Schematic Diagrams Clause Samples

The Schematic Diagrams clause defines the requirements and responsibilities related to the creation, submission, and approval of schematic diagrams for a project. Typically, this clause specifies who must prepare the diagrams, the standards or formats to be followed, and the process for review and revision by the relevant parties. For example, it may require the contractor to provide electrical or plumbing schematics for approval before installation begins. The core function of this clause is to ensure that all parties have a clear and agreed-upon visual representation of the project's systems, reducing the risk of errors, misunderstandings, or costly changes during construction.
Schematic Diagrams. M/s COMPANY shall prepare single line schematic diagrams in respect of its system facility and make the same available to the GVCL and GETCO (State Transmission Utility) through which his system is connected and the State Load Despatch Centre.
Schematic Diagrams. M/s _ shall prepare single line schematic diagrams in respect of its system facility and make the same available to the UGVCL and 66KV GETCO (State Transmission Utility) through which his system is connected and the State Load Dispatch Centre.

Related to Schematic Diagrams

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Schematic Design Phase 1.2.1 Based on the mutually agreed upon Program of Requirements, Amount Available for the Construction Contract and the Project Schedule, the Architect/Engineer shall prepare sufficient alternative approaches utilizing BIM for design and construction of the Project to satisfy Owner’s project requirements and shall, at completion of this phase, submit Schematic Design Documents derived from the model in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review alternative approaches to design and construction for the Project as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by the Owner within the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Schematic Design. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.2.2 Architect/Engineer shall provide all services necessary to perform the services of this phase (preparation of model(s), relevant data, decision support model views and Schematic Design Documents) including, without limitation, unless otherwise approved by Owner, the preparation and prompt delivery of all items specified in the BIM Execution Plan and “Facility Design Guidelines”. 1.2.3 Architect/Engineer shall work closely with Owner in preparation of schematic drawings and shall specifically conform to Owner’s requirements regarding aesthetic design issues. 1.2.4 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.2.5 Before proceeding into the Design Development Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Schematic Design documents and approval of the Architect/Engineer’s preliminary Estimated Construction Cost and schedule. 1.2.6 The Architect/Engineer shall participate in a final review of the Schematic Design Documents and model(s) with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Schematic Design Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments, any of which may be appealed for good cause.

  • Specifications Where applicable, specifications for Goods and/or Services are detailed in this Contract and the Purchase Order. Unless otherwise specified in the Purchase Order, all Goods and/or Services provided shall be new and unused of the latest model or design.

  • Protocols Each party hereby agrees that the inclusion of additional protocols may be required to make this Agreement specific. All such protocols shall be negotiated, determined and agreed upon by both parties hereto.