The 'Setting Out the Works' clause defines the process and responsibilities for establishing the precise physical location and dimensions of the construction project on site. Typically, this clause requires the contractor to use provided drawings and reference points to accurately mark out the boundaries and key features before work begins, and may specify procedures for verifying measurements or addressing discrepancies. Its core function is to ensure that the works are constructed in the correct position, thereby preventing costly errors, disputes, or delays arising from misplacement or misinterpretation of site boundaries.
POPULAR SAMPLE Copied 2 times
Setting out the Works. The Contractor shall be responsible for the true and proper setting out of the works about original points, lines, and levels of reference given by the Engineer in writing or shown on the Drawings and for correctness, subject as above mentioned in the position, levels, dimensions and alignment of all parts of the works and for the provision of all necessary instruments, appliances, and labor in connection therewith.
Setting out the Works. The contractor shall provide all assistance and adhere to the instruction of E.I.C during the course of surveying, inspection, etc.
Setting out the Works. The Contractor shall set out the works and be responsible for the accuracy of such setting out as provided in the General Conditions of Contract, at his expense. The Contractor shall provide a suitably qualified and experienced licensed surveyor to set out and check the work during construction and to supply an accurate record of the locations and levels of all works as constructed. The Contractor shall arrange for the licensed surveyor to survey the site and verify the accuracy of the existing survey details. Should the Contractor discover any error or discrepancy in the lines of levels, or the plans, or the site, he shall immediately notify the Superintendent before proceeding with the work. The cost of re-pegging or additional survey as a result of discrepancies or error made by the Contractor shall also be paid for by the Contractor. A series of temporary benchmarks shall be pegged by the Principal's surveyor prior to the commencement of works. Any re-pegging for any reasons whatsoever that is required by the Contractor during the period of the Contract shall be undertaken by the Principal's surveyor or by a licensed surveyor approved in writing by the Superintendent and the costs so incurred by these works shall be wholly met by the Contractor. The costs associated with any title survey re-establishment, which was brought about by the Contractor's negligence or failure to take adequate precautions, shall be met by the Contractor. The Contractor shall also supply and maintain on the works approved straight edges, levels, templates, ranging rods, survey tapes and other equipment and instruments to enable Contractor personnel to set out the work accurately and those instruments and templates in particular shall be used throughout as the work proceeds. The Contractor shall see that the work is accurately done in all respects by the use of such templates and other instruments and shall correct any errors or inaccuracies before other work is done. The Contractor shall, when required by the Superintendent or his representative, either personally or by his representative test the accuracy of the work and if necessary, retest the same when any adjustments have been made. The Contractor shall take adequate precautions to protect all survey pegs and marks and shall not disturb any such without prior consent of the Superintendent. The benchmarks to be used for the setting out of levels shall be as indicated on the drawings. The work of additional setting out shal...
Setting out the Works. Unless otherwise agreed between the parties, the Contractor shall set out the Works in compliance with sub-clause 7.7 (Setting Out the Works) of the Main Contract.
Setting out the Works. The Contractor shall be responsible for setting out all required works. The Contract Administrator shall, either by dimensioned drawings or written instructions, give the Contractor the necessary information to enable him to set out the works. The Contract Administrator shall approve such setting out prior to works proceeding, after which any inaccuracies shall be amended by the Contractor at his own cost.
Setting out the Works. Unless otherwise agreed between the parties, the NN Sub-Contractor will set out the Sub- Contract Works in compliance with clause 7.7 (“Setting Out the Works”) of the Main Contract.
Setting out the Works. ‌ 13.1. Before commencing work on the Site the Contractor shall engage a licensed surveyor to identify the Site, certify all boundaries and position necessary survey marker pegs, so that the set out of the Works is wholly within the titled boundary except for items for which approval has otherwise been given by proper authorities. 13.2. The Contractor will immediately report any discrepancies between the Contract Documents and the survey to the Superintendent and must not proceed until further direction from the Superintendent. 13.3. The Contractor shall set out the Works at levels and alignments as shown in the Contract Documents or such alternative levels and alignment as may be notified to the Contractor by the Superintendent. 13.4. Unless the Superintendent otherwise directs, the Contractor at his own expense shall rectify any error in setting out the Works which is attributable to the Contractor, or its servants or agents.
Setting out the Works. The Engineer shall supply dimensioned drawings, levels and other information necessary to enable the contractor to set out the works. The contractor shall provide all setting out apparatus at his own cost, together with any reasonable numbers of labourers that may be required, and set out the works and be responsible for the accuracy of the same. The contractor shall amend at his own cost and to the satisfaction of the Engineer any error found at any stage which may arise through inaccurate setting out unless such error is based on incorrect data furnished in writing by the Engineer, in which case the cost of rectification shall be borne by the NRDA. The contractor shall protect and preserve all bench marks used in setting out the works till the end of Defects Liability period unless the Engineer directs its early removal. The contractor should also keep all setting out apparatus in good working condition throughout the period of construction work on site.
Setting out the Works 

