Common use of SAFETY PRACTICES Clause in Contracts

SAFETY PRACTICES. 1. The City acknowledges that for health and safety reasons, the Public Utilities Commission staffs Hetch Hetchy Moccasin line shop line crew and Warnerville Line Shop line crew with three (3) employees; however, on occasion, subject to operational needs of the Department, the crew size may be less than this number. 2. A minimum of two (2) employees shall be assigned to any work requiring entrance into an underground vault (applicable to the Department of Technology, Public Safety Wire Section). 3. A minimum of two (2) electricians or above shall be assigned for work on all live circuits of 277 volts or greater. (Applicable to: Port of San Francisco, S.F. Airport, Electric Shop (Airfield and Building Maintenance), Department of Public Works, and Public Utilities Commission (Wastewater Enterprise, Water Department and Hetch Hetchy Moccasin, Line, Tech Shop, Electric, and Warnerville Line Shop). 4. Class 7510 light fixture maintenance worker need not be accompanied by a second 7510 in the performance fixture maintenance work within the classification. 5. Upon request, an employee shall be accompanied by a Deputy Sheriff when working in any jail. 6. At the Department of Public Works, Bureau of Building Repair and/or Public Utilities Commission, employees assigned to the Wastewater Enterprise Division shall be provided with a shower room, one (1) annual physical exam at no charge, free vaccines for hepatitis, T.B. and/or any other necessary vaccines required for exposure to raw sewage. 7. The City acknowledges for health and safety reasons, PUC staffs the Primary Control Center with three (3) employees, however, on occasion, subject to the operational needs of the department, the crew size may be less than this number. 8. The City will provide Powerhouse Operators with North American Electric Reliability Corporation (NERC) required continuing education hours necessary to maintain current certifications with such training to take place during the 11-hour day shifts. 9. If the City assigns any Powerhouse Operators to work at Early Intake, it shall assign at least two (2) Powerhouse Operators to work there on five (5) consecutive 8-hour day shifts, Monday through Friday, as set forth in Section C.2 above, however, on occasion, and subject to the operational needs of the Department, the City may staff Early Intake with one (1) Powerhouse Operator for a period not to exceed five (5) consecutive weekdays. No Powerhouse Operator shall be assigned to work alone at Early Intake on a Saturday or a Sunday without another City employee present. 10. Powerhouse Operators on the Schedule I Cycle are eligible for overtime, at one-and- one-half the base hourly rate, after they have worked more than forty (40) hours in a normal work week, or more than 12 hours in one day. Powerhouse Operators on the Schedule II Cycle are eligible for overtime, at one-and-one-half the base hourly rate, after they have worked more than forty (40) hours in a normal work week, or more than 10 hours in one day. Powerhouse Operators assigned to work at Early Intake on the Schedule III Cycle are eligible for overtime, at one-and-one-half the base hourly rate, after they have worked more than forty (40) hours in a normal work week, or more than 8 hours in one day.

Appears in 3 contracts

Sources: Collective Bargaining Agreement, Collective Bargaining Agreement, Collective Bargaining Agreement

