Common use of Results and Observations Clause in Contracts

Results and Observations. 2.7.1 The monitoring results for 1-hour TSP and 24-hour TSP are summarized in Table 2.4 and 2.5 respectively. Detailed impact air quality monitoring results are presented in Appendix G. Table 2.4 Summary of 1-hour TSP Monitoring Results in the Reporting Period Average (g/m3) Range (g/m3) Action Level (g/m3) Limit Level (g/m3) AMS2 82 77 – 85 374 500 AMS3B 81 77 – 85 368 500 AMS7 81 75 – 85 370 500 Table 2.5 Summary of 24-hour TSP Monitoring Results in the Reporting Period Average (g/m3) Range (g/m3) Action Level (g/m3) Limit Level (g/m3) AMS2 65 46 – 85 176 260 AMS3B 86 49 – 130 167 260 AMS7 72 47 – 96 183 260 2.7.2 No Action or Limit Level Exceedance of 1-hr TSP and 24-hr TSP was recorded in the reporting month. 2.7.3 The major dust source in the reporting period included construction activities from the Project, construction activities by other contacts, as well as nearby traffic emissions. 2.7.4 The event action plan is annexed in Appendix L. 2.7.5 Meteorological information collected from the wind station during the monitoring periods on the monitoring dates, as shown in Figure 2, including wind speed and wind direction, is annexed in Appendix H.

Appears in 1 contract

Sources: Environmental Monitoring & Audit Report Submission

Results and Observations. 2.7.1 The monitoring results for 1-hour TSP and 24-hour TSP are summarized in Table 2.4 and 2.5 respectively. Detailed impact air quality monitoring results are presented in Appendix G. Table 2.4 Summary of 1-hour TSP Monitoring Results in the Reporting Period Average (gμg/m3) Range (gμg/m3) Action Level (gμg/m3) Limit Level (gμg/m3) AMS2 82 77 – 85 78 71-84 374 500 AMS3B 81 77 – 85 79 73-84 368 500 AMS7 81 75 – 85 79 73-84 370 500 Table 2.5 Summary of 24-hour TSP Monitoring Results in the Reporting Period Average (gμg/m3) Range (gμg/m3) Action Level (gμg/m3) Limit Level (gμg/m3) AMS2 65 46 – 85 176 260 AMS3B 86 49 – 130 167 260 AMS7 72 47 – 96 183 260) 2.7.2 No All 24-Hour TSP and 1-Hour TSP results were below the Action or and Limit Level Exceedance of 1-hr TSP and 24-hr TSP was recorded in the reporting month. 2.7.3 The major dust source in the reporting period included construction activities from the Project, construction activities by other contacts, as well as nearby traffic emissions. 2.7.4 The event action plan is annexed in Appendix L. 2.7.5 2.7.4 Meteorological information collected from the wind station during the monitoring periods on the monitoring dates, as shown in Figure 2, including wind speed and wind direction, is annexed in Appendix H.

Appears in 1 contract

Sources: Environmental Monitoring & Audit Report