Synchronization, Commissioning and Commercial Operation. 5.1.1 The BESSD shall give the concerned RLDC/SLDC, SECI and also KSEBL / Buying Entity (ies) at least sixty (60) days’ advanced preliminary written notice and at least thirty (30) days’ advanced final written notice, of the date on which it intends to synchronize the Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Project may be synchronized by the BESSD to the Grid System with permission from KSEBL and in presence of Authorized Representative of KSEBL, when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU / any other equipment for charge and discharge of power from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the BESSD at its facility of the Project at its own cost. The BESSD shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/Grid System and checking/verification is made by the concerned authorities of the Grid System and RLDC, in line with the provisions of the Grid Code. 5.1.4 The BESSD shall immediately after each synchronization/tripping of system, inform the sub-station of the Grid System to which the Project is electrically connected in accordance with applicable Grid Code under intimation to SECI. In addition, the BESSD at its own risk and cost, will be required to arrange for the charging and discharging of power for carrying to carry out operational/ functional test prior to commercial operation as well as for commissioning of the Project. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The BESSD shall commission the Project as detailed in “Schedule 3: Commissioning Procedure” within Fifteen (15) Months from the Effective Date of BESPA. Declaration of COD / UCOD shall only be done subject to the demonstration of the compliances as per Schedule-3. 5.1.6 Part commissioning of the Project, without imposition of any liquidated damages in terms of the BESPA, shall be accepted by SECI subject to the condition that the minimum part commissioning capacity for the 1st part will be 50% of the specified MWh Capacity (250MWh) at the project location. The total number of instalments in which a Project can be commissioned will be not more than 3, i.e., 1st initial instalment of 50% of the specified MWh Capacity at the project location and 2 subsequent instalments. However, the SCD will not get altered due to part commissioning. Irrespective of dates of part commissioning or full commissioning, the BESPA will remain in force for the Term as defined in this Agreement. 5.1.7 The Parties agree that for the purpose of commencement of the ▇▇▇▇ capacity by the BESSD to SECI, liquidated damages for delay etc., the Scheduled Commissioning Date (or extended Scheduled Commissioning Date) as defined in this Agreement shall be the relevant date. 5.1.8 At least 30 days prior to trial run of the Project, the BESSD shall submit requisite documents as per KSERC’s latest Grid Connectivity and Intra-state Open Access Regulations and amendments thereto, – i. Intimation regarding the timeline for commencement of supply of power from the Project. ii. Copy of CON-4 report submitted to STU (If applicable). iii. Installation report duly signed by the authorized signatory. The BESSD is advised to take due care in furnishing such Installation Report. iv. CEI/CEIG/State Electrical Inspectorate (as applicable) report containing approval for all the components, including Batteries, inverters, transformers, transmission system and protection system, along with all annexures/attachments. It would be the responsibility of the BESSD to obtain the certificate. v. Approval of metering arrangement/scheme from KSEBL /STU or any other concerned authority as applicable. vi. Plant Layout, Plant (AC & DC) SLD. vii. Affidavit certifying that the BESSD has obtained all the necessary approvals for commencement of power supply from the Project, and indemnifying SECI against any discrepancies in the above details. viii. Affidavit from the BESSD certifying possession of land identified for the Project, bearing the details of such land parcels where Project is located, and indemnifying SECI against any discrepancies in the above details. ix. Documents to establish the compliance of technical requirement as per BESPA/RfS. x. Invoices against purchase of the Batteries, Inverters/PCUs, SCADA and BMS along with the summary sheet containing the list of all the invoices, inverters including details and number of items. Lorry Receipts for delivery of Project components at site along with certified summary sheet by the authorized signatory. It is clarified that SECI shall bear no responsibility in declaration of commissioning/COD of the Project. However, on the basis of above documents, the BESSD shall be required to obtain No-objection certificate (NOC)/BESPA Compliance Certificate from SECI prior to declaration of commissioning/COD of the Project. SECI’s scope will be limited to verifying the installation of rated capacity (ies) of the Project, as per the COD certificate submitted by the BESSD. This verification will be at SECI’s discretion and shall not constitute any certification/confirmation of commissioning/COD of the Project by SECI. Prior to declaration of commencement of power supply, the BESSD shall submit COD certificate for the corresponding Installed Capacity which has commenced power supply to SECI as part of the requisite documents.
Appears in 1 contract
Synchronization, Commissioning and Commercial Operation. 5.1.1 The BESSD shall give the concerned RLDC/SLDC, SECI GEDA, GETCO and also KSEBL / Buying Entity (ies) GUVNL at least sixty (60) days’ advanced preliminary written notice and at least thirty (30) days’ advanced final written notice, of the date on which it intends to synchronize the Project to the Grid System.
5.1.2 Subject to Article 5.1.1, the Project may be synchronized by the BESSD to the Grid System with permission from KSEBL and in presence of Authorized Representative of KSEBL, when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System.
5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU / any other equipment for charge and discharge of power from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the BESSD at its facility of the Project at its own cost. The BESSD shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/Grid System and checking/verification is made by the concerned authorities of the Grid System and RLDC, in line with the provisions of the Grid CodeSystem.
5.1.4 The BESSD shall immediately after each synchronization/tripping of system, inform the sub-station of the Grid System to which the Project is electrically connected in accordance with applicable Grid Code under intimation to SECIGUVNL. In addition, the BESSD at its own risk and cost, will be required to arrange for the charging and discharging of power for carrying to carry out operational/ functional test prior to commercial operation as well as for commissioning of the Project. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project.
5.1.5 The BESSD shall commission the Project as detailed in “Schedule 3Schedule-D: Commissioning Procedure” within Fifteen eighteen (1518) Months from of the Effective Date of BESPA. Declaration of COD / UCOD shall only be done by GEDA subject to the demonstration of the compliances as per Schedule-3.Schedule-D.