SAFETY PRACTICES. 1. The City acknowledges that for health and safety reasons, the Public Utilities Commission staffs Hetch Hetchy Moccasin line shop line crew and Warnerville Line Shop line crew with three (3) employees; however, on occasion, subject to operational needs of the Department, the crew size may be less than this number. 2. A minimum of two (2) employees shall be assigned to any work requiring entrance into an underground vault (applicable to the Department of Technology, Public Safety Wire Section). 3. A minimum of two (2) electricians or above shall be assigned for work on all live circuits of 277 volts or greater. (Applicable to: Port of San Francisco, S.F. Airport, Electric Shop (Airfield and Building Maintenance), Department of Public Works, and Public Utilities Commission (Wastewater Enterprise, Water Department and Hetch Hetchy Moccasin, Line, Tech Shop, Electric, and Warnerville Line Shop). 4. Class 7510 light fixture maintenance worker need not be accompanied by a second 7510 in the performance fixture maintenance work within the classification. 5. Upon request, an employee shall be accompanied by a Deputy Sheriff when working in any jail. 6. At the Department of Public Works, Bureau of Building Repair and/or Public Utilities Commission, employees assigned to the Wastewater Enterprise Division shall be provided with a shower room, one (1) annual physical exam at no charge, free vaccines for hepatitis, T.B. and/or any other necessary vaccines required for exposure to raw sewage. 7. The City acknowledges for health and safety reasons, PUC staffs the Primary Moccasin Power house, which includes the Control Center Room with three (3) employees, however, on occasion, subject to the operational needs of the department, the crew size may be less than this number. 8. The City will provide Powerhouse Operators with on the Moccasin Schedule I Cycle shall be assigned at least one hundred (100) hours of North American Electric Reliability Corporation (NERC) required continuing education hours necessary to maintain current certifications training per year, with such training to take place during the 11-hour day shifts. Powerhouse Operators on the Moccasin Schedule I Cycle may be assigned NERC training during other shifts in addition to the one hundred (100) hours of NERC training assigned during the 11-hour day shifts. 9. If the City assigns any Powerhouse Operators to work at Early Intake, it shall assign at least two (2) Powerhouse Operators to work there on five (5) consecutive 8-hour day shifts, Monday through Friday, as set forth in Section C.2 above, however, on occasion, and subject to the operational needs of the Department, the City may staff Early Intake with one (1) Powerhouse Operator for a period not to exceed five (5) consecutive weekdays. No Powerhouse Operator shall be assigned to work alone at Early Intake on a Saturday or a Sunday without another City employee present. 10. Powerhouse Operators on the Moccasin Schedule I Cycle are eligible for overtime, at oneone- and-and- one-half the base hourly rate, after they have worked more than forty (40) hours in a normal work week, or more than 12 hours in one day. Powerhouse Operators on the Moccasin Schedule II Cycle are eligible for overtime, at one-and-one-half the base hourly rate, after they have worked more than forty (40) hours in a normal work week, or more than 10 hours in one day. Powerhouse Operators assigned to work at on the Early Intake powerhouses on the Schedule III Cycle are eligible for overtime, at one-and-one-half the base hourly rate, after they have worked more than forty (40) hours in a normal work week, or more than 8 hours in one day.

Appears in 2 contracts

Sources: Collective Bargaining Agreement, Collective Bargaining Agreement

SAFETY PRACTICES. 1. The City acknowledges that for health and safety reasons, the Public Utilities Commission staffs Hetch Hetchy Moccasin line shop line crew and Warnerville Line Shop line crew with three (3) employees; however, on occasion, subject to operational needs of the Department, the crew size may be less than this number. 2. A minimum of two (2) employees shall be assigned to any work requiring entrance into an underground vault (applicable to the Department of Technology, Public Safety Wire Section).Wire 3. A minimum of two (2) electricians or above shall be assigned for work on all live circuits of 277 volts or greater. (Applicable to: Port of San Francisco, S.F. Airport, Electric Shop (Airfield and Building Maintenance), Department of Public Works, and Public Utilities Commission (Wastewater Enterprise, Water Department and Hetch Hetchy Moccasin, Line, Tech Shop, Electric, and Warnerville Line Shop). 4. Class 7510 light fixture maintenance worker need not be accompanied by a second 7510 in the performance fixture maintenance work within the classification. 5. Upon request, an employee shall be accompanied by a Deputy Sheriff when working in any jail. 6. At the Department of Public Works, Bureau of Building Repair and/or Public Utilities Commission, employees assigned to the Wastewater Enterprise Division shall be provided with a shower room, one (1) annual physical exam at no charge, free vaccines for hepatitis, T.B. and/or any other necessary vaccines required for exposure to raw sewage. 7. The City cCity acknowledges for health Hhealth and safety ▇▇▇▇▇▇▇ reasons, PUC staffs the Primary Control Center Moccasin Power Hhouse, which includes theand Early Intake Division's powerhouse cControl rRoom, with three (3) employees, however, on occasion, subject to the operational needs of the department, the crew size may be less than this number. 8. The City will provide Powerhouse Operators with North American Electric Reliability Corporation (NERC) required continuing education hours necessary to maintain current certifications with such training to take place during the 11-hour day shifts. 9. If the City assigns any Powerhouse Operators to work at Early Intake, it shall assign at least two (2) Powerhouse Operators to work there on five (5) consecutive 8-hour day shifts, Monday through Friday, as set forth in Section C.2 above, however, on occasion, and subject to the operational needs of the Department, the City may staff Early Intake with one (1) Powerhouse Operator for a period not to exceed five (5) consecutive weekdays. No Powerhouse Operator shall be assigned to work alone at Early Intake on a Saturday or a Sunday without another City employee present. 10. Powerhouse Operators on the Schedule I Cycle are eligible for overtime, at one-and- one-half the base hourly rate, after they have worked more than forty (40) hours in a normal work week, or more than 12 hours in one day. Powerhouse Operators on the Schedule II Cycle are eligible for overtime, at one-and-one-half the base hourly rate, after they have worked more than forty (40) hours in a normal work week, or more than 10 hours in one day. Powerhouse Operators assigned to work at Early Intake on the Schedule III Cycle are eligible for overtime, at one-and-one-half the base hourly rate, after they have worked more than forty (40) hours in a normal work week, or more than 8 hours in one day.

