Safe Loading Sample Clauses

Safe Loading. The Customer warrants that no Motor Vehicle will be laden in excess of the Motor Vehicle's gross vehicle mass at any time during the Hire Period.
Safe Loading. The Renter must safely secure all Equipment (or items loaded in or on the Equipment) to any vehicle transporting or loaded with the Equipment.
Safe Loading. (a) (b) (c) The owner-driver will ensure the safe and proper loading of their vehicle, including the securing and appropriate weather protection of the load. The owner-driver shall abide by the guidelines and performance standards for the safe carriage of loads on road vehicles as set out in the NTC’s Load Restraint Guide 2018, unless required by the hirer to abide by a higher standard. The owner-driver is responsible, so far as is practicable, for checking that the loading of pre-loaded vehicles is safe and satisfactory.
Safe Loading a) The Contractor will ensure the safe and proper loading of their vehicle, including the securing and appropriate weather protection of the load. b) The Contractor is responsible so far as is practicable for checking that the loading of pre- loaded vehicles is safe and satisfactory.
Safe Loading. Ensure procedures for forklift operation, manual handling and stacking requirements meet Company policies and standards.
Safe Loading. (i) Customer will safely secure all Equipment (or items loaded in or on the Equipment) loaded in or on the Customer’s vehicle; and (ii) any specifications, dimensions or weights of the Equipment provided by the Owner are indicative in nature only and may not be specific to the actual Equipment delivered to the Customer. The Customer is responsible for ensuring that any machines used to lift the Equipment, or any surfaces where the Equipment is placed, can tolerate the specification, weight and dimensions of the Equipment. The Customer indemnifies the Owner for any loss or damage that may occur from a failure to comply with this sub-clause.

Related to Safe Loading

  • Loading After the receipt of the NOR pursuant to section 9.7, the Seller, having regard to the requirements of the Loading Terminal, Loading Terminal procedures and the time when the vessel has complied with the provisions of section 9.7.a, shall commence loading as soon as reasonably practicable.

  • Leave Loading The employer and the individual employee must have genuinely made the agreement without coercion or duress.

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for: (a) acquiring and providing Right of Way on the Site in accordance with the alignment finalised by the Authority, free from all encroachments and encumbrances, and free access thereto for the execution of this Agreement; and (b) obtaining licences and permits for environment clearance for the Project Highway.

  • Crane Erection & Jumping (a) Cranes and man/material hoists may be erected, altered, climbed and dismantled during times when ordinary production works are in progress subject to the work being done in full compliance with a relevant operational safety zone (OSZ) plan which has been developed specifically for that operation with consideration to overall site safety. (b) The crane crew for each tower crane (Crane Crew) must consist of the following: (i) crane driver; and (ii) three (3) dogmen. (c) In addition to the appropriate tickets held by the crane driver and the dogmen, the following high risk licences must be held amongst the Crane Crew: (i) rigging; and (ii) material handling. (d) Where a Project consists of a single Crane Crew, the Employer should endeavour to ensure another member of the Crane Crew holds a crane driver licence.

  • Storage The ordering agency is responsible for storage if the contractor delivers within the time required and the agency cannot accept delivery.