Common use of Substitute Construction Methods or Procedures Clause in Contracts

Substitute Construction Methods or Procedures. If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by Engineer. Contractor shall submit sufficient information to allow Engineer, in Engineer’s sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. The requirements for review by Engineer will be similar to those provided in Paragraph 6.05.A.2.

Appears in 1 contract

Sources: Basic Form Agreement

Substitute Construction Methods or Procedures. If a specific means, method, technique, sequence, sequence or procedure of construction is shown or indicated in and expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, sequence or procedure of construction approved by Engineerconstruction, if acceptable to Project Manager. Contractor shall submit sufficient information to allow EngineerProject Manager, in Engineer’s Project Manager's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. The requirements procedure for review by Engineer Project Manager will be similar to those that provided in Paragraph 6.05.A.2subparagraph 6.6.

Appears in 1 contract

Sources: Construction Contract