System Restoration Sample Clauses

System Restoration. The CAISO shall reinstate normal operation of the EIM at such time as it determines that the EIM disruption has been resolved.
System Restoration. In the event that a System shutdown occurs affecting all or part of the NEPOOL Control Area, the ISO shall, in accordance with the System Rules and Procedures, coordinate the restoration of service in conjunction with the Satellites and other NEPOOL Participant control centers.
System Restoration. Sewa▇▇ ▇▇▇tion can supply black start energy to the Transmission system through the use of energy from the diesel generators at the Conemaugh Station, via the 115 kV S▇▇▇▇▇-▇▇▇emaugh transmission line. In the event that a system-wide blackout occurs, the station may be called upon to provide an initial source of energy for the restoration of the Company and regional transmission systems. When requested, the Producer will start a generating unit and coordinate its operation with the Transmission Operators.
System Restoration. When a Temporary Shutdown is in effect, Purchaser will use best efforts to restore conditions as swiftly as possible so that the System can resume full operation.
System Restoration. 3.1 In an Emergency Condition, GENERATOR shall cooperate fu ly with AP GENERATOR s efforts for System Restoration. Area shall make System Restoration Services available to the Contro AP's Control Area in order to start generators in or before making such services available directly to generato Area. Within sixty (60) entities outside of AP's Control minutes of AP's notification to GENERATOR GENERATOR shall have Qualified Personnel available at the Project. AP may elect to perform periodic testing of AP's System Restoration plan. G on ' such efforts. AP may require GENERATOR to have Qualified Per Restoration meetings. f System Restoration conditions, RATOR shall cooperate with AP participate in AP's System on of additional hardware that ENERATOR for its out of pocket
System Restoration. 3.2 If found mutually desirable, AP and GENERATOR may negotiate costs for may enhance System Restoration Capability. In all cases, AP will compensate costs of providing or testing any level of System Restoration Services.
System Restoration. In the event the application server suffers a non-recoverable physical failure a spare system will be deployed. The spare server will be loaded with system, application, configuration, and data files obtained from backup tapes. RLDatix will bring the spare system into operation within 24 hours or if unable to do so, will deduct the applicable hosting charges for every 24-hour period that the system is unavailable for use by Client.

Related to System Restoration

  • Outage Restoration If an outage on the Attachment Facilities or System Upgrade Facilities or System Deliverability Upgrades of the Connecting Transmission Owner or Developer adversely affects the other Party’s operations or facilities, the Party that owns the facility that is out of service shall use Reasonable Efforts to promptly restore such facility(ies) to a normal operating condition consistent with the nature of the outage. The Party that owns the facility that is out of service shall provide the other Party and NYISO, to the extent such information is known, information on the nature of the Emergency State, an estimated time of restoration, and any corrective actions required. Initial verbal notice shall be followed up as soon as practicable with written notice explaining the nature of the outage.

