Specifications and Drawings for Construction. In accordance with FAR Clause 52.236-21 “Specifications and Drawings for Construction” (APR 1984), the Subcontractor shall keep a copy of the drawings and specifications on the work site and shall give project engineer access thereto. Anything mentioned in the specifications and not shown on the drawings or shown in the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In the case of difference between drawings and specifications, the specifications shall govern. In the case of discrepancy in the figures, in the drawings, or in the specifications, the specifications shall govern. In the case of a discrepancy in the figures, the matter shall be promptly submitted to project engineer who shall promptly make a determination in writing. Any adjustment by the Subcontractor without such a determination shall be at its own risk and expense. Chemonics shall furnish, from time to time, clarifications of detailed drawings and other information as considered necessary.
Appears in 2 contracts
Specifications and Drawings for Construction. In accordance with FAR Clause 52.236-21 “Specifications and Drawings for Construction” (APR 1984), the Subcontractor shall keep a copy of the drawings and specifications on the work site and shall give project engineer access thereto. Anything mentioned in the specifications and not shown on the drawings or shown in the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In the case of difference between drawings and specifications, the specifications shall govern. In the case of discrepancy in the figures, in the drawings, or in the specifications, the specifications shall govern. In the case of a discrepancy in the figures, the matter shall be promptly submitted to project engineer engineers who shall promptly make a determination in writing. Any adjustment by the Subcontractor without such a determination shall be at its own risk and expense. Chemonics shall furnish, from time to time, clarifications of detailed drawings and other information as considered necessary.
Appears in 1 contract
Sources: Fixed Price Subcontract