Replacement Hardware, Parts and Materials Sample Clauses

The Replacement Hardware, Parts and Materials clause outlines the obligations and procedures for providing substitute or new components when original equipment or materials are defective, damaged, or otherwise require replacement. Typically, this clause specifies the timeframe for replacements, the standards or specifications the replacements must meet, and whether the cost is borne by the supplier or another party. Its core function is to ensure that any faulty or inadequate hardware or materials are promptly and adequately replaced, thereby maintaining the quality and functionality of the goods or services provided and minimizing operational disruptions.
Replacement Hardware, Parts and Materials. SONIFI, in its sole discretion, may use new or refurbished parts, materials or equipment to source and provide Covered Equipment replacements and to perform repairs and maintenance of the Covered Equipment.

Related to Replacement Hardware, Parts and Materials

  • Required hardware and software The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: ▇▇▇▇▇://▇▇▇▇▇▇▇.▇▇▇▇▇▇▇▇.▇▇▇/guides/signer-guide- signing-system-requirements.

  • Equipment and Materials CONTRACTOR shall provide all equipment, materials, and supplies necessary for the performance on the Agreement except:

  • Accessories, Spare Parts and Tools Accessories, spare parts and tools dispatched with a piece of equipment, machine, apparatus or vehicle, which are part of the normal equipment and included in the price thereof or which are not separately invoiced, shall be regarded as one with the piece of equipment, machine, apparatus or vehicle in question.

  • Filing Systems and Equipment A complete and comprehensive catalog of filing systems including vertical and lateral files, bookcases, mobile cabinets and freestanding file cabinets.

  • Stored Materials Upon prior written agreement between the Contractor and Region 4 ESC, payment may be made for materials not incorporated in the work but delivered and suitably stored at the site or some other location, for installation at a later date. An inventory of the stored materials must be provided to Region 4 ESC prior to payment. Such materials must be stored and protected in a secure location and be insured for their full value by the Contractor against loss and damage. Contractor agrees to provide proof of coverage and additionally insured upon request. Additionally, if stored offsite, the materials must also be clearly identified as property of Region 4 ESC and be separated from other materials. Region 4 ESC must be allowed reasonable opportunity to inspect and take inventory of stored materials, on or offsite, as necessary. Until final acceptance by Region 4 ESC, it shall be the Contractor's responsibility to protect all materials and equipment. Contractor warrants and guarantees that title for all work, materials and equipment shall pass to Region 4 ESC upon final acceptance.