Common use of Reimbursement Procedure Clause in Contracts

Reimbursement Procedure. Except as may be otherwise provided in this Agreement, reimbursements will be made as follows: 1. Upon execution and delivery of this Agreement by both parties, the Recipient may request immediate reimbursement of any eligible incurred planning and design allowance costs through submission to the State Water Board of the Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed. 2. The Recipient must submit a Reimbursement Request for costs incurred prior to the date this Agreement is executed by the State Water Board no later than ninety (90) days after this Agreement is executed by the State Water Board. Late Reimbursement Requests may not be honored. 3. Additional Project Funds will be promptly disbursed to the Recipient upon receipt of Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed by the Recipient for incurred costs consistent with this Agreement, along with receipt of progress reports due under this Agreement. 4. The Recipient must not request reimbursement for any Project Cost until such cost has been incurred and is currently due and payable by the Recipient, although the actual payment of such cost by the Recipient is not required as a condition of Reimbursement Request. Supporting documentation (e.g., receipts) must be submitted with each Reimbursement Request. The amount requested for Recipient’s administration costs must include a calculation formula (i.e., hours or days worked times the hourly or daily rate = total amount claimed). Reimbursement of Project Funds will be made only after receipt of a complete, adequately supported, properly documented, and accurately addressed Reimbursement Request. Upon request by the Division, supporting documents for professional and administrative services must include the employees’ names, classifications, labor rates, hours worked, and descriptions of the tasks performed. Reimbursement Requests submitted without supporting documents may be wholly or partially withheld at the discretion of the Division. 5. The Recipient must spend Project Funds within 30 days of receipt. If the Recipient earns interest earned on Project Funds, it must report that interest immediately to the State Water Board. The State Water Board may deduct earned interest from future reimbursements. 6. The Recipient must not request a reimbursement unless that Project Cost is allowable, reasonable, and allocable. 7. Notwithstanding any other provision of this Agreement, no reimbursement shall be required at any time or in any manner which is in violation of or in conflict with federal or state laws, policies, or regulations. Notwithstanding any other provision of this Agreement, the Recipient agrees that the State Water Board may retain an amount equal to ten percent (10%) of the Project Funding Amount until Project Completion. Any retained amounts due to the Recipient will be promptly disbursed to the Recipient, without interest, upon Project Completion. Except as follows, construction costs and disbursements are not available until after the Division has approved the final budget form submitted by the Recipient. The Deputy Director of the Division may authorize the disbursement of up to ten percent (10%) of Project Funds for the reimbursement of eligible construction costs and pre-purchased materials prior to Division approval of the final budget form submitted by the Recipient. All other construction costs are not eligible for reimbursement until after the Division has approved the final budget form submitted by the Recipient. Construction costs incurred prior to the Eligible Construction Start Date are not eligible for reimbursement.