  • Restoration The Restoration Fund shall be disbursed by the Trustee in accordance with the following conditions: (a) If the cost of Restoration will exceed the Threshold Amount, prior to commencement of the Restoration the architects, general contractor(s), and plans and specifications for the Restoration shall be approved by Landlord, which approval shall not be unreasonably withheld or delayed, and which approval shall be granted to the extent that the plans and specifications depict a Restoration which is substantially similar to the Improvements and Equipment which existed prior to the occurrence of the casualty or Taking, whichever is applicable. Landlord will not withhold its consent for variations to the Improvements required as a result of current zoning and building code requirements. (b) At the time of any disbursement, no Event of Default shall exist and no mechanics’ or materialmen’s Liens shall have been filed and remain undischarged or unbonded or for which Tenant shall fail to provide affirmative title insurance coverage. (c) Disbursements shall be made from time to time in an amount not exceeding the hard and soft cost of the work and costs incurred since the last disbursement upon receipt of (1) satisfactory evidence, including architects’ certificates of the stage of completion, of the estimated cost of completion and of performance of the work to date in a good and workmanlike manner in accordance with the contracts and the plans and specifications, (2) partial releases of Liens or conditional Lien waivers, and (3) other reasonable evidence of cost and payment so that Landlord can verify that the amounts disbursed from time to time are represented by work that is completed in place or delivered to the site and free and clear of mechanics’ Lien claims. (d) Each request for disbursement shall be sent by Tenant to Landlord and to the Trustee, accompanied by a certificate of Tenant describing the work, materials or other costs or expenses, for which payment is requested and stating (i) the cost incurred in connection therewith, (ii) that no Event of Default exists and no mechanics’ or materialmen’s Liens shall have been filed and remain undischarged or unbonded, and (iii) that Tenant has not previously received payment for such work or expense; the certificate to be delivered by Tenant upon completion of the work shall, in addition, state that the work that is the subject of the request for disbursement has been substantially completed and complies with the applicable requirements of this Lease. The Trustee shall not release funds from the Restoration Fund unless and until it has received a written authorization from Landlord approving such release, which ▇▇▇▇▇▇▇▇ agrees to promptly give if ▇▇▇▇▇▇ has satisfied all of the requirements set forth in this Paragraph 15 in connection with such release. (e) The Trustee shall retain a commercially reasonable retainage amount (but in no event less than 5% of the expected repair cost, other than general conditions, until the Restoration is 50% complete). (f) The Restoration Fund shall be held by the Trustee and shall be invested as directed by Landlord. All interest shall become a part of the Restoration Fund. (g) At all times the undisbursed balance of the Restoration Fund held by the Trustee, plus any funds contributed thereto by ▇▇▇▇▇▇, at its option, shall be not less than the cost of completing the Restoration (as reasonably estimated by ▇▇▇▇▇▇, provided that Tenant shall provide to Landlord the basis for such estimate, in reasonable detail, promptly after Landlord’s request therefor), free and clear of all Liens. (h) In addition, prior to commencement of Restoration and at any time during Restoration, if the estimated cost of Restoration, as reasonably determined by a contractor or architect mutually selected by Landlord and Tenant, exceeds the amount of the Net Proceeds or the Net Award, as applicable, and Tenant Insurance Payment available for such Restoration, either, at Tenant’s option and determination, the amount of such excess shall be paid by Tenant to the Trustee to be added to the Restoration Fund or Tenant shall fund at its own expense the costs of such Restoration until the remaining Restoration Fund is sufficient for the completion of the Restoration. Any sum in the Restoration Fund which remains in the Restoration Fund upon the completion of Restoration with respect to a casualty shall be paid to Tenant; any portion of a Net Award remaining after completion of Restoration with respect to a Taking shall be paid to Landlord.

  • Notice; Restoration Borrower shall promptly give Lender notice of the actual or threatened commencement of any condemnation or eminent domain proceeding affecting the Property (a “Condemnation”) and shall deliver to Lender copies of any and all papers served in connection with such Condemnation. Following the occurrence of a Condemnation, Borrower, regardless of whether an Award is available, shall promptly proceed to restore, repair, replace or rebuild the Property in accordance with Legal Requirements to the extent practicable to be of at least equal value and of substantially the same character (and to have the same utility) as prior to such Condemnation.

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades. 5.2.1 As described in Section 32.3.5.3 of the SGIP in Attachment Z of the ISO OATT, the responsibility of the Interconnection Customer for the cost of the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement shall be determined in accordance with Attachment S of the ISO OATT, as required by Section 32.3.5.3.2

  • Improvement Plan A detailed, written plan initiated by the evaluator. The teacher may provide input at the meeting to review the plan. Improvement plans are utilized when a teacher receives an Evaluation Rating of Ineffective or when an administrator utilizes discretion to place any teacher on an improvement plan at any time based on any individual deficiency in the evaluation system. The approved form for the Improvement Plan is attached to this agreement as Appendix A-9.