5.1.6 Part commissioning of the Project, without imposition of any liquidated damages in terms of the BESPA, shall be accepted by SECI GUVNL subject to the condition that the minimum part commissioning capacity for the 1st part will be 70 MW or 50% of Project Capacity, whichever is lower, without prejudice to the specified MWh Capacity (250MWh) at imposition of penalty on the project locationpart which is not commissioned. The total number of instalments in which a Project can be commissioned will be not more than 3, i.e., 1st initial instalment of 70 MW or 50% of the specified MWh Capacity at project capacity as the project location case may be and 2 subsequent instalments. However, the SCD will not get altered due to part commissioning. Irrespective of dates of part commissioning or full commissioning, the BESPA will remain in force for the Term as defined in this Agreement.
5.1.7 The Parties agree that for the purpose of commencement of the ▇▇▇▇ capacity by the BESSD to SECIGUVNL, liquidated damages for delay etc., the Scheduled Commissioning Date (or extended Scheduled Commissioning Date) as defined in this Agreement shall be the relevant date.
5.1.8 At least 30 days prior to trial run of the Project, the BESSD shall submit requisite documents as per KSERC’s latest Grid Connectivity and Intra-state Open Access Regulations and amendments thereto, –
i. Intimation regarding the timeline for commencement of supply of power from the Project.
ii. Copy of CON-4 report submitted to STU (If applicable).
iii. Installation report duly signed by the authorized signatory. The BESSD is advised to take due care in furnishing such Installation Report.
iv. CEI/CEIG/State Electrical Inspectorate (as applicable) report containing approval for all the components, including Batteries, inverters, transformers, transmission system and protection system, along with all annexures/attachments. It would be the responsibility of the BESSD to obtain the certificate.
v. Approval of metering arrangement/scheme from KSEBL /STU or any other concerned authority as applicable.
vi. Plant Layout, Plant (AC & DC) SLD.
vii. Affidavit certifying that the BESSD has obtained all the necessary approvals for commencement of power supply from the Project, and indemnifying SECI against any discrepancies in the above details.
viii. Affidavit from the BESSD certifying possession of land identified for the Project, bearing the details of such land parcels where Project is located, and indemnifying SECI against any discrepancies in the above details.
ix. Documents to establish the compliance of technical requirement as per BESPA/RfS.
x. Invoices against purchase of the Batteries, Inverters/PCUs, SCADA and BMS along with the summary sheet containing the list of all the invoices, inverters including details and number of items. Lorry Receipts for delivery of Project components at site along with certified summary sheet by the authorized signatory. It is clarified that SECI shall bear no responsibility in declaration of commissioning/COD of the Project. However, on the basis of above documents, the BESSD shall be required to obtain No-objection certificate (NOC)/BESPA Compliance Certificate from SECI prior to declaration of commissioning/COD of the Project. SECI’s scope will be limited to verifying the installation of rated capacity (ies) of the Project, as per the COD certificate submitted by the BESSD. This verification will be at SECI’s discretion and shall not constitute any certification/confirmation of commissioning/COD of the Project by SECI. Prior to declaration of commencement of power supply, the BESSD shall submit COD certificate for the corresponding Installed Capacity which has commenced power supply to SECI as part of the requisite documents.
Appears in 1 contract
Synchronization, Commissioning and Commercial Operation. 5.1.1 The BESSD WPD shall give the concerned RLDC/SLDC, SLDC and SECI and also KSEBL / Buying Entity (ies) at least sixty (60) days’ advanced preliminary written notice and at least thirty (30) days’ advanced final written notice, of the date on which it intends to synchronize the Power Project to the Grid System.
5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the BESSD WPD to the Grid System with permission from KSEBL and in presence of Authorized Representative of KSEBL, when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System.
5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU / any other equipment for charge and discharge scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the BESSD WPD at its generation facility of the Power Project at its own cost. The BESSD WPD shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/Grid System and checking/verification is made by the concerned authorities of the Grid System and RLDC, in line with the provisions of the Grid CodeSystem.
5.1.4 The BESSD WPD shall immediately after each synchronization/tripping of systemgenerator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code under intimation to SECI. In addition, the BESSD at its own risk and cost, WPD will be required inject in-firm power to arrange for the charging and discharging of power for carrying grid time to time to carry out operational/ functional test prior to commercial operation as well as for commissioning of the Projectoperation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project.
5.1.5 The BESSD WPD shall commission the Project as detailed in “Schedule 3: Commissioning Procedure” within Fifteen twenty-four (1524) Months from of the Effective Date of BESPAPPA or the Effective Date of PSA, whichever is later, . Declaration of COD / UCOD shall only be done subject to the demonstration of the compliances as per Schedule-3Schedule-3 and subsequent upon the successful visit by the Commissioning Committee.
5.1.6 There can be part Commissioning of the Project. Part commissioning of the Project, without imposition of any liquidated damages in terms of the BESPA, project shall be accepted by SECI subject mean that all equipment corresponding to the condition that part capacity have been installed and commissioned and corresponding energy has flown into the minimum part commissioning capacity for the 1st part will be 50% of the specified MWh Capacity (250MWh) at the project location. The total number of instalments in which a Project can be commissioned will be not more than 3, i.e., 1st initial instalment of 50% of the specified MWh Capacity at the project location and 2 subsequent instalments. However, the SCD will not get altered due to part commissioning. Irrespective of dates of part commissioning or full commissioning, the BESPA will remain in force for the Term as defined in this Agreementgrid.
5.1.7 The Parties agree that for the purpose of commencement of the ▇▇▇▇ capacity supply of electricity by the BESSD WPD to SECI, liquidated damages for delay etc., the Scheduled Commissioning Date (or extended Scheduled Commissioning Date) as defined in this Agreement shall be the relevant date.
