REQUIREMENTS FOR INP Clause Samples

REQUIREMENTS FOR INP. 70.1. Cut-Over Process 70.1.1. Sprint and CLEC shall cooperate in the process of porting numbers from one LEC to another so as to limit service outage for the ported subscriber. 70.1.1.1. For a Coordinated Cutover Environment, Sprint and CLEC will coordinate the disconnect and switch translations as close to the requested time as possible. The coordination shall be pre- specified by CLEC and agreed to by both Parties and in no case shall begin more than thirty (30) minutes after the agreed upon time.
REQUIREMENTS FOR INP. 67.1. Cut-Over Process 67.1.1. Sprint and CLEC shall cooperate in the process of porting numbers from one carrier to another so as to limit service outage for the ported subscriber. 67.1.1.1. For a Coordinated Cutover Environment, Sprint and CLEC will coordinate the disconnect and switch translations as close to the requested time as possible. The coordination shall be pre-specified by CLEC and agreed to by both parties and in no case shall begin more than thirty (30) minutes after the agreed upon time. 67.1.1.2. For a Non-Coordinated Cutover Environment, the Parties will agree to a mutually satisfactory cutover time and Sprint shall schedule an update of disconnect and switch translations at the agreed upon cutover time. Such updates will be available to CLEC at Parity with Sprint’s own availability for such activity. Sprint and CLEC shall each provide an appropriate operations contact with whom the Parties can contact in the event manual intervention is needed to complete the cutover. In the event of manual intervention, and if Sprint is unable to resolve the issue within sixty (60) minutes, Sprint shall notify CLEC of the issue and CLEC and Sprint shall determine the plan to resolve it.
REQUIREMENTS FOR INP. 3 Attachment 8 Page 1 INTERIM NUMBER PORTABILITY --------------------------
REQUIREMENTS FOR INP. 60 ATTACHMENT VI - LOCAL NUMBER PORTABILITY 1. INTRODUCTION ......................................................... 63 2. TRANSITION FROM INP TO LNP............................................ 64 3. TESTING............................................................... 64
REQUIREMENTS FOR INP 

Related to REQUIREMENTS FOR INP

  • DOCUMENTS FOR INSPECTION sufficient copies of all documents required to be available for inspection as provided in the Base Prospectus or Drawdown Prospectus (as the case may be) or, in relation to any Notes, the Conditions; and

  • COPIES OF DOCUMENTS AVAILABLE FOR INSPECTION Each Paying Agent shall hold available for inspection at its specified office during normal business hours copies of all documents required to be so available by the Conditions of any Notes or the rules of any relevant Stock Exchange (or any other relevant authority). For these purposes, the Issuer shall provide the Paying Agents with sufficient copies of each of the relevant documents.

  • Requirements for Protection In compliance with NPCC requirements and Good Utility Practice, Developer shall provide, install, own, and maintain relays, circuit breakers and all other devices necessary to remove any fault contribution of the Large Generating Facility to any short circuit occurring on the New York State Transmission System not otherwise isolated by Connecting Transmission Owner’s equipment, such that the removal of the fault contribution shall be coordinated with the protective requirements of the New York State Transmission System. Such protective equipment shall include, without limitation, a disconnecting device or switch with load- interrupting capability located between the Large Generating Facility and the New York State Transmission System at a site selected upon mutual agreement (not to be unreasonably withheld, conditioned or delayed) of the Developer and Connecting Transmission Owner. Developer shall be responsible for protection of the Large Generating Facility and Developer’s other equipment from such conditions as negative sequence currents, over- or under-frequency, sudden load rejection, over- or under-voltage, and generator loss-of-field. Developer shall be solely responsible to disconnect the Large Generating Facility and Developer’s other equipment if conditions on the New York State Transmission System could adversely affect the Large Generating Facility.

  • DOCUMENTS AVAILABLE FOR INSPECTION Each of the Paying Agents and the Registrar shall make available for inspection during normal business hours at its Specified Office such documents as may be specified as so available at the specified office of such agent in the Base Prospectus or Drawdown Prospectus (as the case may be) or, in relation to any Notes, the Conditions, or as may be required by any listing authority, stock exchange and/or quotation system by which any Notes may from time to time be admitted to listing, trading and/or quotation.