Subtask 1.3 – Inspection Activities Clause Samples

Subtask 1.3 – Inspection Activities. Golder will provide field CQA inspection to verify that the liner system is constructed in accordance with the construction plans, specifications, and CQA Plan. Accordingly, we will observe and document the following:  Review contractor submittals  Observation of the subgrade surface that it is firm, unyielding and free of waste debris or large rocks  Conformance testing of all geosynthetic materials (geomembrane, geocomposite, and geotextiles Solicitation PPWSRFPJK1704 – Engineering Design and CQA Services April 2017 21 P1777870  Conformance testing of sump gravel and sump sand  Observation of geosynthetics deployment and installation including trial seams, seaming, non-destructive and destructive testing as specifiedCompletion of an appropriate geoelectric leak location survey. Golder will work with the County to specify an appropriate method such as the Water Puddle Method on bare liner per ASTM D 7002. We do not believe that the geocomposite LCRS with the overlying woodchips will be a suitable conductor of electricity, and therefore, the dipole test method per ASTM D 7007 may be ineffective.  Observation of the installation of biogas piping, leachate pipe, and leak detection piping.  Observation of the installation of all pipe boots and verification that spark testing is completed on all pipe boot welds and any specified clamps/bands are installed properly.  Observation of the installation of the operations layer.  Track and coordinate review of contractor submittals  Prepare daily construction reports  Verify that the contractor is complying with project requirements  Maintain clear and consistent communication between all parties  Perform on-site tests and verify construction conforms to the plans and specifications  Review as-built drawings for completeness and conformance to the plans and specifications  Identify and resolve non-conforming work  Accompany regulators and other public agencies on inspections Golder’s CQA Monitor will be on-site full time during the installation of the liner system and related piping components. We have assumed that this work will be completed by the contractor during 8-hour work days, five days per week.

Related to Subtask 1.3 – Inspection Activities

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner. 2.1.2 The NYISO and Connecting Transmission Owner shall each provide the Interconnection Customer written acknowledgment that it has received the Interconnection Customer’s written test report. Such written acknowledgment shall not be deemed to be or construed as any representation, assurance, guarantee, or warranty by the NYISO or Connecting Transmission Owner of the safety, durability, suitability, or reliability of the Small Generating Facility or any associated control, protective, and safety devices owned or controlled by the Interconnection Customer or the quality of power produced by the Small Generating Facility.

  • Construction Activities Please list all major construction activities, both planned and completed, to be performed by Seller or the EPC Contractor. Activity EPC Contractor / Subcontractor Completion Date __/__/____ (expected / actual) __/__/____ (expected / actual)

  • TESTING AND INSPECTION 29 6.1 Pre-Commercial Operation Date Testing and Modifications. 29

  • Site Visits ‌ The Commission may visit the School at any time and may, at its discretion, conduct site visits and monitoring. When appropriate, the Commission shall make reasonable efforts to provide notice of visits. Such site visits may include any activities reasonably related to fulfillment of the Commission’s oversight responsibilities including, but not limited to, inspection of the facilities; audit of financial books and records; inspection of records maintained by the School; interviews and observations of the principal, staff, school families, staff of an affiliated nonprofit or educational service provider and community members; and observation of classroom instruction.

  • Safety Inspection During inspection of County facilities conducted by the State Division of Occupational Safety and Health for the purpose of determining compliance with the California OSHA requirements, an OCEA designated employee shall be allowed to accompany the inspector while the inspector is in the employee's agency/department. The employee so designated shall suffer no loss of pay when this function is performed during the employee's regularly scheduled work hours.