5.1.8 At least 30 days prior to trial run of the Project, the BESSD shall submit requisite documents as per KSERC’s latest Grid Connectivity and Intra-state Open Access Regulations and amendments thereto, –
i. Intimation regarding the timeline for commencement of supply of power from the Project.
ii. Copy of CON-4 report submitted to STU (If applicable).
iii. Installation report duly signed by the authorized signatory. The BESSD is advised to take due care in furnishing such Installation Report.
iv. CEI/CEIG/State Electrical Inspectorate (as applicable) report containing approval for all the components, including Batteries, inverters, transformers, transmission system and protection system, along with all annexures/attachments. It would be the responsibility of the BESSD to obtain the certificate.
v. Approval of metering arrangement/scheme from KSEBL /STU or any other concerned authority as applicable.
vi. Plant Layout, Plant (AC & DC) SLD.
vii. Affidavit certifying that the BESSD has obtained all the necessary approvals for commencement of power supply from the Project, and indemnifying SECI against any discrepancies in the above details.
viii. Affidavit from the BESSD certifying possession of land identified for the Project, bearing the details of such land parcels where Project is located, and indemnifying SECI against any discrepancies in the above details.
ix. Documents to establish the compliance of technical requirement as per BESPA/RfS.
x. Invoices against purchase of the Batteries, Inverters/PCUs, SCADA and BMS along with the summary sheet containing the list of all the invoices, inverters including details and number of items. Lorry Receipts for delivery of Project components at site along with certified summary sheet by the authorized signatory. It is clarified that SECI shall bear no responsibility in declaration of commissioning/COD of the Project. However, on the basis of above documents, the BESSD shall be required to obtain No-objection certificate (NOC)/BESPA Compliance Certificate from SECI prior to declaration of commissioning/COD of the Project. SECI’s scope will be limited to verifying the installation of rated capacity (ies) of the Project, as per the COD certificate submitted by the BESSD. This verification will be at SECI’s discretion and shall not constitute any certification/confirmation of commissioning/COD of the Project by SECI. Prior to declaration of commencement of power supply, the BESSD shall submit COD certificate for the corresponding Installed Capacity which has commenced power supply to SECI as part of the requisite documents.
Appears in 1 contract
Sources: Power Purchase Agreement
Synchronization, Commissioning and Commercial Operation. 5.1.1 The BESSD WPD shall give the concerned RLDC/SLDC, SLDC and SECI and also KSEBL / Buying Entity (ies) at least sixty (60) days’ advanced preliminary written notice and at least thirty (30) days’ advanced final written notice, of the date on which it intends to synchronize the Power Project to the Grid System.
5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the BESSD WPD to the Grid System with permission from KSEBL and in presence of Authorized Representative of KSEBL, when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System.
5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU / any other equipment for charge and discharge scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the BESSD WPD at its generation facility of the Power Project at its own cost. The BESSD WPD shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/Grid System and checking/verification is made by the concerned authorities of the Grid System and RLDC, in line with the provisions of the Grid CodeSystem.
5.1.4 The BESSD WPD shall immediately after each synchronization/tripping of systemgenerator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code under intimation to SECI. In addition, the BESSD at its own risk and cost, WPD will be required inject in-firm power to arrange for the charging and discharging of power for carrying grid time to time to carry out operational/ functional test prior to commercial operation as well as for commissioning of the Projectoperation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project.
5.1.5 The BESSD WPD shall commission the Project as detailed in “Schedule 3: Commissioning Procedure” within Fifteen twenty-four (1524) Months from of the Effective Date of BESPAPPA or the Effective Date of PSA, whichever is later. Declaration of COD / UCOD shall only be done subject to the demonstration of the compliances as per Schedule-3Schedule-3 and subsequent upon the successful visit by the Commissioning Committee. It is clarified that in case the Detailed Procedure under the GNA regulations are not enforced until the Project commissioning, the WPD and the Buying Entity(ies) shall abide by the current Procedure under applicable CERC regulations. In such a scenario, the responsibility of obtaining LTA will be that of the WPD. In the alternate scenario, no such requirement will be applicable on the WPD.
5.1.6 There can be part Commissioning of the Project. Part commissioning of the Project, without imposition of any liquidated damages in terms of the BESPA, project shall be accepted by SECI subject mean that all equipment corresponding to the condition that part capacity have been installed and commissioned and corresponding energy has flown into the minimum part commissioning capacity for the 1st part will be 50% of the specified MWh Capacity (250MWh) at the project location. The total number of instalments in which a Project can be commissioned will be not more than 3, i.e., 1st initial instalment of 50% of the specified MWh Capacity at the project location and 2 subsequent instalments. However, the SCD will not get altered due to part commissioning. Irrespective of dates of part commissioning or full commissioning, the BESPA will remain in force for the Term as defined in this Agreementgrid.
5.1.7 The Parties agree that for the purpose of commencement of the ▇▇▇▇ capacity supply of electricity by the BESSD WPD to SECI, liquidated damages for delay etc., the Scheduled Commissioning Date (or extended Scheduled Commissioning Date) Date as defined in this Agreement shall be the relevant date.
5.1.8 At least 30 days prior to trial run of the Project, the BESSD shall submit requisite documents as per KSERC’s latest Grid Connectivity and Intra-state Open Access Regulations and amendments thereto, –
i. Intimation regarding the timeline for commencement of supply of power from the Project.
ii. Copy of CON-4 report submitted to STU (If applicable).
iii. Installation report duly signed by the authorized signatory. The BESSD is advised to take due care in furnishing such Installation Report.
iv. CEI/CEIG/State Electrical Inspectorate (as applicable) report containing approval for all the components, including Batteries, inverters, transformers, transmission system and protection system, along with all annexures/attachments. It would be the responsibility of the BESSD to obtain the certificate.
v. Approval of metering arrangement/scheme from KSEBL /STU or any other concerned authority as applicable.
vi. Plant Layout, Plant (AC & DC) SLD.
vii. Affidavit certifying that the BESSD has obtained all the necessary approvals for commencement of power supply from the Project, and indemnifying SECI against any discrepancies in the above details.
viii. Affidavit from the BESSD certifying possession of land identified for the Project, bearing the details of such land parcels where Project is located, and indemnifying SECI against any discrepancies in the above details.
