Testing Facility. The location of the testing facility and a list of test equipment shall be included in the QCP. The testing facility shall be located so that Quality Control test results are provided to the contract in a timely manner, be of sufficient size to conduct the Quality Control tests, and have a satisfactory base on which compaction of the soil in accordance with AASHTO T 99 (Method A) may be conducted. A statement of accessibility of the testing facility shall be included in the QCP that allows Department personnel to witness Quality Control activities and to review Quality Control tests. A list of the testing equipment proposed for Quality Control testing and the test methods and frequency of calibration or verification of the equipment shall be included in the QCP. The Design-Build Contractor shall maintain a record of all equipment calibration or verification results at the testing facility. The minimum frequency and procedures shall be as follows: Balances Verification 12 months ITM 910 Sieves Check Physical Condition 12 months ITM 902 Molds Check Dimensions 12 months ITM 914 Rammers Check Dimensions 12 months ITM 915
Appears in 3 contracts
Sources: Public Private Agreement, Public Private Agreement, Public Private Agreement