Appears in 2 contracts

Sources: Drinking Water Construction Grant Agreement, Agreement

Reimbursement Procedure. Except [Confirm with DFA]Except as may be otherwise provided in this Agreement, reimbursements will be made as follows: 1. Upon execution and delivery of this Agreement by both parties, the Recipient may request immediate reimbursement of any eligible incurred planning and design allowance costs through submission to the State Water Board of the Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed. 2. The Recipient must submit a Reimbursement Request for costs incurred prior to the date this Agreement is executed by the State Water Board no later than ninety (90) days after this Agreement is executed by the State Water Board. Late Reimbursement Requests may not be honored. 3. Additional Project Funds will be promptly disbursed to the Recipient upon receipt of Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed by the Recipient for incurred costs consistent with this Agreement, along with receipt of progress reports due under this Agreement. 4. The Recipient must not request reimbursement for any Project Cost until such cost has been incurred and is currently due and payable by the Recipient, although the actual payment of such cost by the Recipient is not required as a condition of Reimbursement Request. Supporting documentation (e.g., receipts) must be submitted with each Reimbursement Request. The amount requested for Recipient’s administration costs must include a calculation formula (i.e., hours or days worked times the hourly or daily rate = total amount claimed). Reimbursement of Project Funds will be made only after receipt of a complete, adequately supported, properly documented, and accurately addressed Reimbursement Request. Upon request by the Division, supporting documents for professional and administrative services must include the employees’ names, classifications, labor rates, hours worked, and descriptions of the tasks performed. Reimbursement Requests submitted without supporting documents may be wholly or partially withheld at the discretion of the Division. 5. The Recipient must spend Project Funds within 30 days of receipt. If the Recipient earns interest earned on Project Funds, it must report that interest immediately to the State Water Board. The State Water Board may deduct earned interest from future reimbursements. 6. The Recipient must not request a reimbursement unless that Project Cost is allowable, reasonable, and allocable. 7. Notwithstanding any other provision of this Agreement, no reimbursement shall be required at any time or in any manner which is in violation of or in conflict with federal or state laws, policies, or regulations. Notwithstanding any other provision of this Agreement, the Recipient agrees that the State Water Board may retain an amount equal to ten percent (10%) of the Project Funding Amount until Project Completion. Any retained amounts due to the Recipient will be promptly disbursed to the Recipient, without interest, upon Project Completion. Except [for non-DACs/SDACs]Construction costs and disbursements are not available until after the Division has approved the final budget form submitted by the Recipient. Construction costs incurred prior to the Eligible Construction Start Date are not eligible for reimbursement. [for DACs/SDACs]Except as follows, construction costs and disbursements are not available until after the Division has approved the final budget form submitted by the Recipient. The Deputy Director of the Division may authorize the disbursement of up to ten percent (10%) of Project Funds for the reimbursement of eligible construction costs and pre-purchased materials prior to Division approval of the final budget form submitted by the Recipient. All other construction costs are not eligible for reimbursement until after this the Division has approved the final budget form submitted by the Recipient. Construction costs incurred prior to the Eligible Construction Start Date are not eligible for reimbursement.

Appears in 1 contract

Sources: Water Recycling Funding Program Construction Grant and Loan Agreement

Reimbursement Procedure. Except as may a. Project Funds will be otherwise provided in this Agreement, reimbursements will be made as followstwo reimbursements: 1. Upon execution and delivery Reimbursement of this Agreement by both parties, the Recipient may request immediate reimbursement approved costs of any eligible incurred planning and design allowance costs through submission up to the State Water Board 50 percent of the Reimbursement Request Form 260 and Form 261total Project Funding Amount will occur after Division staff have approved the draft Project Report. Approval of the draft report will not occur until after the Mid-Course meeting, or any amendment thereto, duly completed and executedat the earliest. 2. The Recipient must submit a Reimbursement Request for costs incurred prior to of the date remaining approved Project Costs will occur after Division staff have approved the final Project Report or have authorized suspension of work under this Agreement is executed by the State Water Board no later than ninety (90) days after this Agreement is executed by the State Water Board. Late Reimbursement Requests may not be honoreddue to a determination of lack of feasibility. 3. Additional Project Funds will be promptly disbursed to the Recipient upon receipt of Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed by the Recipient for incurred costs consistent with this Agreement, along with receipt of progress reports due under this Agreement. 4. b. The Recipient must not request reimbursement for any Project Cost until such cost has been incurred and is currently due and payable by the Recipient, although the actual payment of such cost by the Recipient is not required as a condition of Reimbursement Requestreimbursement. Supporting documentation (e.g., receipts) must be submitted with each Reimbursement Request. The amount requested for Recipient’s administration costs must include a calculation formula (i.e., hours or days worked times the hourly or daily rate = total amount claimed). Reimbursement of Project Funds will be made only after receipt of a complete, adequately supported, properly documented, and accurately addressed Reimbursement Request. Upon request by the Division, supporting documents for professional and administrative services must include the employees’ names, classifications, labor rates, hours worked, and descriptions of the tasks performed. Reimbursement Requests submitted without supporting documents may be wholly or partially withheld at the discretion of the Division. 5. c. The Recipient must spend Project Funds within 30 days of receipt. If the Recipient earns interest earned on Project Funds, it must report that interest immediately to the State Water Board. The State Water Board may deduct earned interest from future reimbursements. 6. d. The Recipient must not request a reimbursement unless that Project Cost is allowable, reasonable, and allocable. 7. e. Notwithstanding any other provision of this Agreement, no reimbursement shall be required at any time or in any manner which is in violation of or in conflict with federal or state laws, policies, or regulations. Notwithstanding any other provision of this Agreement, the Recipient agrees that the State Water Board may retain an amount equal to ten percent (10%) of the Project Funding Amount until Project Completion. Any retained amounts due to the Recipient will be promptly disbursed to the Recipient, without interest, upon Project Completion. Except as follows, construction costs and disbursements are not available until after the Division has approved the final budget form submitted by the Recipient. The Deputy Director of the Division may authorize the disbursement of up to ten percent (10%) of Project Funds for the reimbursement of eligible construction costs and pre-purchased materials prior to Division approval of the final budget form submitted by the Recipient. All other construction costs are not eligible for reimbursement until after the Division has approved the final budget form submitted by the Recipient. Construction costs incurred prior to the Eligible Construction Start Date are not eligible for reimbursement.

