Site Maps Sample Clauses

Site Maps. Contractor shall: • Develop a site map with existing conditions, including survey information provided by County, site features, recreation programing, circulation, vegetation, slope analysis, wetlands, views, surrounding land use and hydrology. Integrate known County information into site map.
Site Maps. The Lessor shall have received site maps of the Unimproved Land prepared to reflect the anticipated location of the New Improvements (Fremont 3E) thereon, which shall be in form and substance reasonably satisfactory to the Lessor.
Site Maps. Within sixty (60) days of the date date upon which the District Court enters the Order dismissing Baykeeper’s Complaint with prejudice and retaining jurisdiction to enforce the terms of this Agreement (“Effective Date”), to the extent not already implemented, CEMEX shall survey each of its Facilities and complete a topographic contour map (“Site Map”) that comprehensively depicts the flow of storm water at the Facilities. The Site Maps shall clearly denote the contour intervals, which for the Redwood City Facilities shall be at least one half foot or less referenced to the vertical control datum (NAVD 88) and for the San Francisco Facility shall be based on site design maps, and the direction of storm water flow. The Site Maps for the Redwood City Facilities shall also reference the Mean High Water level and the Mean Sea Level as calculated from NAVD. The Site Maps shall clearly identify the property boundaries, known or suspected drop inlets, ground type (pervious or impervious), berms, dikes, walls and all other structures controlling the flow of surface water or tidally influenced water and the elevation and materials they are comprised of, any permanent structures and features, and all other physical structures or items relevant under this Agreement. Baykeeper shall have fourteen
Site Maps. (All Application Packages):
Site Maps. One or more maps should be prepared that provide, at a minimum, the following information. Maps should be prepared so that all of the required information is clearly displayed and it is clear what BMPs will be installed in each major stage of construction, including the time between the cessation of active construction and final stabilization. Provide additional maps if necessary to clearly describe BMP timing and placement. The scale of the map(s) must be sufficient to identify the location of all items required below.

Related to Site Maps

  • Site Inspections Grantees must ensure by site inspections that facilities on the Project site are being operated and maintained for outdoor recreation for a minimum period of twenty-five (25) years from the Project Completion Date set forth in the Project Completion Certificate. The Project site must be open at reasonable times and must be managed in a safe and attractive manner.

  • Geotechnical Engineer « »« » « » « » « » « »

  • SITE INSPECTION Where a site inspection is required by the Bid Specifications or Project Definition, Bidder shall be required to inspect the site, including environmental or other conditions for pre-existing deficiencies that may affect the installed Product, equipment, or environment or services to be provided and, which may affect Bidder’s ability to properly deliver, install or otherwise provide the required Product. All inquiries regarding such conditions shall be made in writing. Bidder shall be deemed to have knowledge of any deficiencies or conditions which such inspection or inquiry might have disclosed. Bidder must provide a detailed explanation with its Bid if additional work is required under this clause in order to properly complete the delivery and installation of the required Product or provide the requested service.

  • Safety Inspection During inspection of County facilities conducted by the State Division of Occupational Safety and Health for the purpose of determining compliance with the California OSHA requirements, an OCEA designated employee shall be allowed to accompany the inspector while the inspector is in the employee's agency/department. The employee so designated shall suffer no loss of pay when this function is performed during the employee's regularly scheduled work hours.