Site Selection/Power Clause Samples

Site Selection/Power. GTE shall designate the space within its wire center and/or access tandem where US Dial Tone shall collocate its equipment. GTE shall provide, at the rates set forth in Appendix G described in Section 6.1, 48V DC power with generator and/or battery back-up, AC convenience outlet, heat, air conditioning and other environmental support to US Dial Tone’s equipment in the same standards and parameters required for GTE equipment within that wire center or access tandem. Standard 48V DC power shall be provided in 40 amp increments. GTE will be responsible for the installation of the AC convenience outlets, overhead lighting and equipment superstructure per the established rates.
Site Selection/Power. GTE shall designate the space within its wire center and/or access tandem where Pathnet shall collocate its equipment. GTE shall provide, at the rates set forth in Appendix G described in Section 6.1, 48V DC power with generator and/or battery back-up, AC convenience outlet, heat, air conditioning and other environmental support to Pathnet’s equipment in the same standards and parameters required for GTE equipment within that wire center or access tandem. Standard 48V DC power shall be provided in 40 amp increments. GTE will be responsible for the installation of the AC convenience outlets, overhead lighting and equipment superstructure per the established rates.
Site Selection/Power. GTE shall designate the space within its wire center and/or access tandem where GLOBALEYES shall collocate its equipment. GTE shall provide, at the rates set forth in Appendix G described in Section 6.1, 48V DC power with generator battery back-up, AC convenience outlet, heat, air conditioning and other environmental support to equipment in the same standards and parameters required for GTE equipment within that wire center or access tandem. Standard 46V DC power shall be provided in 40 amp increments. GTE will be responsible for the installation of the AC convenience outlets, overhead lighting and equipment superstructure per the established rates.
Site Selection/Power. GTE shall designate the space within its Wire Center and/or access tandem where Aero shall collocate its equipment. GTE shall provide, at the rates set forth in Appendix A described in Section 6.1, 48V DC power with generator and/or battery back-up, AC convenience outlet, heat, air conditioning and other environmental support to Aero’s equipment in the same standards and parameters required for GTE equipment within that Wire Center or access tandem. GTE will be responsible for the installation of the AC convenience outlets, overhead lighting and equipment superstructure per the established rates.
Site Selection/Power. Verizon shall designate the space within its Premise where SBCT shall collocate its equipment. Verizon will assign Collocation space to SBCT in a just, reasonable, and nondiscriminatory manner. Verizon will allow SBCT requesting caged or cageless Collocation to submit space preferences on the Application Form prior to assigning caged and cageless Collocation space to SBCT. Verizon will assign caged and cageless space in accordance with the following standards: (1) SBCT’s Collocation costs cannot be materially increased by the assignment; (2) SBCT’s occupation and use of Verizon’s Premises cannot be materially delayed by the assignment; (3) The assignment cannot impair the quality of service or impose other limitations on the service SBCT wishes to offer; and
Site Selection/Power. Tel USA shall designate the space within its wire center and/or access tandem where Lakeland shall collocate its equipment. Tel USA shall provide, at the rates set forth in Appendix F-1 described in Section 6.1, 48V DC power with generator and/or battery back-up, AC convenience outlet, heat, air conditioning and other environmental support to Lakeland’s equipment in the same standards and parameters required for Tel USA equipment within that wire center or access tandem. Standard 48V DC power shall be provided in 40 amp increments. Tel USA will be responsible for the installation of the AC convenience outlets, overhead lighting and equipment superstructure per the established rates in Appendix F-1.
Site Selection/Power. CenturyTel shall designate the space within its wire center and/or access tandem where Bayland shall collocate its equipment. CenturyTel shall provide, at the rates set forth in Appendix F-1 described in Section 6.1, 48V DC power with generator and/or battery back-up, AC convenience outlet, heat, air conditioning and other environmental support to Bayland’s equipment in the same standards and parameters required for CenturyTel equipment within that wire center or access tandem. Standard 48V DC power shall be provided in 40 amp increments. CenturyTel will be responsible for the installation of the AC convenience outlets, overhead lighting and equipment superstructure per the established rates in Appendix F-1.
Site Selection/Power. GTE shall designate the space within its wire center and/or access tandem where NorthPoint shall collocate its equipment. GTE shall provide, at the rates set forth in Attachment 2 described in Section 6.1, 48V DC power with generator and/or battery back-up, AC convenience outlet, heat, air conditioning and other environmental support to NorthPoint’s equipment in the same standards and parameters required for GTE equipment within that wire center or access tandem. Standard 48V DC power shall be provided in 40 amp increments. GTE will be responsible for the installation of the AC convenience outlets, overhead lighting and equipment superstructure per the established rates.

