System Lines Clause Samples

The 'System Lines' clause defines the boundaries and components of a system as they pertain to the agreement. It typically specifies which physical or logical lines, such as electrical, data, or communication lines, are included within the scope of the contract and who is responsible for their installation, maintenance, or ownership. By clearly delineating these system lines, the clause helps prevent disputes over responsibility and ensures that all parties understand the extent of their obligations regarding system infrastructure.
System Lines. The eBill infrastructure is operated simultaneously across multiple system lines. There are two system lines available for the network partners and other system participants to use. These are the production platform (P level) and the test platform (X level).
System Lines. The platform shall be operated in parallel in various system lines. Two system lines shall be available for use by service providers and service users (hereinafter referred to as “participants”): production system (P level) and test system (X level).
System Lines. CaaS shall be operated parallel in various system lines. Two system lines are available for participants to use. The production system (P level) and the test system (X level).

Related to System Lines

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades. 5.2.1 As described in Section 32.3.5.3 of the SGIP in Attachment Z of the ISO OATT, the responsibility of the Interconnection Customer for the cost of the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement shall be determined in accordance with Attachment S of the ISO OATT, as required by Section 32.3.5.3.2

  • System Use (a) An electronic site access system may be used on site, subject to the requirements of this statement. (b) The system operates via: (i) a facial recognition device; and (ii) an electronic gate. (c) The system will be installed at the access and egress point/s of the site and will only be utilised to identify presence on site. (d) The purpose for which the electronic site access system will be implemented is to ensure: (i) avoiding unauthorised access to site; (ii) confirmation and co-ordination of effort in emergency situations; and (iii) confirmation that all entrants to site have received a site specific induction; (e) The only personal data collected by the system is a site entrant’s: (i) image; (ii) first & last name; (iii) mobile phone number; (iv) email address; and (v) employer’s name. (the Collected Data) (f) The Collected Data will only be held or used for the purposes specified above, unless otherwise by consent or required by law. (g) The Employer will not use the electronic site access control system to verify who was on a site at a particular time for the purpose of: (i) evaluating whether a variation claim regarding labour costs made by a subcontractor can be substantiated; (ii) taking disciplinary action against an Employee, or assisting a subcontractor to take disciplinary action against its own employees, regarding their start and finish times; or (iii) otherwise generally tracking a worker’s movements whilst on the site.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.