ix. Documents to establish the compliance of technical requirement as per BESPA/RfS.
x. Invoices against purchase of the Batteries, Inverters/PCUs, SCADA and BMS along with the summary sheet containing the list of all the invoices, inverters including details and number of items. Lorry Receipts for delivery of Project components at site along with certified summary sheet by the authorized signatory. It is clarified that SECI shall bear no responsibility in declaration of commissioning/COD of the Project. However, on the basis of above documents, the BESSD shall be required to obtain No-objection certificate (NOC)/BESPA Compliance Certificate from SECI prior to declaration of commissioning/COD of the Project. SECI’s scope will be limited to verifying the installation of rated capacity (ies) of the Project, as per the COD certificate submitted by the BESSD. This verification will be at SECI’s discretion and shall not constitute any certification/confirmation of commissioning/COD of the Project by SECI. Prior to declaration of commencement of power supply, the BESSD shall submit COD certificate for the corresponding Installed Capacity which has commenced power supply to SECI as part of the requisite documents.
Appears in 1 contract
Sources: Power Purchase Agreement
Synchronization, Commissioning and Commercial Operation. 5.1.1 The BESSD SPD shall give the concerned RLDC/SLDC, SLDC and SECI and also KSEBL / Buying Entity (ies) at least sixty (60) days’ advanced preliminary written notice and at least thirty (30) days’ advanced final written notice, of the date on which it intends to synchronize the Power Project to the Grid System.
5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the BESSD SPD to the Grid System with permission from KSEBL and in presence of Authorized Representative of KSEBL, when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System.
5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU / any other equipment for charge and discharge scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the BESSD SPD at its generation facility of the Power Project at its own cost. The BESSD SPD shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/Grid System and checking/verification is made by the concerned authorities of the Grid System and RLDC, in line with the provisions of the Grid CodeSystem.
5.1.4 The BESSD SPD shall immediately after each synchronization/tripping of systemgenerator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code under intimation to SECI. In addition, the BESSD at its own risk and cost, SPD will be required inject in-firm power to arrange for the charging and discharging of power for carrying grid time to time to carry out operational/ functional test prior to commercial operation as well as for commissioning of the Projectoperation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project.
5.1.5 The BESSD SPD shall commission the Project as detailed in “Schedule 36: Commissioning Procedure” within Fifteen eighteen (1518) Months from the Effective Date of BESPADate. Declaration of COD / UCOD shall only be done subject to the demonstration of the compliances as per Schedule-3Schedule-6 and subsequent upon the successful visit by the Commissioning Committee.
5.1.6 Part commissioning There can be part Commissioning of the Project, without imposition of any liquidated damages in terms project. Part Commissioning of the BESPA, project shall be accepted by SECI subject mean that all equipment corresponding to the condition that part capacity have been installed and commissioned and corresponding energy has flown into the minimum part commissioning capacity for the 1st part will be 50% of the specified MWh Capacity (250MWh) at the project location. The total number of instalments in which a Project can be commissioned will be not more than 3, i.e., 1st initial instalment of 50% of the specified MWh Capacity at the project location and 2 subsequent instalments. However, the SCD will not get altered due to part commissioning. Irrespective of dates of part commissioning or full commissioning, the BESPA will remain in force for the Term as defined in this Agreementgrid.
5.1.7 The Parties agree that for the purpose of commencement of the ▇▇▇▇ capacity supply of electricity by the BESSD SPD to SECI, liquidated damages for delay etc., the Scheduled Commissioning Date (or extended Scheduled Commissioning Date) as defined in this Agreement shall be the relevant date.
5.1.8 At least 30 days prior to trial run of the Project, the BESSD shall submit requisite documents as per KSERC’s latest Grid Connectivity and Intra-state Open Access Regulations and amendments thereto, –
i. Intimation regarding the timeline for commencement of supply of power from the Project.
ii. Copy of CON-4 report submitted to STU (If applicable).
iii. Installation report duly signed by the authorized signatory. The BESSD is advised to take due care in furnishing such Installation Report.
iv. CEI/CEIG/State Electrical Inspectorate (as applicable) report containing approval for all the components, including Batteries, inverters, transformers, transmission system and protection system, along with all annexures/attachments. It would be the responsibility of the BESSD to obtain the certificate.
v. Approval of metering arrangement/scheme from KSEBL /STU or any other concerned authority as applicable.
vi. Plant Layout, Plant (AC & DC) SLD.
vii. Affidavit certifying that the BESSD has obtained all the necessary approvals for commencement of power supply from the Project, and indemnifying SECI against any discrepancies in the above details.
viii. Affidavit from the BESSD certifying possession of land identified for the Project, bearing the details of such land parcels where Project is located, and indemnifying SECI against any discrepancies in the above details.
ix. Documents to establish the compliance of technical requirement as per BESPA/RfS.
x. Invoices against purchase of the Batteries, Inverters/PCUs, SCADA and BMS along with the summary sheet containing the list of all the invoices, inverters including details and number of items. Lorry Receipts for delivery of Project components at site along with certified summary sheet by the authorized signatory. It is clarified that SECI shall bear no responsibility in declaration of commissioning/COD of the Project. However, on the basis of above documents, the BESSD shall be required to obtain No-objection certificate (NOC)/BESPA Compliance Certificate from SECI prior to declaration of commissioning/COD of the Project. SECI’s scope will be limited to verifying the installation of rated capacity (ies) of the Project, as per the COD certificate submitted by the BESSD. This verification will be at SECI’s discretion and shall not constitute any certification/confirmation of commissioning/COD of the Project by SECI. Prior to declaration of commencement of power supply, the BESSD shall submit COD certificate for the corresponding Installed Capacity which has commenced power supply to SECI as part of the requisite documents.
