Sub-Slab Vapor Sampling Sample Clauses

Sub-Slab Vapor Sampling. Sub slab vapor screening will be conducted within all on-site structures. Buildings B1, B4, B5-B and B-6 will have one sub-slab sample collection location; all other buildings will have two sampling locations. Two soil vapor samples will also be collected on the western portion of the Site. A tracer gas (e.g., helium) will be used at all soil vapor sampling locations to verify that adequate sampling techniques are being implemented (i.e. to verify the absence of significant infiltration of outside air), in accordance with methodology specified in the NYSDOH’s Guidance for Evaluating Soil Vapor Intrusion in the State of New York (October 2006). All proposed sampling locations are identified on Figure 4, Appendix A. All sampling locations are subject to change based upon field conditions (cracks in slab, preferential pathways, etc).

Related to Sub-Slab Vapor Sampling

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • Closet I Urinal Requirements Employees Closets Urinals

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, ▇▇ ▇ ▇▇▇▇▇▇, ▇.▇., ▇▇▇▇▇ ▇▇▇▇▇, ▇▇▇▇▇▇▇▇▇▇, ▇.▇., ▇▇▇▇▇, telephone (▇▇▇) ▇▇▇-▇▇▇▇. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of ▇▇▇▇▇▇ ▇▇▇▇▇, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (▇▇▇) ▇▇▇-▇▇▇▇. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.