Spills and Cleanup Clause Samples

Spills and Cleanup. Contractor shall instruct employees to cleanup any spills or scattered materials resulting from its Collection operation. Contractor shall not be required to cleanup spilled or scattered materials resulting from the actions of others including materials falling from overfilled containers or uncontained materials.

Related to Spills and Cleanup

  • Environmental Clearances The Authority represents and warrants that the environmental clearances required for construction of the Project shall be procured by the Authority prior to the date of issue of LOA. For the avoidance of doubt, the present status of environmental clearances is specified in Schedule-A.9

  • Contamination The presence in, on or under land, air or water of a substance (whether a solid, liquid, gas, odour, heat, sound, vibration or radiation) at a concentration above the concentration at which the substance is normally present in, on or under land, air or water in the same locality, that presents a risk of Environmental Harm, including harm to human health or any other aspect of the Environment, or could otherwise give rise to a risk of non-compliance with any Statutory Requirement for the protection of the Environment.

  • Cleanup Awarded vendor shall clean up and remove all debris and rubbish resulting from their work as required or directed by TIPS Member. Upon completion of work, the premises shall be left in good repair and an orderly, neat, clean and unobstructed condition.

  • Remediation If Contractor claims that its products or services satisfy the applicable requirements and standards specified in Section 4.2.1 and it is later determined by HCA that any furnished product or service is not in compliance with such requirements and standards, HCA will promptly inform Contractor in writing of noncompliance. Contractor shall, at no additional cost to HCA, repair or replace the non-compliant products or services within the period specified by HCA. If the repair or replacement is not completed within the specified time, HCA may cancel the Contract, delivery, task order, or work order, or purchase line item without termination liabilities or have any necessary changes made or repairs performed by employees of HCA or by another contractor, and Contractor shall reimburse HCA for any expenses incurred thereby.

  • Bulk Migration 2.1.9.1 If Telepak Networks requests to migrate twenty-five (25) or more UNE- Port/Loop Combination (UNE-P) customers to UNE-Loop (UNE-L) in the same Central Office on the same due date, Telepak Networks must use the Bulk Migration process, which is described in the BellSouth CLEC Information Package, “UNE-Port/Loop Combination (UNE-P) to UNE-Loop (UNE-L) Bulk Migration.” This CLEC Information package, incorporated herein by reference as it may be amended from time to time, is located at ▇▇▇.▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇▇▇▇▇▇▇.▇▇▇/▇▇▇▇▇▇/▇▇▇▇/▇▇▇▇.▇▇▇▇. The rates for the Bulk Migration process shall be the nonrecurring rates associated with the Loop type being requested on the Bulk Migration, as set forth in Exhibit A of this Attachment. Additionally, OSS charges will also apply per LSR generated per customer account as provided for in the Bulk Migration Request. The migration of loops from Integrated Digital Loop Carrier (IDLC) will be done pursuant to Section 2.6 of this Attachment.