Access Toll Connecting Trunk Group Architecture 8.2.1 If Reconex chooses to subtend a Verizon access Tandem, Reconex’s NPA/NXX must be assigned by Reconex to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center subtends as identified in the LERG. 8.2.2 Reconex shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from Reconex’s Customers. 8.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office Reconex utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the Tandem Verizon utilizes to provide Exchange Access in such LATA. 8.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow Reconex’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access tandem.
Connecting Transmission Owner’s Attachment Facilities Construction The Connecting Transmission Owner’s Attachment Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Connecting Transmission Owner and Developer agree on another mutually acceptable deadline, the Connecting Transmission Owner shall deliver to the Developer “as-built” drawings, relay diagrams, information and documents for the Connecting Transmission Owner’s Attachment Facilities set forth in Appendix A. The Connecting Transmission Owner shall not transfer operational control of the Connecting Transmission Owner’s Attachment Facilities and Stand Alone System Upgrade Facilities to the NYISO upon completion of such facilities.
System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.
Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.