Synchronous area monitor Sample Clauses

Synchronous area monitor. The Nordic TSOs appointed Svenska kraftnät as the synchronous area monitor of the Nordic System. Since the Nordic synchronous area geographically corresponds with the Nordic LFC block, the synchronous area monitor works in close cooperation with the LFC block monitor on the implementation of its tasks. The synchronous area monitor shall implement the data collection and delivery process, which includes: • measurements of the system frequency; • calculation of the frequency quality evaluation data; and • delivery of the frequency quality evaluation data for the criteria application process The synchronous area monitor shall once every 3 months and within 3 months after the end of the analysed period (see chapter 12). • collect frequency quality evaluation data; and • calculate frequency quality evaluation criteria. With respect to the system states, the synchronous area monitor shall: • determine the system state with regard to the system frequency in accordance with Article 18(1) and (2) of the SOGL; • ensure that all TSOs of all synchronous areas are informed in case the system frequency deviation fulfils one of the criteria for the alert state referred to in Article 18. 4.1). The synchronous area monitor shall notify the results of the criteria application process for their synchronous area to ENTSO for Electricity for publication SOGL 133(1) SOGL 133(2) SOGL 132 SOGL 133(3) and
Synchronous area monitor. The Nordic TSOs appointed Svenska kraftnät as the synchronous area monitor of the Nordic System. Since the Nordic synchronous area geographically corresponds with the Nordic LFC block, the synchronous area monitor works in close cooperation with the LFC block monitor on the implementation of its tasks. The synchronous area monitor shall carry out the following tasks, as defined in the SOGL: The synchronous area monitor shall implement the data collection and delivery process, which includes: • measurements of the system frequency; • calculation of the frequency quality evaluation data; and • delivery of the frequency quality evaluation data for the criteria application process The synchronous area monitor shall once every 3 months and within 3 months after the end of the analysed period (see chapter 12). • collect frequency quality evaluation data; and • calculate frequency quality evaluation criteria. With respect to the system states, the synchronous area monitor shall: • determine the system state with regard to the system frequency in accordance with Article 18(1) and (2) of the SOGL; • ensure that all TSOs of all synchronous areas are informed in case the system frequency deviation fulfils one of the criteria for the alert state referred to in Article 18. The synchronous area monitor shall monitor the electrical time deviation, calculate the frequency setpoint adjustments; and coordinate the actions of the time control process (see section 0). SOGL 133(1) SOGL 133(2) SOGL 132 SOGL 133(3) and
Synchronous area monitor. The LFC block monitor shall for each quarter deliver the frequency quality SOGL 134(4)

Related to Synchronous area monitor

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • Access Toll Connecting Trunk Group Architecture 8.2.1 If Reconex chooses to subtend a Verizon access Tandem, Reconex’s NPA/NXX must be assigned by Reconex to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center subtends as identified in the LERG. 8.2.2 Reconex shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from Reconex’s Customers. 8.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office Reconex utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the Tandem Verizon utilizes to provide Exchange Access in such LATA. 8.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow Reconex’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access tandem.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.