Testing Facility Sample Clauses

POPULAR SAMPLE Copied 1 times
Testing Facility. The location of the testing facility and a list of test equipment shall be included in the QCP. The testing facility shall be located so that Quality Control test results are provided to the contract in a timely manner, be of sufficient size to conduct the Quality Control tests, and have a satisfactory base on which compaction of the soil in accordance with AASHTO T 99 (Method A) may be conducted. A statement of accessibility of the testing facility shall be included in the QCP that allows Department personnel to witness Quality Control activities and to review Quality Control tests. A list of the testing equipment proposed for Quality Control testing and the test methods and frequency of calibration or verification of the equipment shall be included in the QCP. The Design-Build Contractor shall maintain a record of all equipment calibration or verification results at the testing facility. The minimum frequency and procedures shall be as follows: Balances Verification 12 months ITM 910 Sieves Check Physical Condition 12 months ITM 902 Molds Check Dimensions 12 months ITM 914 Rammers Check Dimensions 12 months ITM 915
Testing Facility. The Construction Manager will select a pre-qualified independent testing laboratory and will pay for initial City acceptance testing. 1. When the first and subsequent tests indicate noncompliance with the Contract Documents, the cost associated with that noncompliance and retesting will be paid for by the Construction Manager. Construction Manager’s Contingency cannot be utilized for the cost of re-testing. 2. When the first and subsequent tests indicate noncompliance with the Contract Documents, all retesting shall be performed by the same testing agency.
Testing Facility. An accredited medical facility or hospital where the City of Parma Heights requires all emergency drug testing to take place. The Ohio Patrolman’s Benevolent Association (OPBA) is the local bargaining unit for the Sergeants and Captains, Patrolman and Dispatchers/Matrons employed by the City of Parma Heights. Any hospital, clinic, lab or medical center that has the ability to test for presence of drugs in an individual. This outside agency must follow all federal, state and local laws regarding the testing of employees for drugs.
Testing Facility. The Chief/Superintendent shall consult with the Union prior to selecting a facility to administer drug and alcohol tests and shall take into consideration the Union’s concerns with respect to the procedures followed by such facility. APPENDIX C WAGE SCALE WEEKLY
Testing Facility. 9.1 Shinsung will provide a test facility (the "Test Facility") at Shinsung's manufacturing facility to enable Shinsung to perform quality assurance testing, verification of configuration and other required testing of the Products in accordance with the Specifications. The Testing Facility will be constructed and configured in accordance with PRI's requirements. Shinsung will at all times, at its expense, maintain the Testing Facility in good condition, repair and cleanliness consistent with PRI requirements and practices for similar PRI facilities. 9.2 Shinsung will not permit any third party including, without limitation, any existing customer or potential customer of PRI, to have access to, inspect, or view the testing procedures at, the Testing Facility without the prior written consent of PRI.
Testing Facility. The independent firm hired by the City shall be certified under the Substance Abuse Mental Health Service Administration/College of American Pathologists Forensic Urine Drug Test Program (SAMHSA/CAP FUDTP) and be an Official Medical Review Officer (MRO). Such certified facility shall be experienced, shall be capable of quality control documentation and chain of custody, shall have demonstrated technical expertise and proficiency in urinalysis, and shall comply with all requirements of SAMSA/CAP FUDTP.

Related to Testing Facility

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Existing Facilities Each of the Existing Facilities shall be repaid in full and terminated and all collateral security therefor shall be released, and the Administrative Agent shall have received pay-off letters in form and substance satisfactory to it evidencing such repayment, termination and release.

  • Working Facilities During the Term of Employment, the Company shall furnish the Executive with an office, secretarial help and such other facilities and services suitable to his position and adequate for the performance of his duties hereunder.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Parking Facilities Alamo Colleges District shall make the existing parking facilities at the rented Facility available for the vehicular traffic and parking necessitated by the Organization’s Use of the rented Facility, on a non-exclusive basis, as specified at Exhibit A. MAXIMUM CAPACITY. Organization anticipates approximately the number of participants stated at Exhibit A and agrees to inform Alamo Colleges District of any significant changes five (5) business days in advance of a Use. Organization shall not admit a larger number of persons than can safely and freely move about the Facility. Alamo Colleges District shall notify Organization of the recommended capacity of the Facility and all decisions of Alamo Colleges District concerning questions arising under this Paragraph shall be final.