Quality Control Testing and Inspection Sample Clauses

The 'Quality Control, Testing and Inspection' clause establishes the standards and procedures for verifying that goods or services meet specified requirements before acceptance. It typically grants the buyer or client the right to inspect, test, or audit products at various stages of production or delivery, and may outline the process for addressing defects or non-conformities discovered during these checks. This clause ensures that only compliant and satisfactory goods or services are delivered, thereby reducing the risk of defects and disputes over quality.
Quality Control Testing and Inspection. 2.7.1 All materials used in the Work shall be new and unused, unless otherwise noted, and shall meet all quality requirements of the Contract Documents. 2.7.2 All construction materials to be used on the Work or incorporated into the Work, equipment, plant, tools, appliances or methods to be used in the Work may be subject to the inspection and approval or rejection by the City. Any material rejected by the City shall be removed immediately and replaced in an acceptable manner. 2.7.3 The procedures and methods used to sample and test material shall be determined by the City. Unless otherwise specified, samples and tests shall be made in accordance with the most recently adopted edition of the City of Flagstaff Engineering Division Design and Construction Standards and Specifications. 2.7.4 The City shall select a City or Independent Testing Laboratory and shall pay for initial City Acceptance Testing. 2.7.4.1 When the first and/or subsequent tests indicate noncompliance with the Contract Documents, the cost associated with that noncompliance and the cost of all tests, except the first test, shall be paid for by ▇▇▇▇. ▇▇▇▇’▇ Contingency cannot be utilized for the cost of re-testing. 2.7.4.2 When the first and/or subsequent tests indicate noncompliance with the Contract Documents, all retesting shall be performed by the same testing agency. 2.7.5 ▇▇▇▇ shall cooperate with the selected testing laboratory and all others responsible for testing and inspecting the work and shall provide them access to the Work at all times. 2.7.6 At the option of the City, materials may be approved at the source of supply before delivery is started. 2.7.7 Code compliance testing and inspections required by codes or ordinances, or by a plan approval authority, and which are made by a legally constituted authority, shall be the responsibility of and shall be paid by ▇▇▇▇, unless otherwise provided in the Contract Documents. 2.7.8 ▇▇▇▇’▇ convenience and quality control testing and inspections shall be the sole responsibility of ▇▇▇▇ and paid by ▇▇▇▇.
Quality Control Testing and Inspection. (A) All materials used in the Work shall be new and unused, unless otherwise noted, and shall meet all quality requirements of the Contract Documents. (B) All construction materials to be used on the Work or incorporated into the Work, equipment, plant, tools, appliances or methods to be used in the Work may be subject to the inspection and approval or rejection by the City. Any material rejected by the City shall be removed immediately and replaced in an acceptable manner. (C) The procedures and methods used to sample and test material will be determined by the City. (D) The City will select a pre‐qualified City or Independent Testing Laboratory and will pay for initial City Acceptance Testing. (E) When the first and subsequent tests indicate noncompliance with the Contract Documents, the cost associated with that noncompliance will be paid for by the CM@Risk. CM@Risk’s Contingency cannot be utilized for the cost of re‐testing. (F) When the first and subsequent tests indicate noncompliance with the Contract Documents, all retesting shall be performed by the same testing agency. (G) The CM@Risk will cooperate with the selected testing laboratory and all others responsible for testing and inspecting the work and shall provide them access to the Work at all times. (H) At the option of the City, materials may be approved at the source of supply before delivery is started. (I) Code compliance testing and inspections required by codes or ordinances, or by a plan approval authority, and which are made by a legally constituted authority, shall be the responsibility of and shall be paid by the CM@Risk as a Cost of the Work, unless otherwise provided in the Contract Documents. (J) CM@Risk’s convenience and quality control testing and inspections shall be the sole responsibility of the CM@Risk and paid by the CM@Risk.
Quality Control Testing and Inspection 

Related to Quality Control Testing and Inspection

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner. 2.1.2 The NYISO and Connecting Transmission Owner shall each provide the Interconnection Customer written acknowledgment that it has received the Interconnection Customer’s written test report. Such written acknowledgment shall not be deemed to be or construed as any representation, assurance, guarantee, or warranty by the NYISO or Connecting Transmission Owner of the safety, durability, suitability, or reliability of the Small Generating Facility or any associated control, protective, and safety devices owned or controlled by the Interconnection Customer or the quality of power produced by the Small Generating Facility.

  • TESTING AND INSPECTION 29 6.1 Pre-Commercial Operation Date Testing and Modifications. 29

  • Inspection/Testing In order to assess Supplier’s work quality and/or compliance with this Order, upon reasonable notice by Buyer: (a) all goods, materials and services related to the items purchased hereunder, including, raw materials, components, assemblies, work in process, tools and end products shall be subject to inspection and testing by Buyer, its customer, representative or regulatory authorities at all places, including sites where the goods are made or located or the services are performed, whether at Supplier’s premises or elsewhere; and (b) all of Supplier’s facilities, books and records relating to this Order shall be subject to inspection by Buyer or its designee. If specific Buyer and/or Buyer’s customer tests, inspection and/or witness points are included in this Order, the goods shall not be shipped without an inspector’s release or a written waiver of test/inspection/witness with respect to each such point; however, Buyer shall not be permitted to unreasonably delay shipment; and Supplier shall notify Buyer in writing at least twenty (20) days prior to each of Supplier’s scheduled final and, if applicable, intermediate test/inspection/witness points. Supplier agrees to cooperate with such/audit inspection including, completing and returning questionnaires and making available its knowledgeable representatives. Buyer’s failure to inspect or test goods, materials or services or Buyer’s failure to reject or detect defects by inspection or testing shall not relieve Supplier from its warranty obligations or any of its other obligations or responsibilities under this Order. Supplier agrees to provide small business as well as minority and/or women owned business utilization and demographic data upon request.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities (including required control technologies and protection systems) and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer’s Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Post-Commercial Operation Date Testing and Modifications Developer and Connecting Transmission Owner shall each at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice and Applicable Reliability Standards as may be necessary to ensure the continued interconnection of the Large Generating Facility with the New York State Transmission System in a safe and reliable manner. Developer and Connecting Transmission Owner shall each have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.