Related to Setting out the Works

  • Opting Out 6.1 The Opt-Out Deadline has Expired (1) The deadline to opt-out of the Proceedings expired on October 24, 2018, pursuant to Orders of the Ontario, BC and Québec Courts.

  • Working Out of Class Section 1 Whenever an employee is requested to perform the tasks of a higher graded position, that employee shall receive the rate of pay of that higher graded position, or five percent (5%) above his/her regular rate of pay, if the rate of pay for the higher graded position is less than five percent (5%) over and above that employee's regular rate of pay and his/her regular position, whichever is greater, for each and every hour worked in any higher grade during that contract year. Section 2 An employee temporarily assigned to a lower graded position shall be compensated at the rate of pay received in his/her regularly assigned job grade.

  • Working Out of Classification Whenever an employee is assigned the principal duties and responsibilities of an employee in a higher classification for a single shift or greater period of time, that employee shall be paid a minimum of three (3) steps above their present salary, or shall receive the salary at the bottom of the range for the classification which they are working in, whichever is greater, for all such time worked.

  • CONTRACTING OUT The Employer agrees not to contract out any work presently performed by employees covered by this Agreement which would result in the laying off of such employees.

  • Moving Out a. Each Resident must remove all personal belongings from their room when the Occupancy period ends or this Contract is terminated. The room must be cleaned and notice made to REH staff for move out to be complete. Remaining personal items will be considered abandoned and will be sent to OSU Surplus for public auction or disposal. Residents will be charged for housing and dining until they have completed the entire move out process. More information about this process is available on our website: ▇▇▇▇▇://▇▇▇▇▇▇▇▇▇▇▇.▇▇▇/uhds/rates-policies/moving-out b. During move out, Residents may be present for an initial staff inspection of the final room condition; however, the initial inspection is informational in nature and is not the final determination of room condition. All rooms are inspected after the Resident vacates the room and this inspection may result in damage charges, regardless of whether the Resident is present at the time of inspection. c. The Resident agrees to pay for the cost of extra custodial service to remove personal belongings or to clean the room after the Resident has vacated. The Resident agrees that the University may determine these charges in its sole discretion and the University will calculate the charges to reasonably compensate for any damages based on its Common Residence Hall Charges Sheet, located at ▇▇▇▇▇://▇▇▇▇▇▇▇▇▇▇▇.▇▇▇/housing/rates-policies/room-dining-rates. d. Residents who do not intend to live on campus for Winter Term must vacate by 5:00 PM on December 10, 2021 and Residents who do not intend to live on campus for Spring Term must vacate by 5:00 PM on March 18, 2022. If a Resident fails to do this, they are subject to a $350 Extended Occupancy fee. e. Failure to vacate by the time and date required may result in charges calculated to reasonably compensate the University for damage incurred by the delay, in addition to prorated Room and Dining charges, unless the Resident withdraws from OSU- Cascades after the times and dates listed in Section 16(d). The Resident agrees to pay these term charges, available on the REH website: ▇▇▇▇▇://▇▇▇▇▇▇▇▇▇▇▇.▇▇▇/housing/rates-policies/room-dining-rates. f. If a Resident withdraws from OSU-Cascades and moves their belongings out, but has not completed the move out process, REH reserves the right to reassign the room to another resident. A failure to complete the move out process may result in University determined charges to reasonably compensate the University for damages as set forth in the Common Residence Hall Charges Schedule, located at ▇▇▇▇▇://▇▇▇▇▇▇▇▇▇▇▇.▇▇▇/housing/rates-policies/room-dining-rates.