Appears in 1 contract

Sources: Water Recycling Funding Program Planning Grant Agreement

Reimbursement Procedure. (a) Except as may be otherwise provided in this Agreement, reimbursements will be made as follows: 1. Upon execution and delivery of this Agreement by both parties, the Recipient may request immediate reimbursement of any eligible incurred planning and design allowance costs as specified below through submission to the State Water Board of the Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed. 2. The Recipient must submit a Reimbursement Request for costs incurred prior to the date this Agreement is executed by the State Water Board no later than ninety (90) days after this Agreement is executed by the State Water Board. Late Reimbursement Requests may not be honored. 3. Additional Project Funds will be promptly disbursed to the Recipient upon receipt of Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed by the Recipient for incurred costs consistent with this Agreement, along with receipt of progress reports due under this Agreement.Exhibit A. 4. The Recipient must not request reimbursement for any Project Cost until such cost has been incurred and is currently due and payable by the Recipient, although the actual payment of such cost by the Recipient is not required as a condition of Reimbursement Requestreimbursement. Supporting documentation (e.g., receipts) must be submitted with each Reimbursement Request. The amount requested for Recipient’s administration costs must include a calculation formula (i.e., hours or days worked times the hourly or daily rate = total amount claimed). Reimbursement of Project Funds will be made only after receipt of a complete, adequately supported, properly documented, and accurately addressed Reimbursement Request. Upon request by the Division, supporting documents for professional and administrative services must include the employees’ names, classifications, labor rates, hours worked, and descriptions of the tasks performed. Reimbursement Requests submitted without supporting documents may be wholly or partially withheld at the discretion of the Division. 5. The Recipient must spend Project Funds within 30 days of receipt. If the Recipient earns interest earned on Project Funds, it must report that interest immediately to the State Water Board. The State Water Board may deduct earned interest from future reimbursements. 6. The Recipient must shall not request a reimbursement unless that Project Cost is allowable, reasonable, and allocable. 7. Notwithstanding any other provision of this Agreement, no reimbursement shall be required at any time or in any manner which is in violation of or in conflict with federal or state laws, policies, or regulations. . (b) Notwithstanding any other provision of this Agreement, the Recipient agrees that the State Water Board may retain an amount equal to ten percent (10%) of the Project Funding Amount until Project Completion. Any retained amounts due to the Recipient will be promptly disbursed to the Recipient, without interest, upon Project Completion. . (c) Except as follows, construction costs and disbursements are not available until after the Division has approved the final budget form submitted by the Recipient. The Deputy Director of the Division may authorize the disbursement of up to ten percent (10%) of Project Funds for the reimbursement of eligible construction costs and pre-purchased materials prior to Division approval of the final budget form submitted by the Recipient. All other construction costs are not eligible for reimbursement until after the Division has approved the final budget form submitted by the Recipient. Construction costs incurred prior to the Eligible Construction Start Date are not eligible for reimbursement.