Related to Site Selection/Power

  • Site Selection 5.1.1 If the parties have not designated the street address of the Franchised Location on Exhibit A on the Effective Date, Franchisee shall identify, submit and obtain Franchisor’s prior written approval of the Franchised Location meeting the requirements of this Agreement prior to entering a lease or sublease for the Franchised Location. Franchisee shall provide Franchisor all information required by Franchisor, as determined by Franchisor in Franchisor’s sole determination, necessary for Franchisor to evaluate the Franchised Location. Franchisor shall have ten (10) business days to review Franchisee’s written site proposal for the Franchised Location and notify Franchisee of its approval or disapproval in writing. Franchisor’s failure to respond within ten (10) business days shall signify Franchisor’s disapproval of the site. Franchisor shall not unreasonably withhold Franchisor’s approval of a proposed site for the Franchised Location. 5.1.2 Franchisee must have a site for the Franchised Location approved by Franchisor, receive the opening notice from Franchisor described in Section 5.4 below, and open Franchisee’s Franchised Business for business within six (6) months from the Effective Date, except as otherwise provided in Section 5.1.3 All matters related in any way to Franchisee’s site are Franchisee’s sole responsibility, regardless of any assistance Franchisor may choose to provide. Franchisee is responsible for obtaining any architectural and engineering services required for Franchisee’s facility and for ensuring its compliance with local law. Neither Franchisor, nor any other person or company associated with Franchisor shall have any liability for any site‐related matter. ▇▇▇▇▇▇▇▇▇▇ agrees not to make any claims against Franchisor and/or any of Franchisor’s affiliates or associates with regard to such matters. 5.1.4 If Franchisor makes a loan to Franchisee for (i) Franchisee’s purchase of the franchise for the Franchised Business; (ii) the remodeling of the Franchised Location; (iii) the transfer of any interest in this franchise or this Agreement; or (iv) any other purpose; Franchisee shall open (or re‐open, as the case may be), the Franchised Business for business within sixty (60) days from the loan origination date.

  • Panel Selection 1. The Parties shall apply the following procedures in selecting a Panel: (a) the Panel shall comprise 3 members; (b) within 15 days following the date of the establishment of the Panel, each Party shall nominate a Panelist; (c) the Parties shall endeavor 2. If a Panelist appointed under this Article resigns or becomes unable to act, a successor Panelist shall be appointed within 30 days in accordance with the selection procedure as prescribed for the appointment of the original Panelist and the successor shall have all the powers and duties of the original Panelist. The work of the Panel shall be suspended during the appointment of the successor Panelist.

  • Single Source Selection Services for tasks in circumstances which meet the requirements of paragraph 3.10 of the Consultant Guidelines for Single Source Selection, may, with the Association's prior agreement, be procured in accordance with the provisions of paragraphs 3.9 through 3.13 of the Consultant Guidelines.

  • Cloud Computing State Risk and Authorization Management Program (TX-RAMP In accordance with Senate Bill 475, Acts 2021, 87th Leg., R.S., pursuant to Texas Government Code, Section 2054.0593, Contractor acknowledges and agrees that, if providing cloud computing services for System Agency, Contractor must comply with the requirements of the state risk and authorization management program and that System Agency may not enter or renew a contract with Contractor to purchase cloud computing services for the agency that are subject to the state risk and authorization management program unless Contractor demonstrates compliance with program requirements. If providing cloud computing services for System Agency that are subject to the state risk and authorization management program, Contractor certifies it will maintain program compliance and certification throughout the term of the Contract.

  • Adverse Selection No selection procedures adverse to the Noteholders were utilized in selecting the Receivables from those receivables owned by the Seller which met the selection criteria set forth in this Agreement.