Specific Requirements/Restrictions. Contractor shall provide at least one English-speaking person who shall be present at all times during the execution of this Contract, be thoroughly familiar with the types of materials and equipment used during the execution of the services, and direct and supervise all services performed as specified herein. Furthermore, Contractor shall provide adequate labor to provide services in accordance with these specifications. Services shall be accepted by PM upon satisfactory completion of all specifications described herein. All personnel shall be informed of and shall abide by the following responsibilities and restrictions: • Access into project areas for this contract shall be limited to weekdays unless otherwise specified by PM or designee. • Contract crews shall only utilize access roads approved by PM or designee. • The vehicle speed limit shall not exceed 10 mph. • Vehicles shall park off the roads on pre-designated areas identified by PM or designee. • All staging of equipment and materials shall be conducted within areas identified by PM or designee. • No litter, including tobacco debris, food packaging, and construction materials shall be allowed on the job site. • All litter shall be collected at the end of each day and shall be disposed of off-site. • No smoking shall be permitted within OC Parks facility boundaries, including staging areas. • No toxic materials, including hydrocarbons, fuel, antifreeze, etc., shall be allowed to be deposited on the soil surface within the job sites. Herbicides approved for treatment of invasive weeds shall comply with the most current version of the OC Parks IPM Plan. • All equipment maintenance, including re-fueling, lubrication and herbicide mixing shall be conducted off-site. • Equipment and materials shall not be stored within OC Parks facility boundaries. • Equipment and clothing, including shoes, must be cleaned of weed seed before entering a treatment site to reduce spread. • All spills of toxic materials shall be cleaned up immediately and PM shall be notified immediately. • There shall be no harm to or harassment of any wildlife species, including snakes. PM shall be notified of any wildlife encountered during spray efforts and work areas that were abandoned due to the presence of wildlife. • PM shall be notified of any observation of unauthorized encampment, and work areas that were abandoned due to the presence of such encampments.
Appears in 3 contracts
Sources: Invasive Plant Control Services Contract, Contract for Invasive Plant Control Services, Invasive Plant Control Services Contract
Specific Requirements/Restrictions. Contractor shall provide at least one English-speaking person who shall be present at all times during the execution of this Contract, be thoroughly familiar with the types of materials and equipment used during the execution of the services, and direct and supervise all services performed as specified herein. Furthermore, Contractor shall provide adequate labor to provide services in accordance with these specifications. Services shall be accepted by PM upon satisfactory completion of all specifications described herein. All personnel shall be informed of and shall abide by the following responsibilities and restrictions: • Access into project areas for this contract shall be limited to weekdays unless otherwise specified by PM or designee. • Contract crews shall only utilize access roads approved by PM or designee. • The vehicle speed limit shall not exceed 10 mph. • Vehicles shall park off the roads on pre-designated areas identified by PM or designee. • All staging of equipment and materials shall be conducted within areas identified by PM or designee. • No litter, including tobacco debris, food packaging, and construction materials shall be allowed on the job site. • All litter shall be collected at the end of each day and shall be disposed of off-site. • No smoking shall be permitted within OC Parks facility boundaries, including staging areas. • No toxic materials, including hydrocarbons, fuel, antifreeze, etc., shall be allowed to be deposited on the soil surface within the job sites. Herbicides approved for treatment of invasive weeds shall comply with the most current version of the OC Parks IPM Planby PM are allowed. • All equipment maintenance, including re-fueling, lubrication and herbicide mixing shall be conducted off-site. • Equipment and materials shall not be stored within OC Parks facility boundaries. • Equipment and clothing, including shoes, must be cleaned of weed seed before entering a treatment site to reduce spread. • All spills of toxic materials shall be cleaned up immediately and PM shall be notified immediately. • There shall be no harm to or harassment of any wildlife species, including snakes. PM shall be notified of any wildlife encountered during spray efforts and work areas that were abandoned due to the presence of wildlife. • PM shall be notified of any observation of unauthorized encampment, and work areas that were abandoned due to the presence of such encampments.
Appears in 1 contract
Sources: Invasive Plant Control Services