Appears in 1 contract

Sources: Grant and Loan Agreement

Reimbursement Procedure. Except as may be otherwise provided in this Agreement, reimbursements disbursement of Project Funds will be made as follows: 1. (a) Upon execution and delivery of this Agreement by both parties, the Recipient may request immediate reimbursement of any eligible incurred planning and design allowance costs through submission to the State Water Board of the Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed.. To be eligible for reimbursement, Project Costs, including any planning and design allowance costs, must have been incurred in compliance with all applicable requirements, including the state and federal cross-cutting requirements listed in Exhibit C. 2. (b) The Recipient must submit a Reimbursement Request reimbursement request for costs incurred prior to the date this Agreement is executed by the State Water Board no later than ninety (90) days after this Agreement is executed by the State Water Board. Late Reimbursement Requests reimbursement requests may not be honored. 3. (c) The Recipient may request reimbursement of eligible construction and equipment costs consistent with budget amounts approved by the Division in the Final Budget Approval. (d) Additional Project Funds will be promptly disbursed to the Recipient upon receipt of Reimbursement Request reimbursement request Form 260 and Form 261, or any amendment thereto, duly completed and executed by the Recipient for incurred costs consistent with this Agreement, along with receipt of progress reports due under this Agreement.Exhibit A. 4. (e) The Recipient must not request reimbursement for any Project Cost until such cost has been incurred and is currently due and payable by the Recipient, although the actual payment of such cost by the Recipient is not required as a condition of Reimbursement Requestreimbursement request. Supporting documentation (e.g., receipts) must be submitted with each Reimbursement Requestreimbursement request. The amount requested for Recipient’s administration costs must include a calculation formula (i.e., hours or days worked times the hourly or daily rate = total amount claimed). Reimbursement Disbursement of Project Funds will be made only after receipt of a complete, adequately supported, properly documented, and accurately addressed Reimbursement Request. Upon request by the Division, supporting documents for professional and administrative services must include the employees’ names, classifications, labor rates, hours worked, and descriptions of the tasks performedreimbursement request. Reimbursement Requests requests submitted without supporting documents may be wholly or partially withheld at the discretion of the Division. 5. (f) The Recipient must spend Project Funds within 30 days of receipt. If the Recipient earns interest earned on Project Funds, it must report that interest immediately to the State Water Board. The State Water Board may deduct earned interest from future reimbursementsdisbursements. 6. (g) The Recipient must shall not request a reimbursement unless that Project Cost is allowable, reasonable, and allocable. 7. (h) Notwithstanding any other provision of this Agreement, no reimbursement disbursement shall be required at any time or in any manner which is in violation of or in conflict with federal or state laws, policies, or regulations. (i) No work or travel outside the State of California is permitted under this Agreement unless the Division provides prior written authorization. Notwithstanding any other provision of Failure to comply with this restriction may result in termination this Agreement, pursuant to Exhibit C. Any reimbursement for necessary travel and per diem shall be at rates not to exceed those set by the Recipient agrees that the State Water Board may retain an amount equal to ten percent (10%) California Department of Human Resources at ▇▇▇▇://▇▇▇.▇▇▇▇▇.▇▇.▇▇▇/employees/Pages/travel-reimbursements.aspx. as of the Project Funding Amount until Project Completion. Any retained amounts due to the Recipient will be promptly disbursed to the Recipient, without interest, upon Project Completion. Except as follows, construction date costs and disbursements are not available until after the Division has approved the final budget form submitted incurred by the Recipient. The Deputy Director of the Division may authorize the disbursement of up to ten percent (10%) of Project Funds for the reimbursement of eligible construction costs and pre-purchased materials prior to Division approval of the final budget form submitted by the Recipient. All other construction costs are not eligible for reimbursement until after the Division has approved the final budget form submitted by the Recipient. Construction costs incurred prior to the Eligible Construction Start Date are not eligible for reimbursement.

