Common use of Service Connections Clause in Contracts

Service Connections. 15.01 No service connection or meter vault may be constructed or connected to the waterworks system until a permit for such construction or connection has been obtained from PURVEYOR. 15.02 Before a permit for a service connection is issued by PURVEYOR, the applicant requesting same shall: (1) submit a plan with the location and desired size of the proposed connection and submit all other information requested by PURVEYOR or PURVEYOR’S application form; (2) make satisfactory arrangements with MUNICIPALITY for any necessary openings in the street or public highway, excavating trenches, disposal of excavating material, backfilling trenches, placing temporary wearing surface, maintenance of surface in advance of permanent replacement of roadway, sidewalks, or driveways, including the erection and maintenance of lights, signs and barricades without expense to PURVEYOR; and (3) submit a release relieving PURVEYOR of all responsibility and liability that may arise from the performance of any work by applicant or his contractor or from any damages which occur due to improperly installed service connections. 15.03 Only distribution mains within the corporate limits of MUNICIPALITY shall be tapped for the purpose of making service connections for the general supply of water to any premises within the corporate limits of MUNICIPALITY. 15.04 A service connection to a water main shall be permitted only if the water main extends across the full length of frontage of the premises to receive water service from the service connection. Service connections shall be permitted only to premises which abut a street in which a distribution main is situated or where an easement for water supply purposes extends from the premises to a street in which a distribution main is located. 15.05 A single service connection shall supply no more than one building. In multi-unit buildings, such as are located in shopping centers, or such other structures where units within that structure may be sold individually, the Commissioner shall determine the number of service connections necessary to adequately provide service to the building. 15.06 All service connections to any main located in a street or other public way or place shall be installed by PURVEYOR at the expense of the party ordering the service. The service line shall be installed by PURVEYOR up to a point approximately two feet (2’) back of the curb line or edge of pavement. Such installations shall include all stop cocks and valves. The extension of a service connection from the stop cock box or valve at or near the curb pipe shall be installed by and at the expense of the Direct Service Customer. The service pipe and connections shall be of a type approved by the Commissioner. The pipe and connection must be left uncovered in the trench or at all points where fittings are located to afford PURVEYOR an opportunity to test and inspect at PURVEYOR’S expense. The water shall not be turned on until the pipe and connections have been inspected and approved by PURVEYOR. 15.07 MUNICIPALITY shall provide PURVEYOR with all building permits issued for each month and a list of occupancy permits or equivalent documents issued by MUNICIPALITY within ten (10) days of issuance. MUNICIPALITY agrees that its officers vested with authority to issue building permits will, before issuing any permit for construction work which will require the use of water, first require the applicant to furnish a certificate secured from PURVEYOR stating that the rules and regulations of the Division of Water have been complied with, and that arrangements have been made with the Division of Water for use of water and for payment of all water used.

Appears in 2 contracts

Sources: Water Service Agreement, Water Service Agreement

Service Connections. 15.01 No a) The Owner shall not commence any work on the construction of sanitary sewers, storm sewers, or water mains until receipt by the Township of the appropriate Environmental Compliance Approvals from the Ministry of the Environment, Conservation and Parks nor shall any work commence on the construction of sanitary services or storm sewers until it has received notice in writing from the Township to do so. b) The Owner shall construct and install at its own expense, sanitary sewers, storm sewers, water mains and private services with all required appurtenances on all the roads mentioned in said Schedules “E” and “H” in accordance with the plans and specifications prepared by or caused to be prepared by the Owner, according to the standards set up by the Township; a copy of design and plans shall be submitted to the Township for approval. Following approval of design and plans by the Township, an application will be filed by the Owner to the Ministry of the Environment. c) Where the Owner is required under this Agreement to provide and install sanitary, watermain, and/or storm sewers of a diameter larger and/or at a greater depth than would be required to service connection or meter vault the area to be developed, as detailed in the approved Plans of this Agreement, the Owner shall convey to the Township such 0.3 metre reserves as may be constructed or connected necessary to prevent the owners and developers of adjacent lands from making connection to the waterworks system until a permit for such construction or connection has been obtained from PURVEYORsaid sewers and/or watermain installed by the Owner. Insofar as it legally may, the Township will require other persons connecting to the sewers and/or watermain to pay an equitable share of the cost thereof to the Owner, the amount of which payment shall be determined by the Township Engineer. 15.02 Before a permit for a service connection is issued by PURVEYORd) The Owner shall at its own expense, the applicant requesting same shall: (1) submit a plan with the location and desired size of the proposed connection and submit clean all other information requested by PURVEYOR or PURVEYOR’S application form; (2) make satisfactory arrangements with MUNICIPALITY for any necessary openings in the street or public highway, excavating trenches, disposal of excavating material, backfilling trenches, placing temporary wearing surface, maintenance of surface in advance of permanent replacement of roadway, sidewalks, or driveways, including the erection and maintenance of lights, signs and barricades without expense to PURVEYOR; and (3) submit a release relieving PURVEYOR of all responsibility and liability that may arise foreign material from the performance of any work by applicant or his contractor or from any damages which occur due sanitary and storm sewer system with a high-pressure water unit, shall pay to improperly installed service connections. 15.03 Only distribution mains within the corporate limits of MUNICIPALITY shall be tapped for the purpose of making service connections for the general supply of water to any premises within the corporate limits of MUNICIPALITY. 15.04 A service connection to a water main shall be permitted only if the water main extends across the full length of frontage of the premises to receive water service from the service connection. Service connections shall be permitted only to premises which abut a street in which a distribution main is situated or where have an easement for water supply purposes extends from the premises to a street in which a distribution main is located. 15.05 A single service connection shall supply no more than one building. In multi-unit buildingsindependent inspection firm, such as are located in shopping centers, or such other structures where units within that structure may be sold individually, the Commissioner shall determine the number of service connections necessary to adequately provide service to the building. 15.06 All service connections to any main located in a street or other public way or place shall be installed by PURVEYOR at the expense of the party ordering the service. The service line shall be installed by PURVEYOR up to a point approximately two feet (2’) back of the curb line or edge of pavement. Such installations shall include all stop cocks and valves. The extension of a service connection from the stop cock box or valve at or near the curb pipe shall be installed by and at the expense of the Direct Service Customer. The service pipe and connections shall be of a type approved by the CommissionerTownship, pass a closed T.V. circuit in all sewer pipes and pay to have all pipes repaired or replaced to the satisfaction of the Township if found defective. The pipe and connection must One copy of report of inspection results to be left uncovered given to the Township by an independent inspection firm. All lateral connections to be shown with respective distances in the trench or at all points where fittings are located to afford PURVEYOR an opportunity to test and inspect at PURVEYOR’S expense. The water shall not be turned on until the pipe and connections have been inspected and approved by PURVEYORreport. 15.07 MUNICIPALITY e) The installation of water mains shall provide PURVEYOR with all building permits issued for each month be as set out in Schedules “E” and a list of occupancy permits or equivalent documents issued by MUNICIPALITY within ten (10) days of issuance“H” hereto. MUNICIPALITY agrees that its officers vested with authority Installation shall conform to issue building permits will, before issuing any permit for construction work which will require the use of water, first require the applicant to furnish a certificate secured from PURVEYOR stating that the rules and regulations requirements of the Division Ministry of Water have been complied with, the Environment. f) The installation of storm sewers and that arrangements have been made with the Division of Water for use of water sanitary sewer shall be as set out in Schedules “E” and for payment of all water used“H” hereto.

Appears in 1 contract

Sources: Subdivision Agreement