Appears in 1 contract
Sources: Power Purchase Agreement
Synchronization, Commissioning and Commercial Operation. 5.1.1 The BESSD shall give the concerned RLDC/SLDC, SECI MEDA, MSEDCL/MSETCL and also KSEBL / Buying Entity (ies) MSEDCL at least sixty (60) days’ advanced preliminary written notice and at least thirty (30) days’ advanced final written notice, of the date on which it intends to synchronize the Project to the Grid System.
5.1.2 Subject to Article 5.1.1, the Project may be synchronized by the BESSD to the Grid System with permission from KSEBL and in presence of Authorized Representative of KSEBL, when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System.
5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU / any other equipment for charge and discharge of power from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the BESSD at its facility of the Project at its own cost. The BESSD shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/Grid System and checking/verification is made by the concerned authorities of the Grid System and RLDC, in line with the provisions of the Grid CodeSystem.
5.1.4 The BESSD shall immediately after each synchronization/tripping of system, inform the sub-station of the Grid System to which the Project is electrically connected in accordance with applicable Grid Code under intimation to SECIMSEDCL. In addition, the BESSD at its own risk and cost, will be required to arrange for the charging and discharging of power for carrying to carry out operational/ functional test prior to commercial operation as well as for commissioning of the Project. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project.
5.1.5 The BESSD shall commission the Project as detailed in “Schedule 3Schedule-D: Commissioning Procedure” within Fifteen eighteen (1518) Months from of the Effective Date of BESPA. Declaration of COD / UCOD shall only be done by MEDA subject to the demonstration of the compliances as per Schedule-3.Schedule-D.
5.1.6 Part commissioning of the Project, without imposition of any liquidated damages in terms of the BESPA, shall be accepted by SECI MSEDCL subject to the condition that the minimum part commissioning capacity for the 1st part will be 50 MW or 50% of Project Capacity, whichever is lower, without prejudice to the specified MWh Capacity (250MWh) at imposition of penalty on the project locationpart which is not commissioned. The total number of instalments in which a Project can be commissioned will be not more than 3, i.e., 1st initial instalment of 50 MW or 50% of the specified MWh Capacity at project capacity as the project location case may be and 2 subsequent instalments. .
5.1.7 However, the SCD will not get altered due to part commissioning. Irrespective of dates of part commissioning or full commissioning, the BESPA will remain in force for the Term as defined in this Agreement.
5.1.7 5.1.8 The Parties agree that for the purpose of commencement of the ▇▇▇▇ capacity by the BESSD to SECIMSEDCL, liquidated damages for delay etc., the Scheduled Commissioning Date (or extended Scheduled Commissioning Date) as defined in this Agreement shall be the relevant date.
5.1.8 At least 30 days prior to trial run of the Project, the BESSD shall submit requisite documents as per KSERC’s latest Grid Connectivity and Intra-state Open Access Regulations and amendments thereto, –
i. Intimation regarding the timeline for commencement of supply of power from the Project.
ii. Copy of CON-4 report submitted to STU (If applicable).
iii. Installation report duly signed by the authorized signatory. The BESSD is advised to take due care in furnishing such Installation Report.
iv. CEI/CEIG/State Electrical Inspectorate (as applicable) report containing approval for all the components, including Batteries, inverters, transformers, transmission system and protection system, along with all annexures/attachments. It would be the responsibility of the BESSD to obtain the certificate.
v. Approval of metering arrangement/scheme from KSEBL /STU or any other concerned authority as applicable.
vi. Plant Layout, Plant (AC & DC) SLD.
vii. Affidavit certifying that the BESSD has obtained all the necessary approvals for commencement of power supply from the Project, and indemnifying SECI against any discrepancies in the above details.
viii. Affidavit from the BESSD certifying possession of land identified for the Project, bearing the details of such land parcels where Project is located, and indemnifying SECI against any discrepancies in the above details.
ix. Documents to establish the compliance of technical requirement as per BESPA/RfS.
x. Invoices against purchase of the Batteries, Inverters/PCUs, SCADA and BMS along with the summary sheet containing the list of all the invoices, inverters including details and number of items. Lorry Receipts for delivery of Project components at site along with certified summary sheet by the authorized signatory. It is clarified that SECI shall bear no responsibility in declaration of commissioning/COD of the Project. However, on the basis of above documents, the BESSD shall be required to obtain No-objection certificate (NOC)/BESPA Compliance Certificate from SECI prior to declaration of commissioning/COD of the Project. SECI’s scope will be limited to verifying the installation of rated capacity (ies) of the Project, as per the COD certificate submitted by the BESSD. This verification will be at SECI’s discretion and shall not constitute any certification/confirmation of commissioning/COD of the Project by SECI. Prior to declaration of commencement of power supply, the BESSD shall submit COD certificate for the corresponding Installed Capacity which has commenced power supply to SECI as part of the requisite documents.
Appears in 1 contract
Synchronization, Commissioning and Commercial Operation. 5.1.1 The BESSD SPD shall give the concerned RLDC/SLDC, SLDC and SECI and also KSEBL / Buying Entity (ies) at least sixty (60) days’ advanced preliminary written notice and at least thirty (30) days’ advanced final written notice, of the date on which it intends to synchronize the Power Project to the Grid System.
5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the BESSD SPD to the Grid System with permission from KSEBL and in presence of Authorized Representative of KSEBL, when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System.
5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU / any other equipment for charge and discharge scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the BESSD SPD at its generation facility of the Power Project at its own cost. The BESSD SPD shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/Grid System and checking/verification is made by the concerned authorities of the Grid System and RLDC, in line with the provisions of the Grid CodeSystem.
5.1.4 The BESSD SPD shall immediately after each synchronization/tripping of systemgenerator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code under intimation to SECI. In addition, the BESSD at its own risk and cost, SPD will be required inject in-firm power to arrange for the charging and discharging of power for carrying grid time to time to carry out operational/ functional test prior to commercial operation as well as for commissioning of the Projectoperation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project.