Appears in 1 contract

Sources: Construction Installment Sale Agreement

Reimbursement Procedure. Except as may be otherwise provided in this Agreement, reimbursements disbursement of Project Funds will be made as follows: 1. (a) Upon execution and delivery of this Agreement by both parties, the Recipient may request immediate reimbursement of any eligible incurred planning and design allowance costs through submission to the State Water Board of the Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed. 2. (b) The Recipient must submit a Reimbursement Request reimbursement request for costs incurred prior to the date this Agreement is executed by the State Water Board no later than ninety (90) days after this Agreement is executed by the State Water Board. Late Reimbursement Requests reimbursement requests may not be honored. 3. (c) The Recipient may request reimbursement of eligible construction and equipment costs consistent with budget amounts approved by the Division in the Final Budget Approval. (d) Additional Project Funds will be promptly disbursed to the Recipient upon receipt of Reimbursement Request reimbursement request Form 260 and Form 261, or any amendment thereto, duly completed and executed by the Recipient for incurred costs consistent with this Agreement, along with receipt of progress reports due under this Agreement.Exhibit A. 4. (e) The Recipient must not request reimbursement for any Project Cost until such cost has been incurred and is currently due and payable by the Recipient, although the actual payment of such cost by the Recipient is not required as a condition of Reimbursement Requestreimbursement request. Supporting documentation (e.g., receipts) must be submitted with each Reimbursement Requestreimbursement request. The amount requested for Recipient’s administration costs must include a calculation formula (i.e., hours or days worked times the hourly or daily rate = total amount claimed). Reimbursement Disbursement of Project Funds will be made only after receipt of a complete, adequately supported, properly documented, and accurately addressed Reimbursement Request. Upon request by the Division, supporting documents for professional and administrative services must include the employees’ names, classifications, labor rates, hours worked, and descriptions of the tasks performedreimbursement request. Reimbursement Requests requests submitted without supporting documents may be wholly or partially withheld at the discretion of the Division. 5. (f) The Recipient must spend Project Funds within 30 days of receipt. If the Recipient earns interest earned on Project Funds, it must report that interest immediately to the State Water Board. The State Water Board may deduct earned interest from future reimbursementsdisbursements. 6. (g) The Recipient must shall not request a reimbursement unless that Project Cost is allowable, reasonable, and allocable. 7. (h) Notwithstanding any other provision of this Agreement, no reimbursement disbursement shall be required at any time or in any manner which is in violation of or in conflict with federal or state laws, policies, or regulations. (i) No work or travel outside the State of California is permitted under this Agreement unless the Division provides prior written authorization. Notwithstanding any other provision of Failure to comply with this restriction may result in termination this Agreement, pursuant to Exhibit C. Any reimbursement for necessary travel and per diem shall be at rates not to exceed those set by the Recipient agrees that the State Water Board may retain an amount equal to ten percent (10%) California Department of Human Resources at ▇▇▇▇://▇▇▇.▇▇▇▇▇.▇▇.▇▇▇/employees/Pages/travel-reimbursements.aspx. as of the Project Funding Amount until Project Completion. Any retained amounts due to the Recipient will be promptly disbursed to the Recipient, without interest, upon Project Completion. Except as follows, construction date costs and disbursements are not available until after the Division has approved the final budget form submitted incurred by the Recipient. The Deputy Director of the Division may authorize the disbursement of up to ten percent (10%) of Project Funds for the reimbursement of eligible construction costs and pre-purchased materials prior to Division approval of the final budget form submitted by the Recipient. All other construction costs are not eligible for reimbursement until after the Division has approved the final budget form submitted by the Recipient. Construction costs incurred prior to the Eligible Construction Start Date are not eligible for reimbursement.

