Romanian Regulatory Emergency Response Centre Sample Clauses

Romanian Regulatory Emergency Response Centre. This project aims at technical consolidation of the emergency preparedness capabilities of the Romanian National Commission for Nuclear Activities Control (CNCAN). The project comprises two componentts: one providing assistance in the form of services, one, supplies. The services’ component covers Identification and assessment of the level of equipment endowment for the emergency response centre training of staff and production of training materials for those nominated to operate the centre establishing a strategy for developing TSO support to the response centre, this covers both the future activity of the CNCAN TSO and other Romanian TSOs. The supplies component covers physical endowment of the Centre with basic hardware as identified in the first part of tehis project and the appropriate software to commission the installation, as well as the requisite communication links, e.g. high speed Internet links and connections to the governmental data transmission networks.

Related to Romanian Regulatory Emergency Response Centre

  • Emergency Response Partners must develop, maintain, and carry out a response plan for public water system emergencies, including disease outbreaks, spills, operational failures, and water system contamination. Partners must notify DWS in a timely manner of emergencies that may affect drinking water supplies.

  • Primary Frequency Response Developer shall ensure the primary frequency response capability of its Large Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls. The term “functioning governor or equivalent controls” as used herein shall mean the required hardware and/or software that provides frequency responsive real power control with the ability to sense changes in system frequency and autonomously adjust the Large Generating Facility’s real power output in accordance with the droop and deadband parameters and in the direction needed to correct frequency deviations. Developer is required to install a governor or equivalent controls with the capability of operating: (1) with a maximum 5 percent droop ± 0.036 Hz deadband; or (2) in accordance with the relevant droop, deadband, and timely and sustained response settings from an approved Applicable Reliability Standard providing for equivalent or more stringent parameters. The droop characteristic shall be: (1) based on the nameplate capacity of the Large Generating Facility, and shall be linear in the range of frequencies between 59 and 61 Hz that are outside of the deadband parameter; or (2) based on an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. The deadband parameter shall be: the range of frequencies above and below nominal (60 Hz) in which the governor or equivalent controls is not expected to adjust the Large Generating Facility’s real power output in response to frequency deviations. The deadband shall be implemented: (1) without a step to the droop curve, that is, once the frequency deviation exceeds the deadband parameter, the expected change in the Large Generating Facility’s real power output in response to frequency deviations shall start from zero and then increase (for under-frequency deviations) or decrease (for over-frequency deviations) linearly in proportion to the magnitude of the frequency deviation; or (2) in accordance with an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. Developer shall notify NYISO that the primary frequency response capability of the Large Generating Facility has been tested and confirmed during commissioning. Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement. The primary frequency response requirements contained herein shall apply to both synchronous and non-synchronous Large Generating Facilities.

  • Contingent Emergency Response 1. In order to ensure the proper implementation of contingent emergency response activities under Part 4 of the Project (“Contingent Emergency Response Part”), the Recipient shall ensure that: (a) a manual (“CERC Manual”) is prepared and adopted in form and substance acceptable to the Association, which shall set forth detailed implementation arrangements for the Contingent Emergency Response Part, including: (i) any structures or institutional arrangements for coordinating and implementing the Contingent Emergency Response Part;

  • Occupational Health and Safety Committee ‌ (a) The parties agree that a joint occupational health and safety committee will be established. The Committee shall govern itself in accordance with the provisions of the Occupational Health and Safety Regulations made pursuant to the Workers Compensation Act. The Committee shall be between the Employer and the Union, with equal representation, and with each party appointing its own representatives. The Union agrees to actively pursue with the other Health Care unions, where more than one union is certified with the Employer, a joint union/employer committee for the purposes of the Occupational Health and Safety Regulations. (b) Employees who are members of the Committee shall be granted leave without loss of pay or receive straight-time regular wages while attending meetings of the Joint Committee. Employees who are members of the Committee shall be granted leave without loss of pay or receive straight-time regular wages to participate in joint workplace inspections and joint accident investigations at the request of the Committee pursuant to the WCB Occupational Health and Safety Regulations. Committee meetings, workplace inspections and accident investigations shall be scheduled during normal working hours whenever practicable. (c) The Occupational Health and Safety Committee shall have as part of its mandate the jurisdiction to receive complaints or concerns regarding workload problems which are safety-related, the right to investigate such complaints, the right to define the problem and the right to make recommendations for a solution. Where the Committee determines that a safety-related workload problem exists, it shall inform the Employer. Within 21 days thereafter, the Employer shall advise the Committee what steps it has taken or proposes to take to rectify the safety-related workload problem identified by the Committee. If the Union is not satisfied with the Employer's response, it may refer the matter to the Industry Trouble shooter for a written recommendation. (d) No employee shall be disciplined for refusal to work when excused by the provisions of the

  • How to File an Appeal of a Prescription Drug Denial For denials of a prescription drug claim based on our determination that the service was not medically necessary or appropriate, or that the service was experimental or investigational, you may request an appeal without first submitting a request for reconsideration. You or your physician may file a written or verbal prescription drug appeal with our pharmacy benefits manager (PBM). The prescription drug appeal must be submitted to us within one hundred and eighty (180) calendar days of the initial determination letter. You will receive written notification of our determination within thirty (30) calendar days from the receipt of your appeal. Your appeal may require immediate action if a delay in treatment could seriously jeopardize your health or your ability to regain maximum function, or would cause you severe pain. To request an expedited appeal of a denial related to services that have not yet been rendered (a preauthorization review) or for on-going services (a concurrent review), you or your healthcare provider should call: • our Grievance and Appeals Unit; or • our pharmacy benefits manager for a prescription drug appeal. Please see Section 9 for contact information. You will be notified of our decision no later than seventy-two (72) hours after our receipt of the request. You may not request an expedited review of covered healthcare services already received.