Separate Generation and Load - Metering Option II. 1. The Qualifying Facility can choose to have the metering arranged so that Utility purchases 100% of the QF's generation output, and so that Utility sells 100% of the QF's load requirements. 2. The QF's generation and load shall be treated separately and independently. For example, if a cogeneration facility produces 50 KW and consumes 30 KW, it would be treated the same as another qualifying facility that produces 50 KW, and is located next to a factory that uses 30 KW. 3. The QF should note that the purchase meter will reverse its rotation if the generator loses power and goes into a motoring state. The Utility may require a reverse power relay to prevent this condition.