Responsibility for Correction Clause Samples

The "Responsibility for Correction" clause defines which party is obligated to address and remedy any errors, defects, or non-conformities identified in the goods, services, or deliverables provided under the agreement. Typically, this clause specifies the timeframe within which corrections must be made and may outline the process for notifying the responsible party of issues requiring correction. Its core practical function is to ensure accountability and timely resolution of problems, thereby maintaining quality standards and protecting the interests of the receiving party.
Responsibility for Correction. Any defects of design, workmanship, or materials that would result in non-compliance with the Contract specification or law shall be fully corrected by the Contractor (including parts, labor, shipping or freight) without cost to the County. This includes any necessary labor to remove, repair, install, or to ship or transport any item to a point of repair and return.
Responsibility for Correction. It is agreed that the bidder shall be fully responsible for making any correction, replacement, or modification necessary for specification or legal compliance. In the event of a call back, Bidder agrees to give the City first priority. Bidder agrees that if the product or service offered does not comply with the written specification, the Materials Manager has the right to cancel the sale at any time with full refund within thirty (30) calendar days after notice of noncompliance and bidder further agrees to be fully responsible for any consequential damages suffered by the City.
Responsibility for Correction. It is agreed that the Consultant shall be fully responsible for making any correction, replacement, or modification necessary for specification or legal compliance.
Responsibility for Correction. It is agreed that the Contractor shall be fully responsible for making any correction, replacement, or modification necessary for specification or legal compliance. In the event of any call back, Contractor agrees to give the City first priority. Contractor agrees that if the product or service offered does not comply with the foregoing, the City has the right to cancel the purchase at any time with full refund within 30 calendar days after notice of non-compliance and Contractor further agrees to be fully responsible for any consequential damages suffered by the City.

Related to Responsibility for Correction

  • Responsibility for Use (a) The Company alone will be responsible for furnishing, or arranging for a third party to furnish, all data and information required by the Documentation and the specifications therein for the Licensed System to function and perform in accordance with the Documentation, other than the data and information residing in the Licensed System in connection with BNYM’s performance of the Core Services. BNYM shall have no liability or responsibility for any Loss caused in whole or in part by the Company’s or a Permitted User’s exercise of the Licensed Rights or use of the Licensed System or by data or information of any nature inputted into the Licensed System by or under the direction or authorization of Company or a Permitted User; provided, however, this Section 2.5 shall not relieve BNYM of its obligation to act in accordance with its obligations under the Main Agreement. Company shall be responsible and solely liable for the cost or expense of regenerating any output or other remedial action if the Company, a Permitted User or an agent of either shall have failed to transmit properly and in the correct format any data or information, shall have transmitted erroneous or incorrect information or data, or shall have failed to timely verify or reconcile any such data or information when it is generated by the Licensed System (“Data Faults”).

  • Responsibility for Content Vendor is solely responsible for administration, content, intellectual property rights, and all materials at Vendor’s website. DIR reserves the right to require a change of listed content if, in the opinion of DIR, it does not adequately represent the Contract.

  • Responsibility for Costs The Servicer is responsible for collection from such Borrower of any recording or similar costs or expenses incidental to the granting of relief with respect to a delinquent Mortgage Loan.

  • Responsibility for Damage Resident is solely responsible for any damage, defacement or loss arising within the assigned bedroom space. All assigned residents of an apartment are jointly and severally responsible for any damage, defacement or loss to common areas, other parts of the Property, fixtures or appliances, except for the portion of damages over $100,000 where it is finally established that Resident or one or more other residents of the apartment were solely at fault for the entire loss, in which case such person(s) will be solely responsible. Resident is fully responsible for the conduct of Resident’s guests, visitors, licensees and invitees (“Guests”), including without limitation harm to individuals or damage or defacement of any part of the Property or its fixtures or property of third parties (including other residents) by such Guests.

  • Responsibility for Property Except as expressly set forth in Section 3.25, Contractor shall limit its operations to the Stage 2 Site. Contractor shall plan and conduct its operations so that neither Contractor nor any of its Subcontractors or Sub-subcontractors shall (i) enter upon lands (other than the Stage 2 Site and Off-Site Rights of Way and Easements) or waterbodies in their natural state unless authorized by the appropriate owner or entity; (ii) close or obstruct any utility installation, highway, waterway, harbor, road or other property unless Permits are obtained and authorized by the appropriate entity or authority; or (iii) disrupt or otherwise interfere with the operation of any portion of any pipeline, telephone, conduit or electric transmission line, ditch, navigational aid, dock or structure unless otherwise specifically authorized by the appropriate entity or authority. The foregoing includes damage arising from performance of the Work through operation of Construction Equipment or stockpiling of materials. If damage occurs to Subproject 1 or Subproject 2 prior to substantial completion of such applicable Subproject 1 or Subproject 2, liability for such damage shall be governed by the Stage 1 EPC Agreement.