Surveying Services – General. A. Control Survey All horizontal control for the project will be based on the Missouri State Plane Coordinate System of 1983, West Zone. All vertical control for the project will be based on the North American Vertical Datum of 1988 (NAVD 88) provided by NOAA’s National Geodetic Survey (NGS). Control points and temporary bench marks will be set inter‐visible and in strategic locations along the project route so as to be conveniently used during all phases of the project, including construction. B. Engineering Survey Provide topographic engineering survey for the length of the project to facilitate design. Provide a survey of all existing surface and sub‐surface utilities in the project corridor. C. Property Boundary Survey/Right‐of‐way Survey/Easements Provide a boundary survey or surveys to locate the existing Right‐of‐Way/Easements for the length of the project, the adjacent property lines of the parcels along the project, and all existing easements of record encumbering each property that will affect the project. Consultant will be responsible for ordering title work for each parcel along the project route and procuring existing right‐of‐way documents and/or right‐of‐ way plans. D. Right‐of‐way and Easement Description Preparation Upon final approval of the Right‐of‐Way/Project Plans consultant will provide descriptions and exhibit drawings for all property right acquisitions including, but not limited to: right‐of‐way takings, permanent easements and temporary easements. E. Right‐of‐
Appears in 2 contracts
Sources: Professional Services, Engineering Services Agreement