Common use of Sequence of Operations Clause in Contracts

Sequence of Operations. Any Sequence of Operations provided in this Contract in conjunction with any staging details which may be shown in the plans, is a suggested sequence for performing the Work. It is intended as a general staging plan for the orderly execution of the work while minimizing the impact on pedestrian facilities, mainline, cross-streets and side streets. The Contractor shall develop detailed staging and temporary traffic control plans for performing specific areas of the Work including but not limited to all traffic shifts, detours, bridge widenings, paces, or other activities that disrupt traffic or pedestrian flow. The Engineer may require detailed staging and TTC plans for lane closures or disruption to pedestrian facilities. These plans shall be submitted for approval at least two weeks prior to the scheduled date of the activity. Activities that have not been approved at least seven (7) days prior to the scheduled date shall be rescheduled. Where traffic is permitted through the work area under stage construction, the Contractor may choose to construct, at no additional expense to the Department, temporary on-site bypasses or detours in order to expedite the work. Plans for such temporary bypasses or detours shall be submitted to the Engineer for review and approval 30 calendar days prior to the proposed construction. Such bypasses or detours shall be removed promptly when in the opinion of the Engineer; they are no longer necessary for the satisfactory progress of the Work. Bypasses and detours shall meet the minimum requirements of Subsection 150.02.B.4. As an option to the Sequence of Operations in the Contract, the Contractor may submit an alternative Sequence of Operations for review and approval. Alternate Sequence of Operations for pedestrian facilities shall be in compliance with the most current edition of the MUTCD and ADA. Pedestrian needs identified in the preconstruction phase shall be included in the proposed alternate plan. The Department will not pay, or in any way reimburse the Contractor for claims arising from the Contractor’s inability to perform the Work in accordance with the Sequence of Operations provided in the Contract or from an approved Contractor alternate. The Contractor shall secure the Engineer’s approval of the Contractor’s proposed plan of operation, sequence of work and methods of providing for the safe passage of vehicular and pedestrian traffic before it is placed in operation. The proposed plan of operation shall supplement the approved traffic control plan. Any major changes to the approved TTC plan, proposed by the Contractor, shall be submitted to the Department for approval. Some additional traffic control details will be required prior to any major shifts or changes in traffic. The traffic control details shall include, but not be limited to, the following: 1. A detailed drawing showing traffic locations and laneage for each step of the change. 2. The location, size, and message of all signs required by the most current edition of the MUTCD, Plan, Special Provisions, and other signs as required to fit conditions. Any portable changeable message signs used shall be included in the details. 3. The method to be used in, and the limits of, the obliteration of conflicting lines and markings. 4. Type, location, and extent of new lines and markings. 5. Horizontal and vertical alignment and superelevation rates for detours, including cross- section and profile grades along each edge of existing pavement. 6. Drainage details for temporary and permanent alignments. 7. Location, length, and/or spacing of channelization and protective devices (temporary barrier, guardrail, barricades, etc.) 8. Starting time, duration and date of planned change.

Appears in 1 contract

Sources: Special Provisions

Sequence of Operations. Any Sequence of Operations provided in this Contract in conjunction with any staging details which may be shown in the plans, is a suggested sequence for performing the Work. It is intended as a general staging plan for the orderly execution of the work while minimizing the impact on pedestrian facilities, mainline, cross-streets and side streets. The Contractor shall develop detailed staging and temporary traffic control plans for performing specific areas of the Work including but not limited to all traffic shifts, detours, bridge widenings, paces, or other activities that disrupt traffic or pedestrian flow. The Engineer may require detailed staging and TTC plans for lane closures or disruption to pedestrian facilities. These plans shall be submitted for approval at least two weeks prior to the scheduled date of the activity. Activities that have not been approved at least seven (7) days prior to the scheduled date shall be rescheduled. Where traffic is permitted through the work area under stage construction, the Contractor may choose to construct, at no additional expense to the Department, temporary on-site bypasses or detours in order to expedite the work. Plans for such temporary bypasses or detours shall be submitted to the Engineer for review and approval 30 calendar days prior to the proposed construction. Such bypasses or detours shall be removed promptly when in the opinion of the Engineer; they are no not longer necessary for the satisfactory progress of the Work. Bypasses and detours shall meet the minimum requirements of Subsection 150.02.B.4. As an option to the Sequence of Operations in the Contract, the Contractor may submit an alternative Sequence of Operations for review and approval. Alternate Sequence of Operations for pedestrian facilities shall be in compliance with the most current edition of the MUTCD and ADA. Pedestrian needs identified in the preconstruction phase shall be included in the proposed alternate plan. The Department will not pay, or in any way reimburse the Contractor for claims arising from the Contractor’s inability to perform the Work in accordance with the Sequence of Operations provided in the Contract or from an approved Contractor alternate. The Contractor shall secure the Engineer’s approval of the Contractor’s proposed plan of operation, sequence of work and methods of providing for the safe passage of vehicular and pedestrian traffic before it is placed in operation. The proposed plan of operation shall supplement the approved traffic control plan. Any major changes to the approved TTC plan, proposed by the Contractor, shall be submitted to the Department for approval. Some additional traffic control details will be required prior to any major shifts or changes in traffic. The traffic control details shall include, but not be limited to, the following: 1. A detailed drawing showing traffic locations and laneage for each step of the change. 2. The location, size, and message of all signs required by the most current edition of the MUTCD, Plan, Special Provisions, and other signs as required to fit conditions. Any portable changeable message signs used shall be included in the details. 3. The method to be used in, and the limits of, the obliteration of conflicting lines and markings. 4. Type, location, and extent of new lines and markings. 5. Horizontal and vertical alignment and superelevation rates for detours, including cross- section and profile grades along each edge of existing pavement. 6. Drainage details for temporary and permanent alignments. 7. Location, length, and/or spacing of channelization and protective devices (temporary barrier, guardrail, barricades, etc.) 8. Starting time, duration and date of planned change.

Appears in 1 contract

Sources: Gdot Shelf and Special Provisions