Stormwater management structures Sample Clauses

The 'Stormwater management structures' clause defines the requirements and standards for the design, installation, and maintenance of systems that control and direct stormwater runoff on a property. This typically includes specifications for components such as drains, retention basins, swales, and permeable surfaces, ensuring they are constructed to handle expected water volumes and prevent flooding or erosion. By setting clear expectations for stormwater infrastructure, the clause helps mitigate water damage, supports environmental compliance, and ensures the long-term functionality of the site.
Stormwater management structures. Stormwater management structures, including but not limited to ponds, basins, and vaults, shall be located outside of shoreline jurisdiction where possible, as far from the ordinary high water mark as feasible, and shall minimize disturbance of vegetation conservation buffers.
Stormwater management structures. (1) The Developer shall install all storm water management facilities for the Property including related storm water sewers required by Municipal Ordinance and the plans and specifications approved by the Municipal Engineer as set forth in Exhibit D. Developer and Municipality agree to comply by the terms of the Stormwater Maintenance Agreement attached hereto as Exhibit D. (2) Where standards and/or specifications have not been established by the Municipality, all work shall be made in accordance with established engineering practices as designated and approved by the Municipal Engineer. (3) Developer and Municipality acknowledge that a regional stormwater facility (“Regional Facility”) has been constructed on Outlot 1 of CSM 5752 in order to adequately manage the stormwater from the Property and other surrounding properties. Developer shall take all steps necessary to tie in the stormwater management facilities for the Development to the regional facility located on Outlot 1.

Related to Stormwater management structures

  • Stormwater Management a) The Owner AGREES to implement the requirements incorporated in the Draft Plan Conditions attached as Schedule “F” and any reports submitted to Kawartha Region Conservation Authority and the City pertaining to: i) pre and post development run-off flows and water balance calculations, and the intended means of conveying stormwater flow from each Lot, Block and the entire proposed Plan of Subdivision; ii) the anticipated impact of the Plan of Subdivision on water quality and phosphorus control, as it relates to fish and fish habitat once adequate protective measures have been taken; iii) the means whereby erosion and sedimentation and their effects will be minimized on the site during and after construction; iv) the site soil conditions, including grain size distribution profiles; v) a site grading plan. b) The Owner AGREES to erect and maintain all stormwater management and erosion and sedimentation control structures operating and in good repair during the construction period, in a manner satisfactory to Kawartha Region Conservation Authority and the City. c) Prior to the execution of this Agreement, the Owner AGREES to confirm to the City that Conservation Authority has reviewed and approved the stormwater management report and plan, erosion and sedimentation plan, and final Lot Grading Plans as required under this Section. a) UPGRADES TO EXISTING STORM SEWER b) UPGRADES TO EXISTING SANITARY SEWER

  • Management Structure Describe the overall management approach toward planning and implementing the contract. Include an organization chart for the management of the contract, if awarded.

  • Framework Management Structure The Supplier shall provide a suitably qualified nominated contact (the “Supplier Framework Manager”) who will take overall responsibility for delivering the Goods and/or Services required within this Framework Agreement, as well as a suitably qualified deputy to act in their absence. The Supplier shall put in place a structure to manage the Framework in accordance with Framework Schedule 2 (Goods and/or Services and Key Performance Indicators). A full governance structure for the Framework will be agreed between the Parties during the Framework Agreement implementation stage. Following discussions between the Parties following the Framework Commencement Date, the Authority shall produce and issue to the Supplier a draft Supplier Action Plan. The Supplier shall not unreasonably withhold its agreement to the draft Supplier Action Plan. The Supplier Action Plan shall, unless the Authority otherwise Approves, be agreed between the Parties and come into effect within two weeks from receipt by the Supplier of the draft Supplier Action Plan. The Supplier Action Plan shall be maintained and updated on an ongoing basis by the Authority. Any changes to the Supplier Action Plan shall be notified by the Authority to the Supplier. The Supplier shall not unreasonably withhold its agreement to any changes to the Supplier Action Plan. Any such changes shall, unless the Authority otherwise Approves, be agreed between the Parties and come into effect within two weeks from receipt by the Supplier of the Authority’s notification. Regular performance review meetings will take place at the Authority’s premises throughout the Framework Period and thereafter until the Framework Expiry Date (“Supplier Review Meetings”). The exact timings and frequencies of such Supplier Review Meetings will be determined by the Authority following the conclusion of the Framework Agreement. It is anticipated that the frequency of the Supplier Review Meetings will be once every month or less. The Parties shall be flexible about the timings of these meetings. The purpose of the Supplier Review Meetings will be to review the Supplier’s performance under this Framework Agreement and, where applicable, the Supplier’s adherence to the Supplier Action Plan. The agenda for each Supplier Review Meeting shall be set by the Authority and communicated to the Supplier in advance of that meeting. The Supplier Review Meetings shall be attended, as a minimum, by the Authority Representative(s) and the Supplier Framework Manager.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following: A. Company is required to submit a Notice of Intent to use the State of Florida Multi-Sector Generic Permit for Stormwater Discharge Associated with Industrial Activity. Authority and Company both acknowledge that close cooperation is necessary to ensure compliance with any stormwater discharge permit terms and conditions, as well as to ensure safety and to minimize the cost of compliance. Company acknowledges further that it may be necessary to undertake actions to minimize the exposure of stormwater to “significant materials” (as such term may be defined by applicable stormwater rules and regulations) generated, stored, handled, or otherwise used by Company by implementing and maintaining “best management practices” (BMPs) (as such term may be defined in applicable stormwater rules and regulations). Company will establish a BMP plan for the Premises and submit a copy to Authority. B. Company will be knowledgeable of any stormwater discharge permit requirements applicable to Company and with which Company will be obligated to comply. The submittal of a Notice of Intent will be made by Company to the FDEP, and a copy will be submitted to Authority. Company is required to comply with the following requirements including, but not limited to, certification of non-stormwater discharges; collection of stormwater samples; preparation of a Stormwater Pollution Prevention Plan or similar plans; implementation of BMPs; and maintenance and submittal of necessary records. In complying with such requirements, Company will observe applicable deadlines set by the regulatory agency that has jurisdiction over the permit. Company agrees to undertake, at its sole expense, those stormwater permit requirements for which it has received written notice from the regulatory agency and that apply to the Premises, and Company agrees that it will hold harmless and indemnify Authority for any violations or non-compliance with any such permit requirements.

  • Infrastructure Modification of the location and/or sizing of the infrastructure for the Project that does not materially change the functionality of the infrastructure.