Appears in 1 contract

Sources: Construction Installment Sale Agreement

Reimbursement Procedure. Except as may be otherwise provided in this Agreement, reimbursements disbursement of Project Funds will be made as follows: 1. (a) Upon execution and delivery of this Agreement by both parties, the Recipient may request immediate reimbursement of any eligible incurred planning and design allowance costs through submission to the State Water Board of the Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed.. To be eligible for reimbursement, Project Costs, including any planning and design allowance costs, must have been incurred in compliance with all applicable requirements, including the state and federal cross-cutting requirements listed in Exhibit C. 2. (b) The Recipient must submit a Reimbursement Request reimbursement request for costs incurred prior to the date this Agreement is executed by the State Water Board no later than ninety (90) days after this Agreement is executed by the State Water Board. Late Reimbursement Requests reimbursement requests may not be honored. 3. (c) The Recipient may request reimbursement of eligible construction and equipment costs consistent with budget amounts approved by the Division in the Final Budget Approval. (d) Additional Project Funds will be promptly disbursed to the Recipient upon receipt of Reimbursement Request reimbursement request Form 260 and Form 261, or any amendment thereto, duly completed and executed by the Recipient for incurred costs consistent with this Agreement, along with receipt of progress reports due under this Agreement.Exhibit A.‌ 4. (e) The Recipient must not request reimbursement for any Project Cost until such cost has been incurred and is currently due and payable by the Recipient, although the actual payment of such cost by the Recipient is not required as a condition of Reimbursement Requestreimbursement request. Supporting documentation (e.g., receipts) must be submitted with each Reimbursement Requestreimbursement request. The amount requested for Recipient’s administration costs must include a calculation formula (i.e., hours or days worked times the hourly or daily rate = total amount claimed). Reimbursement Disbursement of Project Funds will be made only after receipt of a complete, adequately supported, properly documented, and accurately addressed Reimbursement Requestreimbursement request. Upon request by the Division, supporting documents for professional and administrative services must include the employees’ names, classifications, labor rates, hours worked, and descriptions of the tasks performed. Reimbursement Requests requests submitted without supporting documents may be wholly or partially withheld at the discretion of the Division. 5. (f) The Recipient must spend Project Funds within 30 days of receipt. If the Recipient earns interest earned on Project Funds, it must report that interest immediately to the State Water Board. The State Water Board may deduct earned interest from future reimbursementsdisbursements. 6. (g) The Recipient must shall not request a reimbursement unless that Project Cost is allowable, reasonable, and allocable. 7. (h) Notwithstanding any other provision of this Agreement, no reimbursement disbursement shall be required at any time or in any manner which is in violation of or in conflict with federal or state laws, policies, or regulations. (i) No work or travel outside the State of California is permitted under this Agreement unless the Division provides prior written authorization. Notwithstanding any other provision of Failure to comply with this restriction may result in termination this Agreement, pursuant to Exhibit C. Any reimbursement for necessary travel and per diem shall be at rates not to exceed those set by the Recipient agrees that the State Water Board may retain an amount equal to ten percent (10%) California Department of Human Resources at ▇▇▇▇://▇▇▇.▇▇▇▇▇.▇▇.▇▇▇/employees/Pages/travel-reimbursements.aspx. as of the Project Funding Amount until Project Completion. Any retained amounts due to the Recipient will be promptly disbursed to the Recipient, without interest, upon Project Completion. Except as follows, construction date costs and disbursements are not available until after the Division has approved the final budget form submitted incurred by the Recipient. The Deputy Director of the Division may authorize the disbursement of up to ten percent (10%) of Project Funds for the reimbursement of eligible construction costs and pre-purchased materials prior to Division approval of the final budget form submitted by the Recipient. All other construction costs are not eligible for reimbursement until after the Division has approved the final budget form submitted by the Recipient. Construction costs incurred prior to the Eligible Construction Start Date are not eligible for reimbursement.

Appears in 1 contract

Sources: Construction Installment Sale Agreement

Reimbursement Procedure. (a) Except as may be otherwise provided in this Agreement, reimbursements will be made as follows: 1. Upon execution and delivery of this Agreement by both parties, the Recipient may request immediate reimbursement of any eligible incurred planning and design allowance costs as specified below through submission to the State Water Board of the Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed. 2. The Recipient must submit a Reimbursement Request for costs incurred prior to the date this Agreement is executed by the State Water Board no later than ninety (90) days after this Agreement is executed by the State Water Board. Late Reimbursement Requests may not be honored. 3. Additional Project Funds will be promptly disbursed to the Recipient upon receipt of Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed by the Recipient for incurred costs consistent with this Agreement, along with receipt of progress reports due under this Agreement.Exhibit A. 4. The Recipient must not request reimbursement for any Project Cost until such cost has been incurred and is currently due and payable by the Recipient, although the actual payment of such cost by the Recipient is not required as a condition of Reimbursement Requestreimbursement request. Supporting documentation (e.g., receipts) must be submitted with each Reimbursement Request. The amount requested for Recipient’s administration costs must include a calculation formula (i.e., hours or days worked times the hourly or daily rate = total amount claimed). Reimbursement of Project Funds will be made only after receipt of a complete, adequately supported, properly documented, and accurately addressed Reimbursement Request. Upon request by the Division, supporting documents for professional and administrative services must include the employees’ names, classifications, labor rates, hours worked, and descriptions of the tasks performed. Reimbursement Requests submitted without supporting documents may be wholly or partially withheld at the discretion of the Division. 5. The Recipient must spend Project Funds within 30 days of receipt. If the Recipient earns interest earned on Project Funds, it must report that interest immediately to the State Water Board. The State Water Board may deduct earned interest from future reimbursements. 6. The Recipient must shall not request a reimbursement unless that Project Cost is allowable, reasonable, and allocable. 7. Notwithstanding any other provision of this Agreement, no reimbursement shall be required at any time or in any manner which is in violation of or in conflict with federal or state laws, policies, or regulations. . (b) Notwithstanding any other provision of this Agreement, the Recipient agrees that the State Water Board may retain an amount equal to ten percent (10%) of the Project Funding Amount until Project Completion. Any retained amounts due to the Recipient will be promptly disbursed to the Recipient, without interest, upon Project Completion. . (c) Except as follows, construction costs and disbursements are not available until after the Division has approved the final budget form submitted by the Recipient. The Deputy Director of the Division may authorize the disbursement of up to ten percent (10%) of Project Funds for the reimbursement of eligible construction costs and pre-purchased materials prior to Division approval of the final budget form submitted by the Recipient. All other construction costs are not eligible for reimbursement until after this the Division has approved the final budget form submitted by the Recipient. Construction costs incurred prior to the Eligible Construction Start Date are not eligible for reimbursement.

