RFC Submittal Clause Samples

The RFC Submittal clause outlines the process by which a party must formally submit a Request for Change (RFC) to propose modifications to an existing agreement, project scope, or deliverable. Typically, this involves providing written documentation that details the proposed change, the reasons for it, and any anticipated impacts on cost, schedule, or performance. By establishing a clear and standardized procedure for submitting changes, this clause helps ensure that all parties are informed and can review, approve, or reject changes in an organized manner, thereby reducing misunderstandings and maintaining project control.
RFC Submittal. ‌ 15 When the design for a given element or area is 100 percent complete and all previous 16 comments have been addressed and appropriately incorporated, Developer shall prepare and 17 submit the RFC Submittal to ADOT. The RFC Submittal must include Plans, specifications, 18 technical memorandums, reports, studies, calculations, and other pertinent data, as applicable 19 with the RFC Submittal. The RFC Submittal must also include a Comment Resolution Form 20 showing how the RFC Submittal has addressed the review comments generated during 21 previous submittal reviews. The engineer-of-record (by discipline) must sign and seal the RFC 22 Submittal prior to construction of the relevant Project component.
RFC Submittal. ‌ 41 When the design for a given element or area is 100 percent complete and all previous comments 42 have been addressed and appropriately incorporated, Developer shall prepare and submit the 43 RFC Submittal to ADOT. The RFC Submittal must include Plans, specifications, technical 1 memorandums, reports, studies, calculations, and other pertinent data, as applicable with the 2 RFC Submittal. The RFC Submittal must also include a Comment Resolution Form showing how 3 the RFC Submittal has addressed the review comments generated during previous submittal
RFC Submittal. ‌ 36 When the design for a given element or area is 100 percent complete and all previous 37 comments have been addressed and appropriately incorporated, Developer shall prepare and 38 submit the RFC Submittal to ADOT. The RFC Submittal must include Plans, specifications, 39 technical memorandums, reports, studies, calculations, and other pertinent data, as applicable 40 with the RFC Submittal. The RFC Submittal must also include a Comment Resolution Form 41 showing how the RFC Submittal has addressed the review comments generated during 1 previous submittal reviews. The engineer-of-record (by discipline) must sign and seal the RFC 2 Submittal prior to construction of the relevant Project component. 3 ADOT’s review of any RFC package does not constitute approval of subsequent construction 4 and does not relieve Developer of its responsibility to comply with the requirements of the 5 Contract Documents. Developer shall ensure construction complies with the requirements of the 6 Contract Documents, Laws, and Governmental Approvals. Developer shall bear the risk of any 7 required modifications to the component construction due to subsequent Design Changes 8 resulting from further design development.
RFC Submittal. 21 When the design for a given element or area is 100 percent complete and all previous 22 comments have been addressed and appropriately incorporated, Developer shall prepare and

Related to RFC Submittal

  • Submittal Reports, plans, surveys, field notes, original drawings, computer tapes, graphic files, tracings, calculations, analyses, reports, specifications, data, sketches and/or schematics prepared by A/E and supporting documents (collectively referred to hereinabove and hereinafter as the "A/E Work Product(s)"), shall be submitted by A/E on or before the dates specified for completion, as set out in the Production Schedule set forth in Exhibit C.

