Common use of REMOVAL OF SHOULDER BERMS Clause in Contracts

REMOVAL OF SHOULDER BERMS. Purchaser shall remove berms from road shoulders to perit escape of runoff. Purchaser shall install culverts as part of this contract. Culverts must be installed concurrently with subgrade work and must be installed before subgrade compaction and rock application. Culvert locations and the minimum requirements for culvert length and diameter are designated on the CULVERT AND DRAINAGE LIST. Culvert, downspout, and flume lengths may be adjusted to fit as-built conditions and may not terminate directly on unprotected soil. Culverts must meet the specifications in Clauses 10-15 through 10-23.

Appears in 6 contracts

Sources: Timber Sale Agreement, Timber Sale Agreement, Timber Sale Agreement

REMOVAL OF SHOULDER BERMS. Purchaser shall remove berms from road shoulders to perit permit escape of runoff. Purchaser shall install culverts as part of this contract. Culverts must be installed concurrently with subgrade work and must be installed before subgrade compaction and rock application. Culvert locations and the minimum requirements for culvert length and diameter are designated on the CULVERT AND DRAINAGE LIST. Culvert, downspout, and flume lengths may be adjusted to fit as-built conditions and may not terminate directly on unprotected soil. Culverts must meet the specifications in Clauses 10-15 through 10-23.

Appears in 2 contracts

Sources: Timber Sale Agreement, Timber Sale Agreement

REMOVAL OF SHOULDER BERMS. Purchaser shall remove berms from road shoulders to perit permit escape of runoff. Purchaser shall install culverts as part of this contract. Culverts must be installed concurrently with subgrade work and must be installed before subgrade compaction and rock application. Culvert locations and the minimum requirements for culvert length and diameter are designated on the CULVERT AND DRAINAGE LIST. Culvert, downspout, and flume lengths may be adjusted to fit as-built conditions and may not terminate directly on unprotected soil. Culverts must be new material and meet the specifications in Clauses 10-15 through 10-2323 except as provided in clause 5-6 USED CULVERT MATERIAL.

Appears in 2 contracts

Sources: Timber Sale Agreement, Timber Sale Agreement

REMOVAL OF SHOULDER BERMS. Purchaser shall remove berms from road shoulders to perit permit escape of runoff, except as specified in Clause 8-7 ROAD SHOULDER BERM INSTALLATION. Purchaser shall install culverts as part of this contract. Culverts must be installed concurrently with subgrade work and must be installed before subgrade compaction and rock application. Culvert locations and the minimum requirements for culvert length and diameter are designated on the CULVERT AND DRAINAGE LIST. Culvert, downspout, and flume lengths may be adjusted to fit as-built conditions and may not terminate directly on unprotected soil. Culverts must be new material and meet the specifications in Clauses 10-15 through 10-2323 except as provided in clause 5-6 USED CULVERT MATERIAL.

Appears in 1 contract

Sources: Delineation Agreement

REMOVAL OF SHOULDER BERMS. Purchaser shall remove berms from road shoulders to perit permit escape of runoff. DRAFT Purchaser shall install culverts as part of this contract. Culverts must be installed concurrently with subgrade work and must be installed before subgrade compaction and rock application. Culvert locations and the minimum requirements for culvert length and diameter are designated on the CULVERT AND DRAINAGE LIST. Culvert, downspout, and flume lengths may be adjusted to fit as-built conditions and may not terminate directly on unprotected soil. Culverts must be new material and meet the specifications in Clauses 10-15 17 through 10-2322.

Appears in 1 contract

Sources: Timber Sale Agreement

REMOVAL OF SHOULDER BERMS. On the following road, Purchaser shall remove berms from road shoulders to perit escape of runoffshoulders. Purchaser shall install culverts as part of this contract. Culverts must be installed concurrently with subgrade work and must be installed before subgrade compaction and rock application. Culvert locations and the minimum requirements for culvert length and diameter are designated on the CULVERT AND DRAINAGE LIST. Culvert, downspout, and flume lengths may be adjusted to fit as-built as‐built conditions and may not terminate directly on unprotected soil. Culverts must be new material and meet the specifications in Clauses 10-15 10‐15 through 10-2310‐24.

Appears in 1 contract

Sources: Timber Sale Agreement

REMOVAL OF SHOULDER BERMS. Purchaser shall remove berms from road shoulders to perit permit escape of runoff. DRAFT Purchaser shall install culverts as part of this contract. Culverts must be installed concurrently with subgrade work and must be installed before subgrade compaction and rock application. Culvert locations and the minimum requirements for culvert length and diameter are designated on the CULVERT AND DRAINAGE LIST. Culvert, downspout, and flume lengths may be adjusted to fit as-built conditions and may not terminate directly on unprotected soil. Culverts must be new material and meet the specifications in Clauses 10-15 through 10-23.

Appears in 1 contract

Sources: Timber Sale Agreement

REMOVAL OF SHOULDER BERMS. Purchaser shall remove berms from road shoulders to perit permit escape of runoff. Purchaser shall install culverts as part of this contract. Culverts must be installed concurrently with subgrade work and must be installed before subgrade compaction and rock application. Culvert locations and the minimum requirements for culvert length and diameter are designated on the CULVERT AND DRAINAGE LIST. Culvert, downspout, and flume lengths may be adjusted to fit as-built conditions and may not terminate directly on unprotected soil. Culverts must be new material and meet the specifications in Clauses 10-15 through 10-23.

Appears in 1 contract

Sources: Timber Sale Agreement

REMOVAL OF SHOULDER BERMS. On the following road(s), Purchaser shall remove berms from road shoulders to perit escape of runoffshoulders. Purchaser shall install culverts as part of this contract. Culverts must be installed concurrently with subgrade work and must be installed before subgrade compaction and rock application. Culvert locations and the minimum requirements for culvert length and diameter are designated on the CULVERT AND DRAINAGE LIST. Culvert, downspout, and flume lengths may be adjusted to fit as-built as‐built conditions and may not terminate directly on unprotected soil. Culverts must be new material and meet the specifications in Clauses 10-15 10‐17 through 10-2310‐22.

Appears in 1 contract

Sources: Repeater Agreement