Common use of Substructure Foundation Alternatives Clause in Contracts

Substructure Foundation Alternatives. The Consultant shall evaluate at a minimum two separate substructure types for possible development during final design. Whenever soil conditions allow, a shallow and a deep alternative shall be evaluated. Each substructure type shall be developed to the point of pile and/or footing size selection and spacing to allow for constructability and cost analysis to be performed.

Appears in 3 contracts

Sources: Consulting Agreement, Consulting Agreement, Consulting Agreement