Appears in 1 contract

Sources: Grant and Loan Agreement

Reimbursement Procedure. Except as may be otherwise provided in this Agreement, reimbursements will be made as follows: 1. Upon execution and delivery of this Agreement by both parties, the Recipient may request immediate reimbursement of any eligible incurred planning and design allowance costs through submission to the State Water Board of the Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed., except that the Recipient may not acquire or request reimbursement of costs for materials, equipment, or land until after any required environmental review process is complete and the Division provides written notice that such items may be reimbursed under this Agreement. To be eligible for reimbursement, Project Costs, including any planning and design allowance costs, must have been incurred in compliance with all applicable requirements, including the state cross-cutting requirements listed in Exhibits C and D. 2. The Recipient must submit a Reimbursement Request for costs incurred prior to the date this Agreement is executed by the State Water Board no later than ninety (90) days after this Agreement is executed by the State Water Board. Late Reimbursement Requests may not be honored. 3. Additional Project Funds will be promptly disbursed to the Recipient upon receipt of Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed by the Recipient for incurred costs consistent with this Agreement, along with receipt of progress reports due under this Agreement. 4. The Recipient shall not solicit construction bids or conduct any construction activities until the Division has provided written bid solicitation approval. The Division will not provide bid solicitation approval until after the Division completes its applicable review, which will include but not be limited to environmental review. 5. The Recipient must not request reimbursement for any Project Cost until such cost has been incurred and is currently due and payable by the Recipient, although the actual payment of such cost by the Recipient is not required as a condition of Reimbursement Request. Supporting documentation (e.g., receipts) must be submitted with each Reimbursement Request. The amount requested for Recipient’s administration costs must include a calculation formula (i.e., hours or days worked times the hourly or daily rate = total amount claimed). Reimbursement of Project Funds will be made only after receipt of a complete, adequately supported, properly documented, and accurately addressed Reimbursement Request. Upon request by the Division, supporting documents for professional and administrative services must include the employees’ names, classifications, labor rates, hours worked, and descriptions of the tasks performed. Reimbursement Requests submitted without supporting documents may be wholly or partially withheld at the discretion of the Division. 56. The Recipient must spend Project Funds within 30 days of receipt. If the Recipient earns interest earned on Project Funds, it must report that interest immediately to the State Water Board. The State Water Board may deduct earned interest from future reimbursements. 67. The Recipient must not request a reimbursement unless that Project Cost is allowable, reasonable, and allocable. 78. Notwithstanding any other provision of this Agreement, no reimbursement shall be required at any time or in any manner which is in violation of or in conflict with federal or state laws, policies, or regulations. Notwithstanding any other provision of this Agreement, the Recipient agrees that the State Water Board may retain an amount equal to ten percent (10%) of the Project Funding Amount until Project Completion. Any retained amounts due to the Recipient will be promptly disbursed to the Recipient, without interest, upon Project Completion. Except as follows, No Project construction costs and disbursements are not available shall proceed until after the Division has approved the final budget form submitted by the Recipient. The Deputy Director of the Division may authorize the disbursement of up provided approval for construction to ten percent (10%) of Project Funds for the reimbursement of eligible construction costs and pre-purchased materials prior to Division approval of the final budget form submitted by the Recipient. All other construction costs are not eligible for reimbursement until after the Division has approved the final budget form submitted by the Recipientproceed. Construction costs incurred prior to the Eligible Construction Start Date are not eligible for reimbursement.date that the Division provides approval to proceed are

