STATEMENT OF THE WORK Sample Clauses

STATEMENT OF THE WORK. The Contractor shall furnish all labor and materials and shall execute the entire Work described below:
STATEMENT OF THE WORK. 2.01 Subject to paragraph 3.02 below, Contractor shall prosecute and complete the Work in accordance with the schedule and as more fully described in Section 01100, paragraphs 1.13 and 1.14. 2.02 Owner will occupy premises during the entire construction period for conduct of normal operations. Cooperate with Owner in scheduling operations to minimize conflict and to facilitate Owner’s usage on the basis of the completion dates on the indicated schedule based on the Owner’s occupancy of areas. See Section 01100. 2.03 The Contractor specifically acknowledges that it has read and understands the requirements of the General Conditions, Section 00700, Parts 7 and 8 relating to Changes, including the requirements to provide timely notice, keep daily records, and submit documentation. Contractor further acknowledges that failure to comply with any of these requirements will result in rejection of claims as set forth in paragraph 7.01 B.5. General Contractor’s Initials _
STATEMENT OF THE WORK. The Contractor shall furnish and provide all labor, equipment, and materials and perform all Work for the Project in strict accordance with the Contract Documents.
STATEMENT OF THE WORK. 2.1 The Project is the Work identified in the plans and specifications prepared by dated , 2021 for Board of Education, , including the following addenda: A listing of the plans and specifications included in the Contract Documents is attached as Exhibit A. 2.2 The Parties agree that the Project shall include the following alternates: 2.3 The Parties agree to the following modifications to the Project’s plans and specifications, including the noted value engineering items: 2.4 The Parties agree that the following allowances are included in the Contract Sum in Section 5.1 below: 2.5 The Contractor shall provide and pay for all materials, tools, equipment, labor and professional and non-professional services, and shall perform all other acts and supply all other things necessary, to fully and properly perform and complete the Work, as required by the Contract Documents. 2.6 The Contractor shall further provide and pay for all related facilities described in any of the Contract Documents, including all work expressly specified therein and such additional work as may be reasonably inferred therefrom, saving and excepting only such items of work as are specifically stated in the Contract Documents not to be the obligation of the Contractor. The totality of the obligations imposed upon the contractor by this Article and by all other provisions of the Contract Documents, as well as the structures to be built and the labor to be performed, is herein referred to as the "Work".
STATEMENT OF THE WORK. 2.01 Contractor shall prosecute and complete the Work in accordance with the schedule. 2.02 Owner will occupy premises during the entire construction period for conduct of normal operations. Contractor shall cooperate with Owner in scheduling operations to minimize conflict and to facilitate Owner’s usage on the basis of the completion dates on the indicated schedule based on the Owner’s occupancy of areas. 2.03 The Contractor specifically acknowledges that it has read and understands the requirements of the General Conditions relating to Changes, including the requirements to provide timely notice, keep daily records, and submit documentation. Contractor further acknowledges that failure to comply with any of these requirements will result in rejection of claims.
STATEMENT OF THE WORK. 2.1 The Contractor shall provide and pay for all materials, tools, equipment, labor and professional and non-professional services, and shall perform all other acts and supply all other things necessary to fully and properly perform and complete the Services and Work as required by the Contract Documents. 2.2 The Contractor shall further provide and pay for all related facilities described in any of the Contract Documents, including all work expressly specified therein and such additional work as may be reasonably inferred there from, saving and excepting only such items of work as are specifically stated in the Contract Documents not to be the obligation of the Contractor. The totality of the obligations imposed upon the Contractor by this Article and by all other provisions of the Contract Documents, as well as the structures to be built and the labor to be performed, is herein referred to as the "Work".
