SUSA Table Clause Samples

SUSA Table. SUSA (Sub-system Under Safety Analysis) table is typically used during safety analysis activity. The aim of a SUSA table is to highlight and to list the components/systems involved in the item under safety analysis, that is, everything inside the boundary, with inclusion of the interfaces. In general, each element of the list has not only to be identified in terms of name/description/etc., but it has to be classified in terms of development category as following: 01. 001 Electric Vehicle Controller Interlock Disconnecting high voltage supply Involved 01. 002 Power Electronic Interlock Disconnecting high voltage supply Interface 01.003 Motor Interlock Disconnecting high voltage supply Interface 01.004 Battery Interlock Disconnecting high voltage supply Interface 01.005 HVJB Interlock Disconnecting high voltage supply Involved 01. 006 Driving Mode Selector Driving mode selection Selecting the driving mode Involved 01. 007 Brake Pedal Driving mode selection Selecting the driving mode Involved 01.008 Accelerator sensor Driving mode selection Selecting the driving mode Interface 01.009 CAN CAN network Involved
SUSA Table. Element 01. 001 Brake Pedal Sensor Braking Measuring brake pedal position Involved 01. 002 Vehicle Speed Sensor Braking Measuring vehicle longitudinal velocity Involved 01. 003 Wheel Speed Sensor x4 Braking Measuring angular velocity of each wheel Involved 01. 004 Brake Torque Calculator Braking Computeing driver required torque Involved 01.005 Brake Controller Braking Computing required torque on each wheel Involved 01.006 ABS Controller x4 Braking Computing reqired braking toque through braking dic and electrical motor for a wheel Involved 01.007 Local Power Electronic Control Function x4 Braking Computing the maximum possible braking torque by electrical motor and power conversion behavior. Involved 01. 008 Brake Actuator x4 Braking Controlling brake torque through brake disc Involved 01. 009/ 02.001 Power Conversion Actuator x4 Braking Controlling brake torque through electrical motor Involved 02.001/ 01.009 Power Conversion Actuator x4 BPR (Braking Power Regeneration) Controlling power regeneration with braking through electrical motor Involved 02. 002 Load Current Sensor x4 BPR, Braking Measuring motor load on each wheel in terms of electrical stream. Involved
SUSA Table. 14 2.1.5 Use Cases 14 2.2.1 Block Diagram 17 2.2.2 Functions Description 18

Related to SUSA Table

  • Payments from Available Funds Only All payments to be made by the Borrower under this Agreement shall be made only from the amounts that constitute Scheduled Payments, Special Payments and other payments under the Operative Agreements, including payment under Section 4.02 of the Participation Agreements and payments under Section 2.14 of the Indentures, and only to the extent that the Borrower shall have sufficient income or proceeds therefrom to enable the Borrower to make payments in accordance with the terms hereof after giving effect to the priority of payments provisions set forth in the Intercreditor Agreement. The Liquidity Provider agrees that it will look solely to such amounts to the extent available for distribution to it as provided in the Intercreditor Agreement and this Agreement and that the Borrower, in its individual capacity, is not personally liable to it for any amounts payable or liability under this Agreement except as expressly provided in this Agreement, the Intercreditor Agreement or any Participation Agreement. Amounts on deposit in the Class A Cash Collateral Account shall be available to the Borrower to make payments under this Agreement only to the extent and for the purposes expressly contemplated in Section 3.05(f) of the Intercreditor Agreement.

  • Historical Performance Information To the extent agreed upon by the parties, the Sub-Advisor will provide the Trust with historical performance information on similarly managed investment companies or for other accounts to be included in the Prospectus or for any other uses permitted by applicable law.

  • QUANTITY CHANGES PRIOR TO AWARD The Commissioner reserves the right, at any time prior to the award of a specific quantity Contract, to alter in good faith the quantities listed in the Bid Specifications. In the event such right is exercised, the lowest responsible Bidder meeting Bid Specifications will be advised of the revised quantities and afforded an opportunity to extend or reduce its Bid price in relation to the changed quantities. Refusal by the low Bidder to so extend or reduce its Bid price may result in the rejection of its Bid and the award of such Contract to the lowest responsible Bidder who accepts the revised qualifications.

  • Distribution and Pool Performance Information Item 1121(a) - Distribution and Pool Performance Information

  • Amortization Schedule We do not provide an initial amortization schedule at the time of project agreement release but maintain a "Loan Summary Spreadsheet" on our website on the Financial Tab under "Loans". Once your loan is put into billing an amortization schedule will be posted to the same website, with a copy mailed to the Chief Financial Officer the month following project closeout.