REQUIRED Major-Specific Content Clause Samples

REQUIRED Major-Specific Content. An associate degree transferable under this Agreement must include at least 24 credits of Major-Specific coursework that incorporates all of the competencies identified in the following six broad content areas.
REQUIRED Major-Specific Content. Under this Agreement, a fully transferable associate degree in Geography must include at least six (6) college- level credits that incorporate all of the competencies identified in at least two of the three broad content areas: 1. Physical Geography
REQUIRED Major-Specific Content. (12 credits) 1. American/United States Government/Politics 2. International Relations/World Politics 3. Comparative Politics/Comparative Government 4. Select one of the following areas: • Political Philosophy/Theory/Thought • State and Local Government/Politics The competencies required in each of the major content areas are outlined below.
REQUIRED Major-Specific Content. Students transferring under this Agreement will have completed 12 credits of coursework in the following areas: 1. Two-Dimensional Design – 3 credits 2. Three-Dimensional Design – 3 credits 3. Drawing I – 3 credits 4. Art History – 3 credits 1. Two-Dimensional Design – 3 credits 2. Three-Dimensional Design – 3 credits 3. Drawing I – 3 credits
REQUIRED Major-Specific Content. An associate degree transferable under this Agreement must include at least 24 credits of Major-Specific coursework that incorporates all of the competencies identified in the following broad content areas. 1. Theatre and its Elements – at least 3 and up to 6 credits 2. Acting– at least 3 and up to 9 credits 3. Production – at least 3 and up to 6 credits 4. Stagecraft – at least 3 and up to 9 credits

Related to REQUIRED Major-Specific Content

  • ODUF Packing Specifications 6.3.1 A pack will contain a minimum of one message record or a maximum of 99,999 message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of 99 packs and a minimum of one pack.

  • Escrow Format Specification Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-▇▇▇▇▇-▇▇▇▇▇▇▇-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-▇▇▇▇▇-▇▇▇▇▇▇▇-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.

  • Packing Specifications 7.3.1 A pack will contain a minimum of one message record or a maximum of 99,999 message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of 99 packs and a minimum of one pack.

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

  • Project Specific Milestones In addition to the milestones stated in Section 212.5 of the Tariff, as applicable, during the term of this ISA, Interconnection Customer shall ensure that it meets each of the following development milestones: 6.1 Substantial Site work completed. On or before July 1, 2021, Interconnection Customer must demonstrate completion of at least 20% of project site construction. At this time, Interconnection Customer must submit to Interconnected Transmission Owner and Transmission Provider initial drawings, certified by a professional engineer, of the Customer Interconnection Facilities. 6.2 Delivery of major electrical equipment. On or before July 15, 2021, Interconnection Customer must demonstrate that all generating units have been delivered to Interconnection Customer’s project site.