STATEMENT OF THE WORK. 2.1 The Project is the Work identified in the plans and specifications prepared by SfL+a Architects dated June 6, 2018 for ▇▇▇▇▇ County Board of Education, including the following addenda: Addendum #1 – June 25, 2018 – 58 pages Addendum #2 – July 2, 2018 – 63 pages Addendum #3 – July 9, 2018 – 73 pages 2.2 The Parties agree that the Project shall include the following alternates: Alternate 2A - $0 Alternate 2B - $0 Alternate 2C - $0 Alternate 2D - $0 Alternate 2E- $0 Alternate 3A - $4,400 Alternate 3B - $3,000 Alternate 3C - $0 Alternate 4 - $0 Alternate 5 - $73,000 Alternate 7 - $0 Alternate 8 - $0 Alternate 9 - $0 Alternate 10 - $17,440 Alternate 12 - ($37,820) Alternate 13 - ($18,000) Alternate 14 - ($12,000) 2.3 The Parties agree to the following modifications to the Project’s plans and specifications, including the noted value engineering items: • Delete landscaping irrigation between the building wings: ($5,400) • Reduce unsuitable soil (trenching) allowance from 500 cy to 250 cy: ($3,750) • Reduce unsuitable soil (bulk) allowance from 1000 cy to 500 cy: ($3,750) • Revise height of perimeter fence from 6’ to 4’: ($8,460) • At Pre-K and Kindergarten outdoor exploratory area, revise fence from brick and aluminum to vinyl coated 4’ high chain link fence, maintain dense landscaping to obscure view: ($13,000) • Reduce the size of the service yard eliminating the propane tanks and paving: ($8,228) • Delete low wall at flagpole: ($4,500) • Delete four picnic tables, purchase at later time with FF&E: ($3,115) • Delete brick pavers at drop off and use control joints to create the pattern: ($2,500) • Revise wood door finish from rift cut oak to plain sawn oak: ($3,600) • Revise brick pilasters in corridor to painted 4” concrete masonry units with bullnose ends: ($26,850) • Change from 7 colors of terrazzo to 6 colors: ($5,200) • Reduce warranty period for terrazzo from 15-years to 3-years: ($10,800) • Revise ruffled brick accent to patterned utility brick: ($12,500) • Delete redundant water heater WH2: ($12,600) • Revise above slab piping from cast iron to solid PVC: ($34,650) • Revise grease interceptor from polypropylene to cast concrete with epoxy coating: ($15,120) • Revise energy recovery unit to allow AAON equipment: ($47,200) • Remove canvas wrap at vertical stacks on water source heat pumps and energy recovery units: ($8,200) • Direct bury main electrical to within 20’ from the building exterior wall: ($7,200) • Revise from 4 electrical circuits per cl...
STATEMENT OF THE WORK. 2.1 The Project is the Work identified in the plans and specifications prepared by SfL+a Architects dated November 6, 2018 for the Moore County Schools Board of Education, including the following addenda: Addendum #1 dated 11/27/2018 2.2 The Parties agree that the Project shall include the following alternates: 2.3 The Parties agree to the following modifications to the Project’s plans and specifications, including the noted value engineering items: 2.4 The Contractor shall provide and pay for all materials, tools, equipment, labor and professional and non-professional services, and shall perform all other acts and supply all other things necessary, to fully and properly perform and complete the Work, as required by the Contract Documents. 2.5 The Contractor shall further provide and pay for all related facilities described in any of the Contract Documents, including all work expressly specified therein and such additional work as may be reasonably inferred therefrom, saving and excepting only such items of work as are specifically stated in the Contract Documents not to be the obligation of the Contractor. The totality of the obligations imposed upon the contractor by this Article and by all other provisions of the Contract Documents, as well as the structures to be built and the labor to be performed, is herein referred to as the "Work".
STATEMENT OF THE WORK. 3D Dispatch will:  Find freight that best matches the profile for the Client  Will contact Client with load matches and go over options  Upon Client agreeing to take a load, 3D Dispatch will fax to shipper/broker the Clients Authority, W-9, Proof of Insurance, and Order Insurance Certificate if required, along with any other required supporting documentation  Upon forwarding of the final load information, and mailing all documentation to the Client, the services of 3D Dispatch have been fully performed
STATEMENT OF THE WORK. 3.1 Subcontractor shall complete the Work as described and provide the support functions required to effectively manage and report on the status of the Work as specified in this Subcontract. 3.2 Subcontractor shall provide all management, supervision, labor, consumable materials, construction equipment, construction aids, tools, services, testing devices, warehousing, supplies, inspections, insurance, communication devices, temporary services, and all other necessary items to successfully accomplish the construction described by the Scope of Work. This includes, but is not limited to, on and off site transportation, receiving, unloading, storing, maintenance, and distribution of construction materials, installation of such materials into the Work, proper care of materials while in the custody of the Subcontractor, and testing and final construction punch-list completion and turnover of the Work as specified.