5.1.5 The BESSD SPD shall commission the Project as detailed in “Schedule 3: Commissioning Procedure” within Fifteen eighteen (1518) Months from of the Effective Date of BESPADate. Declaration of COD / UCOD shall only be done subject to the demonstration of the compliances as per Schedule-3Schedule-3 and subsequent upon the successful visit by the Commissioning Committee.
5.1.6 There can be part Commissioning of the Project. Part commissioning of the Project, without imposition of any liquidated damages in terms of the BESPA, project shall be accepted by SECI subject mean that all equipment corresponding to the condition that part capacity have been installed and commissioned and corresponding energy has flown into the minimum part commissioning capacity for the 1st part will be 50% of the specified MWh Capacity (250MWh) at the project location. The total number of instalments in which a Project can be commissioned will be not more than 3, i.e., 1st initial instalment of 50% of the specified MWh Capacity at the project location and 2 subsequent instalments. However, the SCD will not get altered due to part commissioning. Irrespective of dates of part commissioning or full commissioning, the BESPA will remain in force for the Term as defined in this Agreementgrid.
5.1.7 The Parties agree that for the purpose of commencement of the ▇▇▇▇ capacity supply of electricity by the BESSD SPD to SECI, liquidated damages for delay etc., the Scheduled Commissioning Date (or extended Scheduled Commissioning Date) as defined in this Agreement shall be the relevant date.
5.1.8 At least 30 days prior to trial run of the Project, the BESSD shall submit requisite documents as per KSERC’s latest Grid Connectivity and Intra-state Open Access Regulations and amendments thereto, –
i. Intimation regarding the timeline for commencement of supply of power from the Project.
ii. Copy of CON-4 report submitted to STU (If applicable).
iii. Installation report duly signed by the authorized signatory. The BESSD is advised to take due care in furnishing such Installation Report.
iv. CEI/CEIG/State Electrical Inspectorate (as applicable) report containing approval for all the components, including Batteries, inverters, transformers, transmission system and protection system, along with all annexures/attachments. It would be the responsibility of the BESSD to obtain the certificate.
v. Approval of metering arrangement/scheme from KSEBL /STU or any other concerned authority as applicable.
vi. Plant Layout, Plant (AC & DC) SLD.
vii. Affidavit certifying that the BESSD has obtained all the necessary approvals for commencement of power supply from the Project, and indemnifying SECI against any discrepancies in the above details.
viii. Affidavit from the BESSD certifying possession of land identified for the Project, bearing the details of such land parcels where Project is located, and indemnifying SECI against any discrepancies in the above details.
ix. Documents to establish the compliance of technical requirement as per BESPA/RfS.
x. Invoices against purchase of the Batteries, Inverters/PCUs, SCADA and BMS along with the summary sheet containing the list of all the invoices, inverters including details and number of items. Lorry Receipts for delivery of Project components at site along with certified summary sheet by the authorized signatory. It is clarified that SECI shall bear no responsibility in declaration of commissioning/COD of the Project. However, on the basis of above documents, the BESSD shall be required to obtain No-objection certificate (NOC)/BESPA Compliance Certificate from SECI prior to declaration of commissioning/COD of the Project. SECI’s scope will be limited to verifying the installation of rated capacity (ies) of the Project, as per the COD certificate submitted by the BESSD. This verification will be at SECI’s discretion and shall not constitute any certification/confirmation of commissioning/COD of the Project by SECI. Prior to declaration of commencement of power supply, the BESSD shall submit COD certificate for the corresponding Installed Capacity which has commenced power supply to SECI as part of the requisite documents.
Appears in 1 contract
Sources: Power Purchase Agreement
Synchronization, Commissioning and Commercial Operation. 5.1.1 The BESSD SPD shall give the concerned RLDC/SLDC, SECI and also KSEBL / Buying Entity MSPDCL/ Concerned Authority (iesSLDC as applicable) at least sixty (60) days’ advanced preliminary written notice and at least thirty (30) days’ sptretlhiimritnyar(y30w)ri advanced final written notice, of the date on which it intends to synchronize the Power Project to the Grid System.
5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the BESSD SPD to the Grid System with permission from KSEBL and in presence of Authorized Representative of KSEBL, when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System.
5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU / any other equipment for charge and discharge scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall regulationshall be installed by the BESSD SPD at its generation facility of the Power Project at its own cost. The BESSD SPD shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/Grid System and checking/verification is made by the concerned authorities of the Grid System and RLDC, in line with the provisions of the Grid CodeSystem.
5.1.4 The BESSD SPD shall immediately after each synchronization/tripping of systemgenerator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code under intimation to SECIMSPDCL. In addition, the BESSD at its own risk and cost, SPD will be required inject in-firm power to arrange for the charging and discharging of power for carrying grid time to time to carry out operational/ functional test prior to commercial operation as well as for commissioning of the Projectoperation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project.
5.1.5 The BESSD SPD shall commission the Project as detailed in “Schedule 3commissio3n: Commissioning Procedure” within Fifteen (15) Months from ComtmhisesioninPg roject Proceduhinreeigh”teenw(0i8)tMonths of the Effective Date of BESPAPPA. Declaration of COD / UCOD shall only be done subject to the demonstration of the compliances as per Schedule-3Schedule-2 and subsequent upon the successful visit by the Commissioning Committee.
5.1.6 Part commissioning of the Project, without imposition of any liquidated damages in terms of the BESPA, Project shall be accepted by SECI subject to the condition that the minimum part commissioning capacity for the 1st part will be 50% of the specified MWh Capacity (250MWh) at the project location▇▇▇▇▇▇▇▇&▇▇▇▇▇▇ in accordance with “Schedule 2: Commoif tshissPiPAo. The total number of instalments in which a Project can be commissioned will be not more than 3, i.e., 1st initial instalment of 50% of the specified MWh Capacity at the project location and 2 subsequent instalments. However, the SCD will not get altered due to part commissioning. Irrespective of dates of part commissioning or full commissioning, the BESPA will remain in force for the Term as defined in this Agreement.ning Procedu
5.1.7 The Parties agree that for the purpose of commencement of the ▇▇▇▇ capacity supply of electricity by the BESSD SPD to SECIMSPDCL, liquidated damages for delay etc., the Scheduled Commissioning Date (or extended Scheduled Commissioning Date) as defined in this Agreement shall be the relevant date.
