Support by Genetec Sample Clauses

Support by Genetec. Genetec provides no support with respect to the SDK under this Agreement. However, SDK support is available as part of certain DAP Subscription plans. Licensee may, therefore, need to procure a DAP Subscription to obtain support from Genetec. The scope of Genetec’s support obligations will depend on the DAP Subscription plan chosen by Licensee. Unless expressly stated otherwise in the terms and conditions applicable to DAP Subscriptions, Genetec’s commitment to provide support in relation to the SDK as part of any DAP Subscription will consist of using commercially reasonable efforts to assist Licensee with issues covered by the scope of support services included within the scope of Licensee’s then-active DAP Subscription plan, in accordance with relevant Genetec Documentation.

Related to Support by Genetec

  • License; Use Upon delivery to an Authorized Person or a person reasonably believed by Custodian to be an Authorized Person of the Fund of software enabling the Fund to obtain access to the System (the “Software”), Custodian grants to the Fund a personal, nontransferable and nonexclusive license to use the Software solely for the purpose of transmitting Written Instructions, receiving reports, making inquiries or otherwise communicating with Custodian in connection with the Account(s). The Fund shall use the Software solely for its own internal and proper business purposes and not in the operation of a service bureau. Except as set forth herein, no license or right of any kind is granted to the Fund with respect to the Software. The Fund acknowledges that Custodian and its suppliers retain and have title and exclusive proprietary rights to the Software, including any trade secrets or other ideas, concepts, know-how, methodologies, or information incorporated therein and the exclusive rights to any copyrights, trademarks and patents (including registrations and applications for registration of either), or other statutory or legal protections available in respect thereof. The Fund further acknowledges that all or a part of the Software may be copyrighted or trademarked (or a registration or claim made therefor) by Custodian or its suppliers. The Fund shall not take any action with respect tot the Software inconsistent with the foregoing acknowledgement, nor shall the Fund attempt to decompile, reverse engineer or modify the Software. The Fund may not ▇▇▇, sell, lease or provide, directly or indirectly, any of the Software of any portion thereof to any other person or entity without Custodian’s prior written consent. The Fund may not remove any statutory copyright notice or other notice included in the Software or on any media containing the Software. The Fund shall reproduce any such notice on any reproduction of the Software and shall add any statutory copyright notice or other notice to the Software or media upon Custodian’s request.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Freedom has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Freedom. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Freedom (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Freedom, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Freedom will then have the option of paying the one-time SC rates to place the Loop.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Data Use Each party may use Connected Account Data in accordance with this Agreement and the consent (if any) each obtains from each Connected Account. This consent includes, as to Stripe, consent it receives via the Connected Account Agreement.

  • Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information.