Survey and Base Mapping Clause Samples

Survey and Base Mapping. GHD Inc. shall perform all surveys and base mapping necessary for the preliminary engineering, detailed design, conform requirements to existing topography, and/or infrastructure design. The following exhibit shows the approximate limits of the proposed survey work. Project surveying and mapping shall include, but not be limited to mobile LiDAR and aerial photography; setting vertical and horizontal control; detailed topographic surveys; conform elevations and cross-sections; and major offsite structures or improvements worthy of design consideration. Mapping product will be a digital base map with surface, with supplemental digital rectified orthophotograph, all tied to the required datum’s. Mapping will meet the Caltrans Orders of Survey Accuracy at a scale of 1” = 20’ and a one-foot contour interval. All work under this phase will be performed under the direction of a California Licensed Land Surveyor and in accordance with the Caltrans Survey Manual.
Survey and Base Mapping. ▇▇▇▇▇ will order utility locates, provide detailed mapping of features, and prepare a topographic and boundary survey base map for the wastewater treatment plant and Rock Creek Pump Station. The survey base map will be updated throughout the project duration as needed to include locations of archeological, wetland, and geotechnical flagging. ▇▇▇▇▇ will prepare a complete base map for use in preparing the wastewater treatment plant plans. Wallis and EEE will review the base map and coordinate with ▇▇▇▇▇ for additional survey needs as required. • City will provide all available as-built drawings of utilities within the project extents. • Utility locates will be accomplished via One-Call. Utility as-builts will be compiled, compared and resolved with locates • Base maps will include the following features:
Survey and Base Mapping. ▇▇▇▇▇▇▇ Group (WG) will perform surveying tasks in accordance with Caltrans Survey Manual. Surveying tasks will include base mapping, digital terrain modelling, topographic surveying, photogrammetry, and a detailed tree survey. Work under this task will be completed under the direct supervision of a California Licensed Land Surveyor and will comply with the provisions of the Professional Land Surveyors Act, the Business and Professions Code (Sections 8700 – 8805), and the Public Resources Code (Section 8810 – 8819).
Survey and Base Mapping. ▇▇▇▇▇ will provide a survey and base map of the following features: • The stormwater manhole rim and invert elevations and horizontal location • Update elevations of the bank in the vicinity of the outfall into Rock Creek. Wallis will add the new survey data into the existing base map for the project area. • Base maps will include the following features: o Contours at 1-foot elevations with active surface in Civil 3D 2018+. o Utilities with inverts for sanitary sewer and storm structures.
Survey and Base Mapping. District will coordinate with on-call surveyor through separate contract to perform survey and base-mapping. BHC will review the survey and base-mapping and utilize for design. Receivables: ▪ Requested Information as described in Task 2.1. Assumptions: ▪ District will provide the survey and base-mapping required through a separate contract with their on-call consultant. ▪ A geotechnical investigation is not included or required to support design. BHC will use available information and/or be conservative in the design approach. Deliverables: ▪ None. Task 3 – Design Design Plans, Technical Specifications, and Opinion of Probable Construction Costs will be prepared under one (1) construction contract with deliverables at 75%, 99%, and Issued for Bid design phases. The anticipated and preliminary drawing list is included below and includes up to eighteen (18) drawings for the 75%, 99%, and IFB design deliverables. Work Tasks:
Survey and Base Mapping. A. Develop base mapping based on existing construction plans, utility maps, right-of-way maps and recorded plats. B. Prepare route survey from centerline of Buena Vista Boulevard to a point 700 feet north of said intersection. The route survey will include the following items: right-of-way lines, spot elevations of centerline, top of curb, flow line of curb, grate and invert elevation of drainage structures, rim elevations of sanitary sewer structures, water valves and any other items falling within the survey corridor. The survey corridor consists of the existing right-of-way of Buena Vista Boulevard together with an additional 20 feet beyond the right-of-way. C. Provide horizontal and vertical control for contractor consisting of permanent and temporary benchmarks and off-sets of horizontal control points. D. Field location and CADD mapping of underground utilities as flagged by Central Florida Locators within corridor. E. Horizontal and vertical datums will be consistent with The Villages datum system.
Survey and Base Mapping. J-U-B shall complete a topographic survey along the proposed project limits as defined below. At this time, it is not known if the existing sewer between ▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇ ▇▇ ▇▇▇ ▇▇▇▇▇▇ will remain in-service or if it will be abandoned. Survey and base mapping is provided under Task 7 in the area between Meridian Road and Main Street.
Survey and Base Mapping. The Consultant shall perform field utility locates and survey features installed by the recent Tukwila Village project within the S 144th Street right of way. Field Survey and Note Reduction. Perform note reduction of the field survey data. No survey updates are anticipated outside of the right of way as this area is currently under construction and constantly changing.
Survey and Base Mapping. MGE will coordinate with the County’s surveyor to incorporate the topographic map, utilities, and parcel boundaries in the project plans.