5.1.8 At least 30 days prior to trial run of the Project, the BESSD shall submit requisite documents as per KSERC’s latest Grid Connectivity and Intra-state Open Access Regulations and amendments thereto, –
i. Intimation regarding the timeline for commencement of supply of power from the Project.
ii. Copy of CON-4 report submitted to STU (If applicable).
iii. Installation report duly signed by the authorized signatory. The BESSD is advised to take due care in furnishing such Installation Report.
iv. CEI/CEIG/State Electrical Inspectorate (as applicable) report containing approval for all the components, including Batteries, inverters, transformers, transmission system and protection system, along with all annexures/attachments. It would be the responsibility of the BESSD to obtain the certificate.
v. Approval of metering arrangement/scheme from KSEBL /STU or any other concerned authority as applicable.
vi. Plant Layout, Plant (AC & DC) SLD.
vii. Affidavit certifying that the BESSD has obtained all the necessary approvals for commencement of power supply from the Project, and indemnifying SECI against any discrepancies in the above details.
viii. Affidavit from the BESSD certifying possession of land identified for the Project, bearing the details of such land parcels where Project is located, and indemnifying SECI against any discrepancies in the above details.
ix. Documents to establish the compliance of technical requirement as per BESPA/RfS.
x. Invoices against purchase of the Batteries, Inverters/PCUs, SCADA and BMS along with the summary sheet containing the list of all the invoices, inverters including details and number of items. Lorry Receipts for delivery of Project components at site along with certified summary sheet by the authorized signatory. It is clarified that SECI shall bear no responsibility in declaration of commissioning/COD of the Project. However, on the basis of above documents, the BESSD shall be required to obtain No-objection certificate (NOC)/BESPA Compliance Certificate from SECI prior to declaration of commissioning/COD of the Project. SECI’s scope will be limited to verifying the installation of rated capacity (ies) of the Project, as per the COD certificate submitted by the BESSD. This verification will be at SECI’s discretion and shall not constitute any certification/confirmation of commissioning/COD of the Project by SECI. Prior to declaration of commencement of power supply, the BESSD shall submit COD certificate for the corresponding Installed Capacity which has commenced power supply to SECI as part of the requisite documents.
Appears in 1 contract
Sources: Power Purchase Agreement
Synchronization, Commissioning and Commercial Operation. 5.1.1 The BESSD HPD shall give the concerned RLDC/SLDC, SLDC and SECI and also KSEBL / Buying Entity (ies) at least sixty (60) days’ advanced preliminary written notice and at least thirty (30) days’ advanced final written notice, of the date on which it intends to synchronize the Power Project to the Grid System.
5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the BESSD HPD to the Grid System with permission from KSEBL and in presence of Authorized Representative of KSEBL, when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System.
5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU / any other equipment for charge and discharge scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the BESSD HPD at its generation facility of the Power Project at its own cost. The BESSD HPD shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/Grid System and checking/verification is made by the concerned authorities of the Grid System and RLDC, in line with the provisions of the Grid CodeSystem.
5.1.4 The BESSD HPD shall immediately after each synchronization/tripping of systemgenerator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code under intimation to SECI. In addition, the BESSD at its own risk and cost, HPD will be required inject in-firm power to arrange for the charging and discharging of power for carrying grid time to time to carry out operational/ functional test prior to commercial operation as well as for commissioning of the Projectoperation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project.
5.1.5 The BESSD HPD shall commission the Project as detailed in “Schedule 36: Commissioning Procedure” within Fifteen (15) Months from the Effective Date of BESPASCD as defined. Declaration of COD / UCOD shall only be done subject to the demonstration of the compliances as per Schedule-3Schedule-6 and subsequent upon the successful visit by the Commissioning Committee.
5.1.6 There can be part-Commissioning of the project. Part commissioning of the Project, without imposition of any liquidated damages in terms of the BESPA, project shall be accepted by SECI subject mean that all equipment corresponding to the condition that part capacity have been installed and commissioned and corresponding energy has flown into the minimum part commissioning capacity for the 1st part will be 50% of the specified MWh Capacity (250MWh) at the project location. The total number of instalments in which a Project can be commissioned will be not more than 3, i.e., 1st initial instalment of 50% of the specified MWh Capacity at the project location and 2 subsequent instalments. However, the SCD will not get altered due to part commissioning. Irrespective of dates of part commissioning or full commissioning, the BESPA will remain in force for the Term as defined in this Agreementgrid.
5.1.7 The Parties agree that for the purpose of commencement of the ▇▇▇▇ capacity supply of electricity by the BESSD HPD to SECI, liquidated damages for delay etc., the Scheduled Commissioning Date (or extended Scheduled Commissioning Date) as defined in this Agreement shall be the relevant date.
5.1.8 At least 30 days prior to trial run of the Project, the BESSD shall submit requisite documents as per KSERC’s latest Grid Connectivity and Intra-state Open Access Regulations and amendments thereto, –
i. Intimation regarding the timeline for commencement of supply of power from the Project.
ii. Copy of CON-4 report submitted to STU (If applicable).
iii. Installation report duly signed by the authorized signatory. The BESSD is advised to take due care in furnishing such Installation Report.
iv. CEI/CEIG/State Electrical Inspectorate (as applicable) report containing approval for all the components, including Batteries, inverters, transformers, transmission system and protection system, along with all annexures/attachments. It would be the responsibility of the BESSD to obtain the certificate.
v. Approval of metering arrangement/scheme from KSEBL /STU or any other concerned authority as applicable.
vi. Plant Layout, Plant (AC & DC) SLD.
vii. Affidavit certifying that the BESSD has obtained all the necessary approvals for commencement of power supply from the Project, and indemnifying SECI against any discrepancies in the above details.
