Theory Grading Clause Samples

Theory Grading a) Unit Exam 1 = 15% b) Unit Exam 2 = 15% c) Unit Exam 3 = 15% d) Unit Exam 4 = 15% e) Final Exam = 40% Grading Scale: A = 100 - 90 B = 89 - 80 C = 79 - 75 D = 74 - 60 F = below 60 *In order to pass the theory component of a course with a RNSG prefix, a minimum grade of “C” must be achieved.

Related to Theory Grading

  • Contamination The presence in, on or under land, air or water of a substance (whether a solid, liquid, gas, odour, heat, sound, vibration or radiation) at a concentration above the concentration at which the substance is normally present in, on or under land, air or water in the same locality, that presents a risk of Environmental Harm, including harm to human health or any other aspect of the Environment, or could otherwise give rise to a risk of non-compliance with any Statutory Requirement for the protection of the Environment.

  • Responsibility for Environmental Contamination 5.20.1 Neither Party shall be liable to the other for any costs whatsoever resulting from the presence or release of any Environmental Hazard that either Party did not introduce to the affected Work Location. Both Parties shall defend and hold harmless the other, its officers, directors and employees from and against any losses, damages, claims, demands, suits, liabilities, fines, penalties and expenses (including reasonable attorneys' fees) that arise out of or result from (i) any Environmental Hazard that the Indemnifying Party, its contractors or agents introduce to the Work Locations or (ii) the presence or release of any Environmental Hazard for which the Indemnifying Party is responsible under Applicable Law. 5.20.2 In the event any suspect materials within Qwest-owned, operated or leased facilities are identified to be asbestos containing, CLEC will ensure that to the extent any activities which it undertakes in the facility disturb such suspect materials, such CLEC activities will be in accordance with applicable local, state and federal environmental and health and safety statutes and regulations. Except for abatement activities undertaken by CLEC or equipment placement activities that result in the generation of asbestos-containing material, CLEC does not have any responsibility for managing, nor is it the owner of, nor does it have any liability for, or in connection with, any asbestos-containing material. Qwest agrees to immediately notify CLEC if Qwest undertakes any asbestos control or asbestos abatement activities that potentially could affect CLEC personnel, equipment or operations, including, but not limited to, contamination of equipment.

  • Aggravating and Mitigating Factors The penalties in this matter were determined in consideration of all relevant circumstances, including statutory factors as described in CARB’s Enforcement Policy. CARB considered whether the violator came into compliance quickly and cooperated with the investigation; the extent of harm to public health, safety and welfare; nature and persistence of the violation, including the magnitude of the excess emissions; compliance history; preventative efforts taken; innovative nature and the magnitude of the effort required to comply, and the accuracy, reproducibility, and repeatability of the available test methods; efforts to attain, or provide for, compliance prior to violation; action taken to mitigate the violation; financial burden to the violator; and voluntary disclosure. The penalties are set at levels sufficient to deter violations, to remove any economic benefit or unfair advantage from noncompliance, to obtain swift compliance, and the potential costs, risks, and uncertainty associated with litigation. Penalties in future cases might be smaller or larger depending on the unique circumstances of the case.

  • Compaction 11.1 Concrete shall be thoroughly compacted and fully worked around the reinforcement, around embedded fixtures and into corners of the formwork. 11.2 Concrete shall be compacted using mechanical vibrators complying with IS 2505, IS 2506, IS 2514 and IS:4656. Over vibration and under vibration of concrete are harm full and shall be avoided. Vibration of very wet mixes shall also be avoided. Whenever vibration has to be applied externally, the design of formwork and the disposition of vibrators shall receive special consideration to ensure efficient compaction and to avoid surface blemishes.

  • Available Relief for a Force Majeure Event 11.7.1 Subject to this Article 11: (a) no Party shall be in breach of its obligations pursuant to this Agreement except to the extent that the performance of its obligations was prevented, hindered or delayed due to a Force Majeure Event; (b) every Party shall be entitled to claim relief in relation to a Force Majeure Event in regard to its obligations, including but not limited to those specified under Article 4.5; (c) For avoidance of doubt, neither Party’s obligation to make payments of money due and payable prior to occurrence of Force Majeure events under this Agreement shall be suspended or excused due to the occurrence of a Force Majeure Event in respect of such Party. (d) Provided that no payments shall be made by either Party affected by a Force Majeure Event for the period of such event on account of its inability to perform its obligations due to such Force Majeure Event.