Related to Survey and Base Mapping

  • Survey Buyer may obtain a survey of the Property before the Closing to assure that there are no defects, encroachments, overlaps, boundary line or acreage disputes, or other such matters, that would be disclosed by a survey ("Survey Problems"). The cost of the survey shall be paid by the Buyer. Not later than business days prior to the Closing, Buyer shall notify Seller of any Survey Problems which shall be deemed to be a defect in the title to the Property. Seller shall be required to remedy such defects within If Seller does not or cannot remedy any such defect(s), Buyer shall have the option of canceling this Agreement, in which case the ▇▇▇▇▇▇▇ Money shall be returned to Buyer.

  • UCC Searches With respect to each Borrower, UCC searches with the Secretary of State and local filing office of each state where such Borrower maintains its chief executive office, its jurisdiction of organization and/or a place of business or assets;

  • UCC Search The results of a Uniform Commercial Code search showing all financing statements and other documents or instruments on file against the Borrower in the office of the Secretary of State of Texas, such search to be as of a date no more than ten (10) days prior to the date of the initial Advance or the Letter of Credit;

  • Title Information (a) On or before the delivery to the Administrative Agent and the Lenders of each Reserve Report required by Section 8.12, the Borrower will deliver title information in form and substance acceptable to the Administrative Agent covering enough of the Oil and Gas Properties evaluated by such Reserve Report that were not included in the immediately preceding Reserve Report, so that the Administrative Agent shall have received together with title information previously delivered to the Administrative Agent, satisfactory title information on at least 80% of the total value of the Oil and Gas Properties evaluated by such Reserve Report. (b) If the Borrower has provided title information for additional Properties under Section 8.13(a), the Borrower shall, within 60 days of notice from the Administrative Agent that title defects or exceptions exist with respect to such additional Properties, either (i) cure any such title defects or exceptions (including defects or exceptions as to priority) which are not permitted by Section 9.03 raised by such information, (ii) substitute acceptable Mortgaged Properties with no title defects or exceptions except for Excepted Liens (other than Excepted Liens described in clauses (e), (g) and (h) of such definition) having an equivalent value or (iii) deliver title information in form and substance acceptable to the Administrative Agent so that the Administrative Agent shall have received, together with title information previously delivered to the Administrative Agent, satisfactory title information on at least 80% of the value of the Oil and Gas Properties evaluated by such Reserve Report. (c) If the Borrower is unable to cure any title defect requested by the Administrative Agent or the Lenders to be cured within the 60-day period or the Borrower does not comply with the requirements to provide acceptable title information covering 80% of the value of the Oil and Gas Properties evaluated in the most recent Reserve Report, such default shall not be a Default, but instead the Administrative Agent and/or the Majority Lenders shall have the right to exercise the following remedy in their sole discretion from time to time, and any failure to so exercise this remedy at any time shall not be a waiver as to future exercise of the remedy by the Administrative Agent or the Lenders. To the extent that the Administrative Agent or the Majority Lenders are not satisfied with title to any Mortgaged Property after the 60-day period has elapsed, such unacceptable Mortgaged Property shall not count towards the 80% requirement, and the Administrative Agent may send a notice to the Borrower and the Lenders that the then outstanding Borrowing Base shall be reduced by an amount as determined by the Majority Lenders to cause the Borrower to be in compliance with the requirement to provide acceptable title information on 80% of the value of the Oil and Gas Properties. This new Borrowing Base shall become effective immediately after receipt of such notice.

  • Surveys Each Borrower shall submit the Ship owned by it regularly to all periodical or other surveys which may be required for classification purposes and, if so required by the Security Trustee provide the Security Trustee, with copies of all survey reports.