Appears in 1 contract

Sources: Collective Bargaining Agreement

SAFETY PRACTICES. 1. The City acknowledges that for health and safety reasons, the Public Utilities Commission staffs Hetch Hetchy Moccasin line shop line crew and Warnerville Line Shop line crew with three (3) employees; however, on occasion, subject to operational needs of the Department, the crew size may be less than this number. 2. A minimum of two (2) employees shall be assigned to any work requiring entrance into an underground vault (applicable to the Department of Technology, Public Safety Wire Section). 3. A minimum of two (2) electricians or above shall be assigned for work on all live circuits of 277 volts or greater. (Applicable to: Port of San Francisco, S.F. Airport, Electric Shop (Airfield and Building Maintenance), Department of Public Works, and Public Utilities Commission (Wastewater Enterprise, Water Department and Hetch Hetchy Moccasin, Line, Tech Shop, Electric, and Warnerville Line Shop). 4. Class 7510 light fixture maintenance worker need not be accompanied by a second 7510 in the performance fixture maintenance work within the classification. 5. Upon request, an employee shall be accompanied by a Deputy Sheriff when working in any jail. 6. At the Department of Public Works, Bureau of Building Repair and/or Public Utilities Commission, employees assigned to the Wastewater Enterprise Division shall be provided with a shower room, one (1) annual physical exam at no charge, free vaccines for hepatitis, T.B. and/or any other necessary vaccines required for exposure to raw sewage. 7. The City acknowledges for health and safety reasons, PUC staffs the Primary Moccasin Power house, which includes the Control Center Room with three (3) employees, however, on occasion, subject to the operational needs of the department, the crew size may be less than this number. 8. The City will provide Powerhouse Operators with on the Moccasin Schedule I Cycle shall be assigned at least one hundred (100) hours of North American Electric Reliability Corporation (NERC) required continuing education hours necessary to maintain current certifications training per year, with such training to take place during the 11-hour day shifts. Powerhouse Operators on the Moccasin Schedule I Cycle may be assigned NERC training during other shifts in addition to the one hundred (100) hours of NERC training assigned during the 11-hour day shifts. 9. If the City assigns any Powerhouse Operators to work at Early Intake, it shall assign at least two (2) Powerhouse Operators to work there on five (5) consecutive 8-hour day shifts, Monday through Friday, as set forth in Section C.2 above, however, on occasion, and subject to the operational needs of the Department, the City may staff Early Intake with one (1) Powerhouse Operator for a period not to exceed five (5) consecutive weekdays. No Powerhouse Operator shall be assigned to work alone at Early Intake on a Saturday or a Sunday without another City employee present. 10. Powerhouse Operators on the Moccasin Schedule I Cycle are eligible for overtime, at one-and- and-one-half the base hourly rate, after they have worked more than forty (40) hours in a normal work week, or more than 12 hours in one day. Powerhouse Operators on the Moccasin Schedule II Cycle are eligible for overtime, at one-and-one-half the base hourly rate, after they have worked more than forty (40) hours in a normal work week, or more than 10 hours in one day. Powerhouse Operators assigned to work at on the Early Intake powerhouses on the Schedule III Cycle are eligible for overtime, at one-and-one-half the base hourly rate, after they have worked more than forty (40) hours in a normal work week, or more than 8 hours in one day.

Appears in 1 contract

Sources: Collective Bargaining Agreement