Request for Information (RFI. Provide responses to questions by the Contractor on the drawings, specifications, or other Contract documents.
Request for Information (RFI. The Consultant shall respond to RFIs as follows based on the following prioritization from the Contractor: High – Engineer to Respond within 1 to 2 Calendar Days Medium – Engineer to Respond within 2 to 5 Calendar Days Low – Engineer to Respond within 5 to 10 Calendar Days
Request for Information (RFI. A written request made by Contractor for additional information to clarify an ambiguity in the Contact Documents.
Request for Information (RFI. RFIs are issued to determine the availability of products or services in the market. From RFI responses, specification is drawn that will be used to the open market.
Request for Information (RFI. A Request for Information is a written request from the CM to the Design Professional seeking an interpretation or clarification of the Construction Documents.
Request for Information (RFI. Request for Information" is the name given to a document issued by Contractor seeking clarification and/or additional information regarding an aspect of the Work. The response to the RFI does not constitute authorization or direction to proceed with any changed or additional work. Changed or additional work must be separately authorized by District.
Request for Information (RFI. An inquiry submitted by the CMR to the DP, requesting clarification or direction. All inquiries other than those considered by the DP to be of low significance, must be submitted and tracked as an RFI. As applicable, each RFI submitted must include information from the CMR regarding any cost or time implications of which he is aware at the time the RFI is submitted. All RFIs must be copied to SCCPSS; in the event SCCPSS wishes to discuss the ASI with the DP or with the CMR, or vice-versa, this should occur immediately upon receipt.
Request for Information (RFI. ▇▇▇▇▇▇-▇▇▇▇ will respond to Contractor requests for information and issue clarifications and interpretations of the Contract Documents to the Client within this fee. Any authorization of variations from the Contract Documents will be made by the Client. Additional RFI requests will be considered additional services.
Request for Information (RFI is a written request prepared by the Contractor requesting the Architect to provide additional information necessary to clarify or amplify an item which the Contractor believes is not clearly shown or called for in the drawings or specifications, or to address problems which have arisen under field conditions.
Request for Information (RFI a solicitation used to obtain “state of the artinformation on goods and/or services for informational purposes only.