  • REPORT SUBMISSION 1. Copies of reporting packages for audits conducted in accordance with 2 CFR Part 200, Subpart F-Audit Requirements, and required by PART I of this form shall be submitted, when required by 2 CFR 200.512, by or on behalf of the recipient directly to the Federal Audit Clearinghouse (FAC) as provided in 2 CFR 200.36 and 200.512 A. The Federal Audit Clearinghouse designated in 2 CFR §200.501(a) (the number of copies required by 2 CFR §200.501(a) should be submitted to the Federal Audit Clearinghouse), at the following address: Federal Audit Clearinghouse Bureau of the Census ▇▇▇▇ ▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Submissions of the Single Audit reporting package for fiscal periods ending on or after January 1, 2008, must be submitted using the Federal Clearinghouse’s Internet Data Entry System which can be found at ▇▇▇▇://▇▇▇▇▇▇▇▇▇.▇▇▇▇▇▇.▇▇▇/facweb/ 2. Copies of financial reporting packages required by PART II of this Attachment shall be submitted by or on behalf of the recipient directly to each of the following: A. The Department of Environmental Protection at one of the following addresses: By Mail: Florida Department of Environmental Protection Office of Inspector General, MS 40 ▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇ Tallahassee, Florida 32399-3000 Electronically: ▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇@▇▇▇.▇▇▇▇▇.▇▇.▇▇ B. The Auditor General’s Office at the following address: Auditor General Local Government Audits/342 ▇▇▇▇▇▇ ▇▇▇▇▇▇ Building, Room ▇▇▇ ▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇▇, ▇▇▇▇▇▇▇ ▇▇▇▇▇-1450 The Auditor General’s website (▇▇▇▇://▇▇▇▇▇▇▇▇▇.▇▇▇/) provides instructions for filing an electronic copy of a financial reporting package. 3. Copies of reports or management letters required by PART III of this Attachment shall be submitted by or on behalf of the recipient directly to the Department of Environmental Protection at one of the following addresses: By Mail: Florida Department of Environmental Protection Office of Inspector General, MS 40 ▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇ Tallahassee, Florida 32399-3000 Electronically: ▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇@▇▇▇.▇▇▇▇▇.▇▇.▇▇ 4. Any reports, management letters, or other information required to be submitted to the Department of Environmental Protection pursuant to this Agreement shall be submitted timely in accordance with 2 CFR 200.512, section 215.97, F.S., and Chapters 10.550 (local governmental entities) or 10.650 (nonprofit and for-profit organizations), Rules of the Auditor General, as applicable. 5. Recipients, when submitting financial reporting packages to the Department of Environmental Protection for audits done in accordance with 2 CFR 200, Subpart F-Audit Requirements, or Chapters 10.550 (local governmental entities) and 10.650 (non and for-profit organizations), Rules of the Auditor General, should indicate the date and the reporting package was delivered to the recipient correspondence accompanying the reporting package.

  • Claims Submission We will submit your claims and assist you in any way we reasonably can to help get your claims paid. Your insurance company may need you to supply certain information directly. It is your responsibility to comply with their request. Please be aware that the balance of your claim is your responsibility whether or not your insurance company pays your claim. Your insurance benefit is a contract between you and your insurance company; we are not party to that contract.

  • BID SUBMISSION All Bids are to be packaged, sealed and submitted to the location stated in the Bid Specifications. Bidders are solely responsible for timely delivery of their Bids to the location set forth in the Bid Specifications prior to the stated Bid opening date/time. A Bid return envelope, if provided with the Bid Specifications, should be used with the Bid sealed inside. If the Bid response does not fit into the envelope, the Bid envelope should be attached to the outside of the sealed box or package with the Bid inside. If using a commercial delivery company that requires use of their shipping package or envelope, Bidder’s sealed Bid, labeled as detailed below, should be placed within the shipper’s sealed envelope to ensure that the Bid is not prematurely opened. All Bids must have a label on the outside of the package or shipping container outlining the following information: “BID ENCLOSED (bold print, all capitals) • Group Number • IFB or RFP Number • Bid Submission date and time” In the event that a Bidder fails to provide such information on the return Bid envelope or shipping material, the receiving entity reserves the right to open the shipping package or envelope to determine the proper Bid number or Product group, and the date and time of Bid opening. Bidder shall have no claim against the receiving entity arising from such opening and such opening shall not affect the validity of the Bid or the procurement. Notwithstanding the receiving agency’s right to open a Bid to ascertain the foregoing information, Bidder assumes all risk of late delivery associated with the Bid not being identified, packaged or labeled in accordance with the foregoing requirements. All Bids must be signed by a person authorized to commit the Bidder to the terms of the Bid Documents and the content of the Bid (offer).

  • Invoice Submission All invoices submitted by Contractor shall include the City Contract Number, an assigned Invoice Number, and an Invoice Date. City will provide Contractor with an invoice cover sheet. Invoice cover sheets are required to be accurately completed and submitted with each invoice. Contractor shall submit the original invoice, no more than once monthly, through the responsible City Project Manager at: City of Ocala Engineering Department, Attn: ▇▇▇▇ ▇▇▇▇▇▇▇▇, Address: ▇▇▇▇ ▇▇ ▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇. ▇▇▇, ▇▇▇▇▇, ▇▇▇▇▇▇▇ ▇▇▇▇▇, E-Mail: ▇▇▇▇▇▇▇▇▇@▇▇▇▇▇▇▇.▇▇▇.