheduled generation, and all other generator output will be measured based on actual generation. 1) The generator has an exciter. 2) The generator is capable of responding automatically to voltage and/or reactive control settings and to manual directives from a PacifiCorp Control Area operator, as described in the Tariff, when called upon to supply reactive support (generate and absorb reactive energy) to PacifiCorp’s Transmission System. Automatic response must be immediate and manual response must occur within 5 minutes of notice. Generators which fail to respond as directed will be disqualified until such time as the Control Area operator can be assured the unit can be relied upon. 3) The generator is interconnected to PacifiCorp’s Transmission System or connected to a PacifiCorp transmission customer-owned transmission system within PacifiCorp’s Balancing Authority Area. Any generators jointly owned by PacifiCorp and Deseret that are subject to Schedule 2 charges and for which PacifiCorp’s costs are included in the calculation of Reactive Service rates, shall be deemed qualified. The total Reactive Supply and Voltage Control from Generation or Other Sources Service obligation for Deseret with its eligible generation that supplies such service for its transactions shall be equal to the total amount of load served within the Balancing Authority Area and/or generation exported from the Balancing Authority Area under this Agreement. The billing determinants for Reactive Supply and Voltage Control Service from Generation or Other Sources Service shall be determined by: (1) For the hour of the transmission system peak each month, subtracting from Deseret’s full requirement (APD plus Deseret Area Load) the total amount supplied by qualifying generator(s) during that hour; (2) charging Deseret the Schedule 2 rate multiplied by the difference, in MWs, calculated in item (1) to the extent Deseret supplied less than its full requirement during the coincident peak hour.

Appears in 1 contract

Sources: Transmission Service and Operating Agreement