SYSTEM MONITORING EQUIPMENT. A revenue grade monitoring system will be used to provide the actual kWh production data from the System. On an annual basis the monitoring system will be tested by Operator at its sole cost and expense to verify that it is operating as intended. Automatic e-mail alerts will be setup at the time of System commissioning, which will send alerts if the System goes offline at any time for any reason. Owner will be notified of alerts and Operator will acknowledge the alerts and respond with a reason for the alert or an action plan to continue to monitor for changes or troubleshoot the problem.
SYSTEM MONITORING EQUIPMENT. The revenue grade monitoring system will be used to provide the actual kWh production data from the System. On an annual basis, the monitoring system will be tested to verify that it is operating as intended. Automatic e-mail alerts will be setup within ten (10) days of the execution of each Rider. Automatic e-mail alerts will be issued by the monitoring system if the System goes offline at any time for any reason. Company will be notified of alerts and Contractor will acknowledge the alerts. Contractor will respond as needed to troubleshoot the problem within the timeframe specified above. Setup, maintenance and administration, via the monitoring system’s online or software interface, of alerts and equipment parameters (e.g., string or zone level monitoring, expected energy output per manufacturer specifications, accounting for actual installation characteristics even if different from blueprints) will be included in the Services provided by Contractor.
SYSTEM MONITORING EQUIPMENT. The developer of the PV facility shall be required to provide and install a dynamic system monitoring equipment that conforms to PREPA's specifications.
SYSTEM MONITORING EQUIPMENT. Not less than two (2) times per year, the monitoring system, including the DAS system, will be tested by Operator to verify that it is operating as intended.

Related to SYSTEM MONITORING EQUIPMENT

  • Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.

  • MEASURING EQUIPMENT 1. Seller will maintain and operate, at its own, expense and at the point of delivery of gas hereunder, a meter or meters and other necessary equipment by which the volume of gas delivered hereunder shall be measured. Such meters and equipment shall remain the property of the Seller. 2. ▇▇▇▇▇ agrees to furnish to Seller for operating Seller's meters, at not cost to Seller. 3. ▇▇▇▇▇ agrees to change the charts on meters at no cost to Seller and forward same to Seller. 4. Buyer hereby grants to Seller suitable rights-of-way and easements necessary or incidental for the installation, maintenance, operation and removal of pipeline and other facilities together with rights of ingress thereto and egress there from at all times and hereby agrees to deliver to Seller, for the sum of one dollar ($1 .00), an appropriate instrument or grant defining such rights and easements located on Buyer's plant site. 5. Buyer may install, maintain and operate such check measuring equipment, including a recording gravitometer and calorimeter as it shall desire, provided that such equipment shall be so installed so as not to interfere with the operation of Seller's measuring equipment at or near the point of deliver. However, all ▇▇▇▇▇▇▇▇ to the Buyer shall be based on the metering of the Seller, subject only to the provisions of Paragraph 8 of this Article. 6. Each party shall have the right to be present at the time of any installing, reading, cleaning, changing, repairing, inspecting, testing, calibrating, or adjusting done in connection with the other's measuring equipment used in measuring deliveries hereunder and each party shall advise the other of any intended major maintenance operation sufficiently in advance in order that the other party may conveniently have its representative present. 7. All installation of measuring equipment, applying to or effecting deliveries hereunder, shall be made in such manner as to permit an accurate determination of the quantity of gas delivered and ready verification of the accuracy of measurement. Orifice meter installations, if used, shall conform to the recommendation for design and installation contained in the Gas Measurement Committee Report No. 3 to the American Gas Association published April, 1955, and any modifications and amendments thereof and shall include the use of flange connections. 8. Measurement on meter or meters shall be conclusive of both parties except where the meter is defective or fails to register, or if found in error, in either of which case Seller shall (a) By using the registration of any check meter if installed and accurately registering, or, in the absence of (a): (b) By correcting the error if the percentage of error by calibration, test or mathematical calculation, or, in the absence of both (a) and (b) then: (c) By estimating the quantity of delivery from deliveries during periods under similar conditions when the meter was registering accurately; and an appropriate billing adjustment shall be made in accordance wtth the current Rules and Regulations governing gas systems issued by the Commission. 9. Seller will maintain its meters in good order and to this end will make periodic tests of its meters pursuant to the current Rules and Regulations governing gas systems issued by the Commission, or at such shorter intervals as seem to Seller desirable. If ▇▇▇▇▇ is dissatisfied with the accuracy at any time, it may call upon Seller to have the meter tested ·in accordance with all regulations relating to such tests and results of such tests as found in the current Rules and Regulations governing gas systems issued by the Commission. 10. Each party shall preserve all records for a period of at least two (2) years.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Capital Equipment Collaborator’s commitment, if any, to provide ICD with capital equipment to enable the research and development activities under the Research Plan appears in Appendix B. If Collaborator transfers to ICD the capital equipment or provides funds for ICD to purchase it, then ICD will own the equipment. If Collaborator loans capital equipment to ICD for use during the CRADA, Collaborator will be responsible for paying all costs and fees associated with the transport, installation, maintenance, repair, removal, or disposal of the equipment, and ICD will not be liable for any damage to the equipment.