Appears in 1 contract

Sources: Expedited Drinking Water Grant Agreement

Reimbursement Procedure. Except as may a. [Non-DAC] Project Funds will be otherwise provided in this Agreement, reimbursements will be made as followstwo reimbursements: 1. Reimbursement of approved costs of up to 50 percent of the total Project Funding Amount will occur after Division staff have approved the draft Project Report. Approval of the draft report will not occur until after the Mid-Course meeting, at the earliest. 2. Reimbursement of the remaining approved Project Costs will occur after Division staff have approved the final Project Report or have authorized suspension of work under this Agreement due to a determination of lack of feasibility. b. [if Recipient is DAC] Upon execution and delivery of this Agreement by both parties, the Recipient may request immediate reimbursement of any eligible incurred planning and design allowance costs through submission to the State Water Board of the Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed. Upon execution of this Agreement by both parties, the Recipient may request reimbursement of eligible incurred costs throughout the duration of the Project up until the Final Reimbursement Request Date. 2. c. [if Recipient is DAC] The Recipient must submit a Reimbursement Request for costs incurred prior to the date this Agreement is executed by the State Water Board no later than ninety (90) days after this Agreement is executed by the State Water Board. Late Reimbursement Requests may not be honored. 3. d. [if Recipient is DAC] Additional Project Funds will be promptly disbursed to the Recipient upon receipt of Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed by the Recipient for incurred costs consistent with this Agreement, along with receipt of progress reports due under this Agreement.Exhibit A. 4. e. The Recipient must not request reimbursement for any Project Cost until such cost has been incurred and is currently due and payable by the Recipient, although the actual payment of such cost by the Recipient is not required as a condition of Reimbursement Requestreimbursement. Supporting documentation (e.g., receipts) must be submitted with each Reimbursement Request. The amount requested for Recipient’s administration costs must include a calculation formula (i.e., hours or days worked times the hourly or daily rate = total amount claimed). Reimbursement of Project Funds will be made only after receipt of a complete, adequately supported, properly documented, and accurately addressed Reimbursement Request. Upon request by the Division, supporting documents for professional and administrative services must include the employees’ names, classifications, labor rates, hours worked, and descriptions of the tasks performed. Reimbursement Requests submitted without supporting documents may be wholly or partially withheld at the discretion of the Division. 5. f. The Recipient must spend Project Funds within 30 days of receipt. If the Recipient earns interest earned on Project Funds, it must report that interest immediately to the State Water Board. The State Water Board may deduct earned interest from future reimbursements. 6. g. The Recipient must not request a reimbursement unless that Project Cost is allowable, reasonable, and allocable. 7. h. Notwithstanding any other provision of this Agreement, no reimbursement shall be required at any time or in any manner which is in violation of or in conflict with federal or state laws, policies, or regulations. . i. Notwithstanding any other provision of this Agreement, the Recipient agrees that the State Water Board may retain an amount equal to ten percent (10%) of the Project Funding Amount until Project Completion. Any retained amounts due to the Recipient will be promptly disbursed to the Recipient, without interest, upon Project Completion. Except as follows, construction costs and disbursements are not available until after the Division has approved the final budget form submitted by the Recipient. The Deputy Director of the Division may authorize the disbursement of up to ten percent (10%) of Project Funds for the reimbursement of eligible construction costs and pre-purchased materials prior to Division approval of the final budget form submitted by the Recipient. All other construction costs are not eligible for reimbursement until after the Division has approved the final budget form submitted by the Recipient. Construction costs incurred prior to the Eligible Construction Start Date are not eligible for reimbursement.

Appears in 1 contract

Sources: Water Recycling Funding Program Planning Grant Agreement