viii. Affidavit from the BESSD certifying possession of land identified for the Project, bearing the details of such land parcels where Project is located, and indemnifying SECI against any discrepancies in the above details.
ix. Documents to establish the compliance of technical requirement as per BESPA/RfS.
x. Invoices against purchase of the Batteries, Inverters/PCUs, SCADA and BMS along with the summary sheet containing the list of all the invoices, inverters including details and number of items. Lorry Receipts for delivery of Project components at site along with certified summary sheet by the authorized signatory. It is clarified that SECI shall bear no responsibility in declaration of commissioning/COD of the Project. However, on the basis of above documents, the BESSD shall be required to obtain No-objection certificate (NOC)/BESPA Compliance Certificate from SECI prior to declaration of commissioning/COD of the Project. SECI’s scope will be limited to verifying the installation of rated capacity (ies) of the Project, as per the COD certificate submitted by the BESSD. This verification will be at SECI’s discretion and shall not constitute any certification/confirmation of commissioning/COD of the Project by SECI. Prior to declaration of commencement of power supply, the BESSD shall submit COD certificate for the corresponding Installed Capacity which has commenced power supply to SECI as part of the requisite documents.
Appears in 1 contract
Sources: Power Purchase Agreement
Synchronization, Commissioning and Commercial Operation. 5.1.1 The BESSD WPD shall give the concerned RLDC/SLDC, SLDC and SECI and also KSEBL / Buying Entity (ies) at least sixty (60) days’ advanced preliminary written notice and at least thirty (30) days’ advanced final written notice, of the date on which it intends to synchronize the Power Project to the Grid System.
5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the BESSD WPD to the Grid System with permission from KSEBL and in presence of Authorized Representative of KSEBL, when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System.
5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU / any other equipment for charge and discharge scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the BESSD WPD at its generation facility of the Power Project at its own cost. The BESSD WPD shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/Grid System and checking/verification is made by the concerned authorities of the Grid System and RLDC, in line with the provisions of the Grid CodeSystem.
5.1.4 The BESSD WPD shall immediately after each synchronization/tripping of systemgenerator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code under intimation to SECI. In addition, the BESSD at its own risk and cost, WPD will be required inject in-firm power to arrange for the charging and discharging of power for carrying grid time to time to carry out operational/ functional test prior to commercial operation as well as for commissioning of the Projectoperation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project.
5.1.5 The BESSD WPD shall commission the Project as detailed in “Schedule 3: Commissioning Procedure” within Fifteen twenty-four (1524) Months from of the Effective Date of BESPAPPA or the Effective Date of PSA, whichever is later. Declaration of COD / UCOD shall only be done subject to the demonstration of the compliances as per Schedule-3Schedule-3 and subsequent upon the successful visit by the Commissioning Committee.
5.1.6 There can be part Commissioning of the Project. Part commissioning of the Project, without imposition of any liquidated damages in terms of the BESPA, project shall be accepted by SECI subject mean that all equipment corresponding to the condition that part capacity have been installed and commissioned and corresponding energy has flown into the minimum part commissioning capacity for the 1st part will be 50% of the specified MWh Capacity (250MWh) at the project location. The total number of instalments in which a Project can be commissioned will be not more than 3, i.e., 1st initial instalment of 50% of the specified MWh Capacity at the project location and 2 subsequent instalments. However, the SCD will not get altered due to part commissioning. Irrespective of dates of part commissioning or full commissioning, the BESPA will remain in force for the Term as defined in this Agreementgrid.
5.1.7 The Parties agree that for the purpose of commencement of the ▇▇▇▇ capacity supply of electricity by the BESSD WPD to SECI, liquidated damages for delay etc., the Scheduled Commissioning Date (or extended Scheduled Commissioning Date) Date as defined in this Agreement shall be the relevant date.
5.1.8 At least 30 days prior to trial run of the Project, the BESSD shall submit requisite documents as per KSERC’s latest Grid Connectivity and Intra-state Open Access Regulations and amendments thereto, –
i. Intimation regarding the timeline for commencement of supply of power from the Project.
ii. Copy of CON-4 report submitted to STU (If applicable).
iii. Installation report duly signed by the authorized signatory. The BESSD is advised to take due care in furnishing such Installation Report.
iv. CEI/CEIG/State Electrical Inspectorate (as applicable) report containing approval for all the components, including Batteries, inverters, transformers, transmission system and protection system, along with all annexures/attachments. It would be the responsibility of the BESSD to obtain the certificate.
v. Approval of metering arrangement/scheme from KSEBL /STU or any other concerned authority as applicable.
vi. Plant Layout, Plant (AC & DC) SLD.
vii. Affidavit certifying that the BESSD has obtained all the necessary approvals for commencement of power supply from the Project, and indemnifying SECI against any discrepancies in the above details.
viii. Affidavit from the BESSD certifying possession of land identified for the Project, bearing the details of such land parcels where Project is located, and indemnifying SECI against any discrepancies in the above details.
ix. Documents to establish the compliance of technical requirement as per BESPA/RfS.
x. Invoices against purchase of the Batteries, Inverters/PCUs, SCADA and BMS along with the summary sheet containing the list of all the invoices, inverters including details and number of items. Lorry Receipts for delivery of Project components at site along with certified summary sheet by the authorized signatory. It is clarified that SECI shall bear no responsibility in declaration of commissioning/COD of the Project. However, on the basis of above documents, the BESSD shall be required to obtain No-objection certificate (NOC)/BESPA Compliance Certificate from SECI prior to declaration of commissioning/COD of the Project. SECI’s scope will be limited to verifying the installation of rated capacity (ies) of the Project, as per the COD certificate submitted by the BESSD. This verification will be at SECI’s discretion and shall not constitute any certification/confirmation of commissioning/COD of the Project by SECI. Prior to declaration of commencement of power supply, the BESSD shall submit COD certificate for the corresponding Installed Capacity which has commenced power supply to SECI as part of the requisite documents.